Show Job Controls
Bid Cobra

WOOD US0080 (6400-26-001)

Items: 51

County: WOOD
Length: N/A
Highway: US0080
District: TYLER
Control Number: 6400-26-001
DBE Goal: N/A
Project: RMC - 640026001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $595,390.00
Date: 06/01/2022 (4 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
PRESTON FREIEND
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$595,390.00
1
$449,833.00
Over/Under Est: -24.45% -$145,557.00
Over/Under Est: -21.46% -$127,757.00
Amt Left: 3.96% $17,800.00

Bid Items & Bid Tabulations

51 Total 0 of 51
WOOD  |  US0080  |  TYLER  |  6400-26-001  |  06/01/2022  |  $595,390.00  |  RMC - 640026001  |  METAL BEAM GUARD FENCE REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CATOCON, INC.
T&L CLEANING SERVICES LLC
REMOVING CONC (RIPRAP)
SY 10.000 $30.000 $30.000 $1.000
CONC STR REPAIR (STANDARD)
SF 10.000 $150.000 $100.000 $1.000
RIPRAP (MOW STRIP)(4 IN)
CY 10.000 $300.000 $250.000 $1.000
MOBILIZATION (CALLOUT)
EA 30.000 $300.000 $20.000 $200.000
MTL W-BEAM GD FEN (TIM POST)
LF 25.000 $50.000 $70.000 $30.000
MTL THRIE-BEAM GD FEN (TIM POST)
LF 25.000 $30.000 $50.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,000.000 $1,000.000 $1,500.000
MTL BEAM GD FEN TRANS (T101)
EA 2.000 $1,000.000 $1.000 $1.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 100.000 $9.000 $20.000 $1.000
MTL THRIE-BEAM GD FEN ADJUSTMENT
LF 190.000 $10.000 $1.000 $1.000
TRANSITION ADJUSTMENT
EA 2.000 $100.000 $1.000 $1.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $4,000.000 $1,000.000 $1,200.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 25.000 $15.000 $10.000 $20.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 25.000 $20.000 $9.000 $20.000
REMOVE METAL BEAM GUARD FENCE
LF 1,425.000 $10.000 $1.000 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $325.000 $75.000 $1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $4,000.000 $2,000.000 $4,000.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 2.000 $150.000 $1.000 $1.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $1.000 $1.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,875.000 $40.000 $40.000 $28.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 25.000 $45.000 $35.000 $1.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 5.000 $50.000 $100.000 $30.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 1,175.000 $100.000 $40.000 $20.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 60.000 $100.000 $100.000 $20.000
REPAIR STEEL POST WITH BASE PLATE
EA 22.000 $140.000 $325.000 $1.000
REALIGN POSTS
EA 104.000 $40.000 $100.000 $30.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 10.000 $40.000 $15.000 $10.000
REMOVE & REPLACE BLOCKOUT
EA 1,090.000 $40.000 $15.000 $10.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 340.000 $35.000 $45.000 $15.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 18.000 $100.000 $250.000 $50.000
REPLACE TERMINAL ANCHOR POSTS
EA 2.000 $100.000 $500.000 $1.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 45.000 $4,000.000 $4,300.000 $4,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 8.000 $1,300.000 $1,000.000 $700.000
REM & RESET SGT IMPACT HEAD
EA 8.000 $300.000 $50.000 $1.000
REPLACE SGT CABLE ASSEMBLY
EA 7.000 $150.000 $80.000 $1.000
REPLACE SGT CABLE ANCHOR
EA 6.000 $150.000 $80.000 $1.000
REPLACE SGT STRUT
EA 3.000 $150.000 $80.000 $1.000
REPLACE SGT OBJECT MARKER
EA 5.000 $35.000 $40.000 $1.000
REPAIR RAIL ELEMENT(W - BEAM FURNISHED)
LF 25.000 $16.000 $1.000 $20.000
REMOVE AND REPLACE (TRACC)
EA 2.000 $1,000.000 $500.000 $5,000.000
REPAIR (TRACC)
EA 2.000 $1,000.000 $100.000 $500.000
REPAIR (WIDE TRACC)
EA 2.000 $1,000.000 $100.000 $500.000
REPAIR (NARROW QUAD)
EA 2.000 $800.000 $100.000 $300.000
REPAIR (QUAD) (N) (BAY)
EA 2.000 $700.000 $100.000 $300.000
REMOVE AND REPLACE (FASTRACC)
EA 2.000 $1,500.000 $100.000 $5,000.000
REPAIR (FASTRACC) (BAY)
EA 2.000 $1,000.000 $100.000 $300.000
QUAD(N)(BAY)NOSE ASSMBLY(REMOVE&REPLAC)
EA 2.000 $800.000 $100.000 $500.000
REPAIR (STEEL POST W/ W-BEAM - T101)
LF 25.000 $95.000 $1.000 $1.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 5.000 $50.000 $1.000 $1.000
REPAIR(STEEL POST W/ CHANNEL IRON RAIL)
LF 75.000 $60.000 $1.000 $100.000
TMA (STATIONARY)
DAY 50.000 $300.000 $1.000 $2,000.000
Totals: $595,390.000 $449,833.000 $467,633.000