WOOD SL 564 (3240-01-019)

Items: 75

County: WOOD
Length: N/A
Highway: SL 564
District: TYLER
Control Number: 3240-01-019
DBE Goal: N/A
Project: STP 2019(323)
Guaranty: N/A
Time: 101 WORKING DAYS
Engineer's Estimate: $5,870,279.89
Date: 01/09/2019 (7 years ago)
Contract Number: N/A
Type: PLANING,PVMT RPR,ACP,OCST,PFS,MBGF,PV MK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$5,870,279.89
$5,773,806.79
Over/Under Est: -1.64% -$96,473.10
Over/Under Est: -0.44% -$25,600.56
Amt Left: 1.23% $70,872.54
Over/Under Est: -0.08% -$4,904.13
Amt Left: 1.59% $91,568.97
Delta: -0.35% -$20,696.43
Over/Under Est: 6.48% $380,258.31
Amt Left: 8.26% $476,731.41
Delta: -6.57% -$385,162.44

Bid Items & Bid Tabulations

75 Total 0 of 75
WOOD  |  SL 564  |  TYLER  |  3240-01-019  |  01/09/2019  |  $5,870,279.89  |  STP 2019(323)  |  PLANING,PVMT RPR,ACP,OCST,PFS,MBGF,P...  |  101 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
REYNOLDS & KAY, LTD.
LONGVIEW BRIDGE AND ROAD, LTD.
EAST TEXAS BRIDGE, INC.
HERITAGE ASPHALT COMPANY LLC
REMOVING CONC (DRIVEWAYS)
SY 368.000 $12.000 $15.000 $20.000 $20.000 $10.000
REMOVING CONCRETE(MOW STRIP)
LF 448.000 $10.000 $15.000 $11.500 $9.000 $7.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 104.000 $22.000 $30.000 $50.000 $25.000 $10.000
BACKFILL (TY A)
STA 363.580 $275.000 $220.000 $145.000 $300.000 $225.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 50,478.000 $0.850 $0.650 $0.650 $0.850 $1.000
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 25,238.000 $0.700 $0.650 $0.650 $0.700 $1.000
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 25,238.000 $0.700 $0.650 $0.630 $0.700 $1.000
VEGETATIVE WATERING
MG 1,077.000 $10.000 $15.000 $1.000 $7.000 $30.000
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 79,898.000 $2.800 $3.250 $3.150 $3.500 $4.000
AGGR (TY-PD GR-3 OR TY-PL GR-3)
CY 1,902.000 $120.000 $115.000 $129.000 $135.000 $175.000
D-GR HMA(SQ) TY-D PG64-22
TON 685.000 $150.000 $197.000 $140.000 $185.000 $100.000
PFC (ASPHALT) PG76-22
TON 388.000 $130.000 $144.000 $145.000 $140.000 $150.000
PFC-F (AGGR) PG76-22 SAC-A
TON 6,071.000 $135.000 $144.000 $145.000 $140.000 $150.000
SUPERPAVE MIXTURES SP-C PG70-22
TON 25,667.000 $100.000 $102.000 $102.000 $100.000 $101.500
SUPERPAVE MIXTURES SP-D PG70-22
TON 2,646.000 $110.000 $109.000 $114.000 $115.000 $100.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 4,000.000 $45.000 $44.000 $59.250 $55.000 $40.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 20,137.000 $2.000 $2.650 $3.000 $3.000 $2.500
PLANE ASPH CONC PAV (2")
SY 3,330.000 $2.250 $3.200 $3.550 $3.000 $3.000
PLANE ASPH CONC PAV (0" TO 5")
SY 6,209.000 $7.000 $4.000 $4.200 $5.000 $3.500
PLAN & TEXT ASPH CONC PAV (0" TO 2.75")
SY 7,853.000 $2.300 $3.500 $3.450 $5.000 $3.000
PLANE ASPH CONC PAV (2.75")
SY 2,738.000 $2.500 $4.000 $3.600 $5.000 $3.000
RIPRAP (CONC)(CL B)
CY 12.000 $350.000 $650.000 $1,200.000 $500.000 $500.000
RIPRAP (MOW STRIP)(4 IN)
CY 40.000 $500.000 $650.000 $545.000 $450.000 $500.000
MOBILIZATION
LS 1.000 $530,000.000 $251,000.000 $338,000.000 $300,000.000 $600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $4,800.000 $5,000.000 $3,000.000 $8,000.000 $6,500.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 50.000 $22.000 $15.000 $60.000 $50.000 $100.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 50.000 $80.000 $50.000 $100.000 $125.000 $100.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,000.000 $2.600 $3.000 $3.000 $4.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,000.000 $0.850 $1.000 $1.200 $1.000 $2.000
TRACKHOE WORK (EROSION & SEDMT CONT)
HR 50.000 $125.000 $85.000 $100.000 $150.000 $175.000
DRIVEWAYS (CONC) (HES)
SY 368.000 $92.000 $85.000 $110.000 $100.000 $85.000
RUMBLE STRIPS (SHOULDER)
LF 20,068.000 $0.180 $0.170 $0.250 $0.500 $0.300
RUMBLE STRIPS (CENTERLINE)
LF 10,034.000 $0.200 $0.170 $0.500 $0.800 $0.350
MTL W-BEAM GD FEN (TIM POST)
LF 450.000 $22.000 $20.000 $25.000 $21.000 $22.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,750.000 $1,530.000 $1,760.000 $1,800.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $3.500 $2.250 $4.400 $3.000 $3.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $250.000 $167.000 $248.000 $200.000 $175.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,500.000 $2,950.000 $2,900.000 $3,000.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $222.000 $275.000 $220.000 $250.000
PIPE UNDERDRAINS (TY 8) (6")
LF 5,000.000 $41.000 $43.000 $30.000 $10.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 26.000 $35.000 $28.000 $49.500 $35.000 $35.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 116.000 $0.230 $1.100 $1.100 $1.100 $1.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 83,804.000 $0.200 $0.110 $0.110 $0.120 $0.150
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 16,138.000 $0.350 $0.280 $0.280 $0.270 $0.250
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 791.000 $2.350 $2.750 $2.750 $3.000 $2.500
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 3,683.000 $0.220 $0.110 $0.110 $0.120 $0.150
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 70,824.000 $0.170 $0.110 $0.110 $0.120 $0.150
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 842.000 $1.000 $0.950 $1.250 $1.750 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 5,102.000 $1.250 $0.950 $1.250 $1.750 $1.000
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 1,624.000 $1.050 $1.100 $1.450 $1.750 $1.000
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 14,412.000 $1.100 $1.100 $1.450 $1.750 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 16,136.000 $0.750 $0.900 $0.880 $0.880 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,268.000 $5.000 $5.500 $5.500 $5.500 $5.500
REFL PAV MRK TY II (W) 4" (SLD)
LF 970.000 $0.280 $1.100 $1.100 $1.100 $1.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 970.000 $0.280 $1.100 $1.100 $1.100 $1.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 116.000 $0.350 $1.100 $1.100 $1.100 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 67,454.000 $0.250 $0.450 $0.440 $0.450 $0.500
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 2,434.000 $0.320 $0.500 $0.500 $0.500 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 59,698.000 $0.250 $0.450 $0.450 $0.450 $0.500
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 19,430.000 $0.820 $0.700 $0.700 $0.700 $0.750
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 1,249.000 $1.700 $0.800 $0.800 $0.800 $0.750
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 9,620.000 $1.000 $0.800 $0.800 $0.800 $0.750
PREFAB PAV MRK TY C (W) (ARROW)
EA 49.000 $195.000 $206.000 $200.000 $200.000 $200.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 5.000 $340.000 $278.000 $275.000 $300.000 $275.000
PREFAB PAV MRK TY C (W) (WORD)
EA 49.000 $260.000 $250.000 $250.000 $250.000 $275.000
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 128.000 $25.000 $39.000 $38.500 $45.000 $40.000
REFL PAV MRKR TY I-C
EA 608.000 $3.000 $3.750 $3.750 $4.000 $4.000
REFL PAV MRKR TY II-A-A
EA 4,634.000 $2.650 $3.500 $3.500 $4.000 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 1,940.000 $0.300 $1.100 $1.100 $1.100 $1.000
PAV SURF PREP FOR MRK (4")
LF 1,940.000 $0.150 $0.550 $0.550 $0.550 $0.500
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $90.000 $80.000 $65.000 $200.000 $700.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,500.000 $3,500.000 $6,000.000 $15,000.000 $20,000.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 625.000 $3.500 $9.000 $8.800 $9.000 $9.000
TMA (STATIONARY)
EA 1.000 $5,000.000 $9,200.000 $6,500.000 $30,000.000 $12,000.000
TMA (MOBILE OPERATION)
DAY 40.000 $23.000 $105.000 $110.000 $300.000 $125.000
Totals: $5,870,279.890 $5,773,806.790 $5,844,679.330 $5,865,375.760 $6,250,538.200