Show Job Controls
Bid Cobra

WOOD SH 182 (0429-01-023)

Items: 87

County: WOOD
Length: N/A
Highway: SH 182
District: TYLER
Control Number: 0429-01-023
DBE Goal: N/A
Project: STP 2017(358)HES
Guaranty: N/A
Time: 387 WORKING DAYS
Engineer's Estimate: $3,358,902.95
Date: 01/04/2017 (9 years ago)
Contract Number: N/A
Type: SAFETY TREAT FIXED OBJECTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$3,358,902.95
$3,239,526.94
Over/Under Est: -3.55% -$119,376.01
Over/Under Est: 4.9% $164,692.85
Amt Left: 8.77% $284,068.86
Over/Under Est: 14.45% $485,219.61
Amt Left: 18.66% $604,595.62
Delta: -9.10% -$320,526.76
Over/Under Est: 21.67% $727,901.80
Amt Left: 26.15% $847,277.81
Delta: -6.31% -$242,682.19
$4,367,340.25
Over/Under Est: 30.02% $1,008,437.30
Amt Left: 34.81% $1,127,813.31
Delta: -6.86% -$280,535.50

Bid Items & Bid Tabulations

87 Total 0 of 87
WOOD  |  SH 182  |  TYLER  |  0429-01-023  |  01/04/2017  |  $3,358,902.95  |  STP 2017(358)HES  |  SAFETY TREAT FIXED OBJECTS  |  387 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HIGHWAY 19 CONSTRUCTION LLC
LONGVIEW BRIDGE AND ROAD, LTD.
HARRISON, WALKER AND HARPER, LP
EAST TEXAS BRIDGE, INC.
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 26.800 $1,200.000 $2,500.000 $2,000.000 $757.000 $4,000.000 $10,000.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 4,172.000 $14.000 $20.000 $16.500 $16.600 $18.000 $35.000
BLADING
STA 397.400 $300.000 $500.000 $350.000 $9.900 $400.000 $350.000
FURNISHING AND PLACING TOPSOIL (4")
SY 38,123.000 $1.400 $5.000 $2.650 $3.300 $4.000 $2.250
BLOCK SODDING
SY 9,670.000 $3.000 $5.000 $4.400 $4.500 $4.500 $5.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 38,123.000 $1.250 $0.860 $1.000 $1.000 $1.000 $0.500
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 19,061.000 $1.250 $0.780 $0.850 $0.900 $0.950 $0.500
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 19,061.000 $1.250 $0.780 $0.850 $0.900 $0.950 $0.500
VEGETATIVE WATERING
MG 1,050.000 $20.000 $100.000 $10.000 $168.900 $10.000 $38.000
CUT & RESTORING PAV
SY 111.000 $120.000 $180.000 $200.000 $19.700 $200.000 $20.000
CUT & RESTORE CONC PAVING
SY 210.000 $65.000 $200.000 $175.000 $65.200 $150.000 $20.000
CUT & RESTORE ASPH PAVING
SY 2,255.000 $40.000 $45.000 $75.000 $42.000 $70.000 $120.000
CUT AND RESTORE PAV (FLEX BASE)
SY 2,391.000 $10.000 $25.000 $32.000 $21.000 $50.000 $85.000
FLOWABLE BACKFILL
CY 76.000 $250.000 $180.000 $300.000 $132.800 $250.000 $400.000
TEMPORARY SPL SHORING
SF 1,480.000 $30.000 $60.000 $50.000 $64.900 $50.000 $45.000
CL A CONC (SEAL)
CY 1.000 $400.000 $1,000.000 $1,500.000 $189.000 $1,500.000 $2,000.000
CL A CONC (COLLAR)
EA 107.000 $1,000.000 $1,100.000 $1,200.000 $839.000 $1,200.000 $1,500.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 320.000 $170.000 $180.000 $175.000 $157.000 $200.000 $185.000
RIPRAP (MOW STRIP)(4 IN)
CY 101.000 $500.000 $400.000 $525.000 $452.000 $550.000 $550.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 12.000 $450.000 $500.000 $740.000 $1,492.000 $1,000.000 $650.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 6.000 $700.000 $500.000 $1,375.000 $2,237.000 $1,000.000 $700.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 10.000 $700.000 $500.000 $900.000 $2,237.000 $1,000.000 $750.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 32.000 $800.000 $600.000 $630.000 $2,828.000 $1,200.000 $850.000
CONC BOX CULV (7 FT X 5 FT)(EXTEND)
LF 14.000 $800.000 $700.000 $900.000 $3,230.000 $1,200.000 $900.000
CONC BOX CULV (10 FT X 5 FT)(EXTEND)
LF 8.000 $1,100.000 $800.000 $1,250.000 $3,532.000 $1,300.000 $1,000.000
CONC BOX CULV (10 FT X 9 FT)(EXTEND)
LF 8.000 $1,500.000 $1,100.000 $1,325.000 $3,607.000 $1,500.000 $1,200.000
CONC BOX CULV (5 FT X 6.5 FT)(EXTEND)
LF 4.000 $750.000 $700.000 $2,050.000 $3,356.000 $1,250.000 $700.000
RC PIPE (CL III)(15 IN)
LF 8.000 $50.000 $30.000 $85.000 $59.000 $50.000 $50.000
RC PIPE (CL III)(18 IN)
LF 8,624.000 $60.000 $35.000 $41.000 $62.000 $55.000 $55.000
RC PIPE (CL III)(24 IN)
LF 1,130.000 $50.000 $45.000 $60.000 $72.000 $75.000 $75.000
RC PIPE (CL III)(30 IN)
LF 248.000 $75.000 $55.000 $90.000 $94.000 $90.000 $85.000
RC PIPE (CL III)(36 IN)
LF 236.000 $95.000 $150.000 $112.000 $113.000 $125.000 $125.000
RC PIPE (CL III)(42 IN)
LF 24.000 $130.000 $166.000 $180.000 $144.000 $150.000 $185.000
RC PIPE (CL III)(48 IN)
LF 202.000 $170.000 $185.000 $185.000 $160.000 $175.000 $210.000
RC PIPE (CL III)(54 IN)
LF 80.000 $200.000 $230.000 $225.000 $203.000 $200.000 $250.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 1.000 $3,200.000 $3,500.000 $5,000.000 $5,145.000 $5,000.000 $5,000.000
JCTBOX(COMPL)(PJB)(5FTX5FT)
EA 2.000 $5,000.000 $5,000.000 $8,000.000 $7,778.000 $7,000.000 $5,000.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 1.000 $5,500.000 $3,000.000 $5,700.000 $18,123.000 $5,500.000 $5,000.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 1.000 $8,000.000 $3,500.000 $8,500.000 $18,481.000 $9,000.000 $7,000.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 4.000 $10,500.000 $5,500.000 $10,750.000 $18,916.000 $11,000.000 $9,000.000
HEADWALL (CH - PW - 0) (DIA= 54 IN)
EA 4.000 $11,800.000 $7,500.000 $8,200.000 $18,255.000 $12,000.000 $12,500.000
WINGWALL (PW - 2) (HW=11 FT)
EA 1.000 $25,000.000 $30,000.000 $24,000.000 $24,797.000 $30,000.000 $48,500.000
WINGWALL (PW - 2) (HW=5 FT)
EA 4.000 $9,000.000 $6,500.000 $8,000.000 $23,126.000 $7,000.000 $1,400.000
WINGWALL (PW - 2) (HW=6 FT)
EA 4.000 $13,500.000 $7,000.000 $13,000.000 $24,630.000 $14,000.000 $15,000.000
WINGWALL (PW - 2) (HW=7 FT)
EA 3.000 $15,000.000 $8,000.000 $11,500.000 $24,965.000 $16,000.000 $16,000.000
WINGWALL (PW - 2) (HW=8 FT)
EA 2.000 $20,000.000 $9,500.000 $18,000.000 $27,484.000 $23,000.000 $23,500.000
SET (REPLACE PIPE RUNNER)
EA 12.000 $500.000 $4,000.000 $2,000.000 $604.000 $1,500.000 $500.000
SET (TY II) (15 IN) (RCP) (4: 1) (C)
EA 2.000 $400.000 $350.000 $530.000 $1,059.000 $550.000 $500.000
SET (TY II) (15 IN) (RCP) (6: 1) (P)
EA 4.000 $550.000 $400.000 $550.000 $1,115.000 $600.000 $550.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 3.000 $800.000 $375.000 $515.000 $1,087.000 $600.000 $850.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 29.000 $750.000 $400.000 $550.000 $1,086.000 $600.000 $850.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 512.000 $750.000 $525.000 $640.000 $1,009.000 $600.000 $550.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000 $950.000 $500.000 $615.000 $1,019.000 $600.000 $850.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 36.000 $1,000.000 $650.000 $750.000 $1,181.000 $900.000 $950.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 34.000 $1,100.000 $800.000 $950.000 $1,392.000 $1,000.000 $1,250.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 25.000 $1,700.000 $1,175.000 $1,100.000 $1,546.000 $1,600.000 $1,850.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000 $1,900.000 $1,900.000 $1,450.000 $1,839.000 $1,800.000 $2,000.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 17.000 $2,400.000 $2,625.000 $2,400.000 $2,486.000 $4,500.000 $3,000.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $2,600.000 $4,000.000 $4,800.000 $3,492.000 $6,000.000 $3,500.000
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 6.000 $3,600.000 $4,400.000 $3,700.000 $3,145.000 $6,500.000 $4,000.000
SET (TY II) (48 IN) (RCP) (3: 1) (C)
EA 2.000 $4,500.000 $3,500.000 $3,800.000 $3,465.000 $6,500.000 $5,000.000
SET (TY II) (48 IN) (RCP) (4: 1) (C)
EA 8.000 $4,800.000 $4,900.000 $4,400.000 $3,938.000 $7,000.000 $5,000.000
CLEAN EXIST CULVERTS
EA 12.000 $1,800.000 $1,500.000 $3,000.000 $945.000 $2,500.000 $1,000.000
REMOV STR (PIPE)
LF 190.000 $18.000 $20.000 $45.000 $21.000 $25.000 $30.000
REMOV STR (PIPE)
EA 275.000 $400.000 $250.000 $550.000 $143.000 $500.000 $250.000
REMOVE STR (RAIL)
LF 1,455.000 $20.000 $10.000 $10.000 $17.000 $12.000 $30.000
MOBILIZATION
LS 1.000 $306,511.000 $240,000.000 $285,000.000 $134,492.000 $350,000.000 $400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 28.000 $4,000.000 $5,000.000 $2,750.000 $1,560.000 $10,000.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,095.000 $30.000 $25.000 $40.000 $59.000 $35.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 1,095.000 $8.000 $10.000 $11.000 $42.000 $8.000 $15.000
EXCAV (EROSN & SEDMT CONT, IN VEH)
CY 1,000.000 $25.000 $15.000 $15.000 $4.600 $25.000 $20.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 250.000 $115.000 $50.000 $180.000 $123.000 $75.000 $150.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,647.000 $2.750 $3.000 $5.500 $3.600 $3.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,647.000 $0.750 $1.000 $1.950 $1.400 $0.750 $2.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 2,720.000 $5.000 $5.000 $16.750 $4.700 $5.500 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,720.000 $0.500 $1.000 $4.800 $2.700 $1.000 $8.000
TRACKHOE WORK (EROSION & SEDMT CONT)
HR 150.000 $230.000 $100.000 $210.000 $176.000 $100.000 $150.000
MTL W-BEAM GD FEN (TIM POST)
LF 625.000 $20.000 $17.000 $22.000 $20.500 $20.000 $25.000
MTL W-BEAM GD FEN (STEEL POST)
LF 50.000 $40.000 $72.000 $95.000 $62.500 $60.000 $45.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,600.000 $1,600.000 $1,800.000 $1,704.000 $1,800.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 678.000 $2.500 $5.000 $5.500 $2.300 $2.200 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $210.000 $400.000 $135.000 $140.400 $165.000 $1,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $2,200.000 $2,250.000 $2,300.000 $1,307.000 $1,300.000 $2,850.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $300.000 $250.000 $170.400 $175.000 $1,500.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 12.000 $28.000 $22.000 $30.000 $17.000 $20.000 $100.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 144.000 $65.000 $55.000 $71.000 $51.000 $50.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 30.000 $50.000 $37.000 $46.500 $28.000 $30.000 $100.000
Totals: $3,358,902.950 $3,239,526.940 $3,523,595.800 $3,844,122.560 $4,086,804.750 $4,367,340.250