PREPARING ROW
|
STA
|
26.800
|
$1,200.000
|
$2,500.000
|
$2,000.000
|
$757.000
|
$4,000.000
|
$10,000.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
4,172.000
|
$14.000
|
$20.000
|
$16.500
|
$16.600
|
$18.000
|
$35.000
|
|
|
BLADING
|
STA
|
397.400
|
$300.000
|
$500.000
|
$350.000
|
$9.900
|
$400.000
|
$350.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
38,123.000
|
$1.400
|
$5.000
|
$2.650
|
$3.300
|
$4.000
|
$2.250
|
|
|
BLOCK SODDING
|
SY
|
9,670.000
|
$3.000
|
$5.000
|
$4.400
|
$4.500
|
$4.500
|
$5.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
38,123.000
|
$1.250
|
$0.860
|
$1.000
|
$1.000
|
$1.000
|
$0.500
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
19,061.000
|
$1.250
|
$0.780
|
$0.850
|
$0.900
|
$0.950
|
$0.500
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
19,061.000
|
$1.250
|
$0.780
|
$0.850
|
$0.900
|
$0.950
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
1,050.000
|
$20.000
|
$100.000
|
$10.000
|
$168.900
|
$10.000
|
$38.000
|
|
|
CUT & RESTORING PAV
|
SY
|
111.000
|
$120.000
|
$180.000
|
$200.000
|
$19.700
|
$200.000
|
$20.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
210.000
|
$65.000
|
$200.000
|
$175.000
|
$65.200
|
$150.000
|
$20.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
2,255.000
|
$40.000
|
$45.000
|
$75.000
|
$42.000
|
$70.000
|
$120.000
|
|
|
CUT AND RESTORE PAV (FLEX BASE)
|
SY
|
2,391.000
|
$10.000
|
$25.000
|
$32.000
|
$21.000
|
$50.000
|
$85.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
76.000
|
$250.000
|
$180.000
|
$300.000
|
$132.800
|
$250.000
|
$400.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,480.000
|
$30.000
|
$60.000
|
$50.000
|
$64.900
|
$50.000
|
$45.000
|
|
|
CL A CONC (SEAL)
|
CY
|
1.000
|
$400.000
|
$1,000.000
|
$1,500.000
|
$189.000
|
$1,500.000
|
$2,000.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
107.000
|
$1,000.000
|
$1,100.000
|
$1,200.000
|
$839.000
|
$1,200.000
|
$1,500.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
320.000
|
$170.000
|
$180.000
|
$175.000
|
$157.000
|
$200.000
|
$185.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
101.000
|
$500.000
|
$400.000
|
$525.000
|
$452.000
|
$550.000
|
$550.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
12.000
|
$450.000
|
$500.000
|
$740.000
|
$1,492.000
|
$1,000.000
|
$650.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
6.000
|
$700.000
|
$500.000
|
$1,375.000
|
$2,237.000
|
$1,000.000
|
$700.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
10.000
|
$700.000
|
$500.000
|
$900.000
|
$2,237.000
|
$1,000.000
|
$750.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
32.000
|
$800.000
|
$600.000
|
$630.000
|
$2,828.000
|
$1,200.000
|
$850.000
|
|
|
CONC BOX CULV (7 FT X 5 FT)(EXTEND)
|
LF
|
14.000
|
$800.000
|
$700.000
|
$900.000
|
$3,230.000
|
$1,200.000
|
$900.000
|
|
|
CONC BOX CULV (10 FT X 5 FT)(EXTEND)
|
LF
|
8.000
|
$1,100.000
|
$800.000
|
$1,250.000
|
$3,532.000
|
$1,300.000
|
$1,000.000
|
|
|
CONC BOX CULV (10 FT X 9 FT)(EXTEND)
|
LF
|
8.000
|
$1,500.000
|
$1,100.000
|
$1,325.000
|
$3,607.000
|
$1,500.000
|
$1,200.000
|
|
|
CONC BOX CULV (5 FT X 6.5 FT)(EXTEND)
|
LF
|
4.000
|
$750.000
|
$700.000
|
$2,050.000
|
$3,356.000
|
$1,250.000
|
$700.000
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
8.000
|
$50.000
|
$30.000
|
$85.000
|
$59.000
|
$50.000
|
$50.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
8,624.000
|
$60.000
|
$35.000
|
$41.000
|
$62.000
|
$55.000
|
$55.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,130.000
|
$50.000
|
$45.000
|
$60.000
|
$72.000
|
$75.000
|
$75.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
248.000
|
$75.000
|
$55.000
|
$90.000
|
$94.000
|
$90.000
|
$85.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
236.000
|
$95.000
|
$150.000
|
$112.000
|
$113.000
|
$125.000
|
$125.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
24.000
|
$130.000
|
$166.000
|
$180.000
|
$144.000
|
$150.000
|
$185.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
202.000
|
$170.000
|
$185.000
|
$185.000
|
$160.000
|
$175.000
|
$210.000
|
|
|
RC PIPE (CL III)(54 IN)
|
LF
|
80.000
|
$200.000
|
$230.000
|
$225.000
|
$203.000
|
$200.000
|
$250.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
1.000
|
$3,200.000
|
$3,500.000
|
$5,000.000
|
$5,145.000
|
$5,000.000
|
$5,000.000
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
2.000
|
$5,000.000
|
$5,000.000
|
$8,000.000
|
$7,778.000
|
$7,000.000
|
$5,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$5,500.000
|
$3,000.000
|
$5,700.000
|
$18,123.000
|
$5,500.000
|
$5,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$8,000.000
|
$3,500.000
|
$8,500.000
|
$18,481.000
|
$9,000.000
|
$7,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
4.000
|
$10,500.000
|
$5,500.000
|
$10,750.000
|
$18,916.000
|
$11,000.000
|
$9,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 54 IN)
|
EA
|
4.000
|
$11,800.000
|
$7,500.000
|
$8,200.000
|
$18,255.000
|
$12,000.000
|
$12,500.000
|
|
|
WINGWALL (PW - 2) (HW=11 FT)
|
EA
|
1.000
|
$25,000.000
|
$30,000.000
|
$24,000.000
|
$24,797.000
|
$30,000.000
|
$48,500.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
4.000
|
$9,000.000
|
$6,500.000
|
$8,000.000
|
$23,126.000
|
$7,000.000
|
$1,400.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
4.000
|
$13,500.000
|
$7,000.000
|
$13,000.000
|
$24,630.000
|
$14,000.000
|
$15,000.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
3.000
|
$15,000.000
|
$8,000.000
|
$11,500.000
|
$24,965.000
|
$16,000.000
|
$16,000.000
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
2.000
|
$20,000.000
|
$9,500.000
|
$18,000.000
|
$27,484.000
|
$23,000.000
|
$23,500.000
|
|
|
SET (REPLACE PIPE RUNNER)
|
EA
|
12.000
|
$500.000
|
$4,000.000
|
$2,000.000
|
$604.000
|
$1,500.000
|
$500.000
|
|
|
SET (TY II) (15 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$400.000
|
$350.000
|
$530.000
|
$1,059.000
|
$550.000
|
$500.000
|
|
|
SET (TY II) (15 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$550.000
|
$400.000
|
$550.000
|
$1,115.000
|
$600.000
|
$550.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$800.000
|
$375.000
|
$515.000
|
$1,087.000
|
$600.000
|
$850.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
29.000
|
$750.000
|
$400.000
|
$550.000
|
$1,086.000
|
$600.000
|
$850.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
512.000
|
$750.000
|
$525.000
|
$640.000
|
$1,009.000
|
$600.000
|
$550.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$950.000
|
$500.000
|
$615.000
|
$1,019.000
|
$600.000
|
$850.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
36.000
|
$1,000.000
|
$650.000
|
$750.000
|
$1,181.000
|
$900.000
|
$950.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
34.000
|
$1,100.000
|
$800.000
|
$950.000
|
$1,392.000
|
$1,000.000
|
$1,250.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
25.000
|
$1,700.000
|
$1,175.000
|
$1,100.000
|
$1,546.000
|
$1,600.000
|
$1,850.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,900.000
|
$1,900.000
|
$1,450.000
|
$1,839.000
|
$1,800.000
|
$2,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
17.000
|
$2,400.000
|
$2,625.000
|
$2,400.000
|
$2,486.000
|
$4,500.000
|
$3,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,600.000
|
$4,000.000
|
$4,800.000
|
$3,492.000
|
$6,000.000
|
$3,500.000
|
|
|
SET (TY II) (42 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$3,600.000
|
$4,400.000
|
$3,700.000
|
$3,145.000
|
$6,500.000
|
$4,000.000
|
|
|
SET (TY II) (48 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$4,500.000
|
$3,500.000
|
$3,800.000
|
$3,465.000
|
$6,500.000
|
$5,000.000
|
|
|
SET (TY II) (48 IN) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$4,800.000
|
$4,900.000
|
$4,400.000
|
$3,938.000
|
$7,000.000
|
$5,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
12.000
|
$1,800.000
|
$1,500.000
|
$3,000.000
|
$945.000
|
$2,500.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
190.000
|
$18.000
|
$20.000
|
$45.000
|
$21.000
|
$25.000
|
$30.000
|
|
|
REMOV STR (PIPE)
|
EA
|
275.000
|
$400.000
|
$250.000
|
$550.000
|
$143.000
|
$500.000
|
$250.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
1,455.000
|
$20.000
|
$10.000
|
$10.000
|
$17.000
|
$12.000
|
$30.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$306,511.000
|
$240,000.000
|
$285,000.000
|
$134,492.000
|
$350,000.000
|
$400,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
28.000
|
$4,000.000
|
$5,000.000
|
$2,750.000
|
$1,560.000
|
$10,000.000
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,095.000
|
$30.000
|
$25.000
|
$40.000
|
$59.000
|
$35.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,095.000
|
$8.000
|
$10.000
|
$11.000
|
$42.000
|
$8.000
|
$15.000
|
|
|
EXCAV (EROSN & SEDMT CONT, IN VEH)
|
CY
|
1,000.000
|
$25.000
|
$15.000
|
$15.000
|
$4.600
|
$25.000
|
$20.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
250.000
|
$115.000
|
$50.000
|
$180.000
|
$123.000
|
$75.000
|
$150.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,647.000
|
$2.750
|
$3.000
|
$5.500
|
$3.600
|
$3.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,647.000
|
$0.750
|
$1.000
|
$1.950
|
$1.400
|
$0.750
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
2,720.000
|
$5.000
|
$5.000
|
$16.750
|
$4.700
|
$5.500
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,720.000
|
$0.500
|
$1.000
|
$4.800
|
$2.700
|
$1.000
|
$8.000
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
150.000
|
$230.000
|
$100.000
|
$210.000
|
$176.000
|
$100.000
|
$150.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
625.000
|
$20.000
|
$17.000
|
$22.000
|
$20.500
|
$20.000
|
$25.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
50.000
|
$40.000
|
$72.000
|
$95.000
|
$62.500
|
$60.000
|
$45.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,600.000
|
$1,600.000
|
$1,800.000
|
$1,704.000
|
$1,800.000
|
$1,850.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
678.000
|
$2.500
|
$5.000
|
$5.500
|
$2.300
|
$2.200
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$210.000
|
$400.000
|
$135.000
|
$140.400
|
$165.000
|
$1,500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$2,200.000
|
$2,250.000
|
$2,300.000
|
$1,307.000
|
$1,300.000
|
$2,850.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$300.000
|
$250.000
|
$170.400
|
$175.000
|
$1,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
12.000
|
$28.000
|
$22.000
|
$30.000
|
$17.000
|
$20.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
144.000
|
$65.000
|
$55.000
|
$71.000
|
$51.000
|
$50.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
30.000
|
$50.000
|
$37.000
|
$46.500
|
$28.000
|
$30.000
|
$100.000
|
|
Totals: |
$3,358,902.950
|
$3,239,526.940
|
$3,523,595.800
|
$3,844,122.560
|
$4,086,804.750
|
$4,367,340.250
|