PREPARING ROW
|
STA
|
118.000
|
$10,000.000
|
$2,100.000
|
$15,000.000
|
$10,000.000
|
$33,296.970
|
$30,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
258.000
|
$35.000
|
$15.000
|
$52.000
|
$25.000
|
$10.000
|
$30.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
607.000
|
$10.000
|
$16.000
|
$11.750
|
$10.000
|
$6.000
|
$15.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(4"-16")
|
SY
|
9,932.000
|
$14.000
|
$5.000
|
$13.250
|
$15.000
|
$12.000
|
$25.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
55,198.000
|
$20.000
|
$11.000
|
$11.550
|
$10.000
|
$12.000
|
$12.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
170,282.000
|
$22.000
|
$15.750
|
$37.000
|
$22.000
|
$11.000
|
$33.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
156,253.000
|
$1.200
|
$1.850
|
$2.600
|
$1.750
|
$1.200
|
$2.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
180,274.000
|
$0.650
|
$0.680
|
$0.690
|
$1.000
|
$0.600
|
$0.620
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
90,137.000
|
$0.650
|
$0.660
|
$0.600
|
$0.450
|
$0.600
|
$0.570
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
90,137.000
|
$0.650
|
$0.640
|
$0.590
|
$0.450
|
$0.600
|
$0.550
|
|
|
VEGETATIVE WATERING
|
MG
|
26.000
|
$12.000
|
$60.000
|
$40.000
|
$1,000.000
|
$285.000
|
$50.000
|
|
|
LIME (QUICKLIME (DRY))
|
TON
|
1,379.000
|
$375.000
|
$350.000
|
$405.000
|
$318.000
|
$356.000
|
$400.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
76,615.000
|
$7.500
|
$4.500
|
$3.300
|
$7.000
|
$4.800
|
$5.500
|
|
|
CEMENT
|
TON
|
1,379.000
|
$375.000
|
$345.000
|
$335.000
|
$250.000
|
$270.000
|
$330.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
76,615.000
|
$4.500
|
$4.000
|
$3.000
|
$5.260
|
$2.900
|
$4.000
|
|
|
EMULS ASPH (EROSN CONT)(SS-1)
|
GAL
|
2,129.000
|
$5.000
|
$6.250
|
$5.000
|
$4.260
|
$9.000
|
$6.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
42,304.000
|
$5.250
|
$5.500
|
$4.500
|
$4.600
|
$7.000
|
$5.000
|
|
|
AGGR(TY-PD GR-4 OR TY-PL GR-4)
|
CY
|
1,068.000
|
$168.000
|
$255.000
|
$220.000
|
$210.000
|
$800.000
|
$185.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
|
SY
|
500.000
|
$55.000
|
$105.000
|
$85.000
|
$150.000
|
$225.000
|
$80.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
2,257.000
|
$4.000
|
$6.500
|
$9.400
|
$10.000
|
$2.500
|
$8.000
|
|
|
PLANE ASPH CONC PAV(0" TO 4")
|
SY
|
5,388.000
|
$10.000
|
$5.350
|
$7.900
|
$11.000
|
$2.500
|
$9.000
|
|
|
CEM STABIL BKFL
|
CY
|
165.000
|
$330.000
|
$330.000
|
$275.000
|
$350.000
|
$310.000
|
$250.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
720.000
|
$200.000
|
$90.000
|
$195.000
|
$250.000
|
$130.000
|
$175.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
1,237.000
|
$320.000
|
$245.000
|
$295.000
|
$250.000
|
$250.000
|
$400.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
343.000
|
$8.000
|
$8.000
|
$12.000
|
$10.000
|
$52.000
|
$15.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,737.000
|
$45.000
|
$55.000
|
$75.000
|
$35.000
|
$35.000
|
$60.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,536.000
|
$360.000
|
$375.000
|
$375.000
|
$242.000
|
$250.000
|
$475.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
64.000
|
$205.000
|
$215.000
|
$216.000
|
$180.000
|
$185.000
|
$220.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
144.000
|
$275.000
|
$240.000
|
$240.000
|
$200.000
|
$210.000
|
$250.000
|
|
|
CL C CONC (ABUT)
|
CY
|
81.000
|
$1,500.000
|
$1,235.000
|
$1,300.000
|
$1,276.000
|
$900.000
|
$1,400.000
|
|
|
CL C CONC (CAP)
|
CY
|
146.600
|
$1,900.000
|
$1,500.000
|
$1,150.000
|
$1,400.000
|
$1,570.000
|
$1,400.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
131.900
|
$1,500.000
|
$1,600.000
|
$1,200.000
|
$1,100.000
|
$1,300.000
|
$1,400.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
466.000
|
$800.000
|
$700.000
|
$770.000
|
$1,000.000
|
$445.000
|
$900.000
|
|
|
REINF CONC SLAB
|
SF
|
41,600.000
|
$35.000
|
$29.000
|
$30.000
|
$26.500
|
$20.000
|
$30.000
|
|
|
APPROACH SLAB
|
CY
|
190.600
|
$1,100.000
|
$660.000
|
$900.000
|
$700.000
|
$690.000
|
$1,000.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
57,976.000
|
$80.000
|
$106.000
|
$70.000
|
$122.000
|
$122.000
|
$80.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
4,379.000
|
$240.000
|
$215.000
|
$225.000
|
$250.000
|
$201.000
|
$220.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1,449.000
|
$450.000
|
$545.000
|
$650.000
|
$700.000
|
$480.000
|
$650.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
47.000
|
$740.000
|
$1,025.000
|
$700.000
|
$700.000
|
$650.000
|
$900.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
60.000
|
$250.000
|
$210.000
|
$250.000
|
$250.000
|
$320.000
|
$250.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
29.000
|
$760.000
|
$675.000
|
$735.000
|
$500.000
|
$610.000
|
$700.000
|
|
|
RAIL (TY T551)
|
LF
|
10,506.000
|
$115.000
|
$110.000
|
$85.000
|
$64.000
|
$95.000
|
$125.000
|
|
|
RAIL (TY T80SS)
|
LF
|
1,566.000
|
$127.850
|
$145.000
|
$140.000
|
$125.000
|
$285.000
|
$280.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
246.000
|
$220.000
|
$200.000
|
$220.000
|
$180.000
|
$220.000
|
$250.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
786.000
|
$1,700.000
|
$575.000
|
$850.000
|
$850.000
|
$800.000
|
$900.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,714.000
|
$75.000
|
$65.000
|
$70.000
|
$50.000
|
$85.000
|
$65.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
287.000
|
$95.000
|
$90.000
|
$90.000
|
$71.000
|
$110.000
|
$85.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
153.000
|
$202.000
|
$160.000
|
$190.000
|
$144.000
|
$160.000
|
$160.000
|
|
|
RC PIPE (CL V)(18 IN)
|
LF
|
569.000
|
$110.000
|
$132.000
|
$130.000
|
$126.000
|
$110.000
|
$130.000
|
|
|
RC PIPE (CL V)(48 IN)
|
LF
|
151.000
|
$600.000
|
$550.000
|
$560.000
|
$490.000
|
$500.000
|
$550.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
8.000
|
$6,570.000
|
$4,700.000
|
$7,200.000
|
$4,450.000
|
$7,000.000
|
$9,000.000
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
1.000
|
$18,000.000
|
$20,000.000
|
$21,500.000
|
$17,000.000
|
$13,000.000
|
$20,000.000
|
|
|
INLET (COMPL)(PSL)(RC)(3FTX3FT)
|
EA
|
1.000
|
$10,000.000
|
$6,700.000
|
$7,500.000
|
$5,000.000
|
$4,900.000
|
$10,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
2.000
|
$8,000.000
|
$8,500.000
|
$8,000.000
|
$7,000.000
|
$5,500.000
|
$12,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
7.000
|
$10,000.000
|
$8,300.000
|
$11,500.000
|
$9,000.000
|
$5,300.000
|
$17,000.000
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$8,500.000
|
$8,700.000
|
$9,500.000
|
$7,300.000
|
$5,800.000
|
$11,000.000
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
|
EA
|
5.000
|
$8,000.000
|
$7,800.000
|
$11,000.000
|
$8,000.000
|
$6,000.000
|
$12,000.000
|
|
|
INLET (COMPL)(TY MSE2)
|
EA
|
8.000
|
$15,000.000
|
$9,100.000
|
$11,000.000
|
$15,000.000
|
$5,600.000
|
$20,000.000
|
|
|
INLET(COMPL)(CURB)(SPL)
|
EA
|
4.000
|
$8,300.000
|
$9,000.000
|
$11,000.000
|
$10,000.000
|
$6,000.000
|
$10,000.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 48 IN)
|
EA
|
1.000
|
$10,500.000
|
$13,500.000
|
$17,000.000
|
$7,500.000
|
$23,000.000
|
$15,000.000
|
|
|
WINGWALL (FW - S) (HW=8 FT)
|
EA
|
1.000
|
$35,000.000
|
$30,435.000
|
$40,000.000
|
$20,000.000
|
$26,000.000
|
$40,000.000
|
|
|
WINGWALL (FW - S) (HW=9 FT)
|
EA
|
1.000
|
$42,000.000
|
$29,435.000
|
$50,000.000
|
$27,000.000
|
$34,000.000
|
$45,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$900.000
|
$935.000
|
$1,000.000
|
$800.000
|
$2,000.000
|
$800.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
5.000
|
$900.000
|
$965.000
|
$1,200.000
|
$904.000
|
$2,300.000
|
$800.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
78.000
|
$1,100.000
|
$975.000
|
$1,100.000
|
$950.000
|
$2,300.000
|
$800.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,400.000
|
$1,645.000
|
$1,500.000
|
$1,100.000
|
$2,500.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$1,400.000
|
$1,485.000
|
$1,700.000
|
$1,350.000
|
$2,500.000
|
$1,300.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$3,700.000
|
$4,495.000
|
$4,500.000
|
$5,000.000
|
$4,200.000
|
$5,000.000
|
|
|
GRATE AND FRAME (BRIDGE DRAIN)
|
EA
|
2.000
|
$6,000.000
|
$4,480.000
|
$4,500.000
|
$5,000.000
|
$2,500.000
|
$3,500.000
|
|
|
PIPE (PVC) (SCH 40) (6 IN)
|
LF
|
126.000
|
$75.000
|
$56.000
|
$140.000
|
$25.000
|
$125.000
|
$100.000
|
|
|
REMOV STR (PIPE)
|
EA
|
36.000
|
$1,400.000
|
$355.000
|
$500.000
|
$100.000
|
$1,400.000
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$5,015,300.000
|
$3,000,000.000
|
$4,000,000.000
|
$4,500,000.000
|
$4,750,000.000
|
$4,800,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
28.000
|
$12,000.000
|
$6,500.000
|
$10,000.000
|
$1,900.000
|
$12,000.000
|
$20,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
3,396.000
|
$40.000
|
$42.000
|
$39.000
|
$50.000
|
$36.000
|
$40.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
120.000
|
$55.000
|
$58.000
|
$54.000
|
$55.000
|
$50.000
|
$60.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
3,516.000
|
$14.000
|
$8.000
|
$8.000
|
$10.000
|
$7.000
|
$7.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$30.000
|
$43.000
|
$39.000
|
$35.000
|
$29.000
|
$35.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$10.000
|
$9.000
|
$14.000
|
$7.000
|
$11.000
|
$5.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
3,000.000
|
$20.000
|
$12.000
|
$25.000
|
$38.000
|
$13.000
|
$20.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
150.000
|
$125.000
|
$200.000
|
$135.000
|
$55.000
|
$250.000
|
$125.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
11,925.000
|
$3.500
|
$4.000
|
$4.500
|
$4.000
|
$4.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
11,925.000
|
$0.600
|
$0.300
|
$1.000
|
$1.000
|
$0.300
|
$0.300
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,343.000
|
$6.500
|
$7.000
|
$6.600
|
$6.750
|
$6.000
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,343.000
|
$1.000
|
$1.200
|
$1.250
|
$1.500
|
$1.000
|
$1.000
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
50.000
|
$140.000
|
$225.000
|
$160.000
|
$65.000
|
$290.000
|
$200.000
|
|
|
CONSTRUCTING DETOURS (TY 1)
|
SY
|
5,099.000
|
$130.000
|
$110.000
|
$110.000
|
$82.000
|
$160.000
|
$150.000
|
|
|
CONSTRUCTING DETOURS (TY 2)
|
SY
|
4,474.000
|
$80.000
|
$68.000
|
$70.000
|
$102.000
|
$120.000
|
$150.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
240.000
|
$30.000
|
$35.000
|
$35.000
|
$40.000
|
$25.000
|
$40.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
40.000
|
$12.000
|
$60.000
|
$40.000
|
$50.000
|
$25.000
|
$40.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$12.000
|
$60.000
|
$40.000
|
$25.000
|
$25.000
|
$40.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
120.000
|
$20.000
|
$29.000
|
$20.000
|
$25.000
|
$14.000
|
$20.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
240.000
|
$20.000
|
$31.000
|
$35.000
|
$25.000
|
$22.000
|
$40.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
40.000
|
$10.000
|
$60.000
|
$40.000
|
$25.000
|
$22.000
|
$40.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$15.000
|
$60.000
|
$40.000
|
$10.000
|
$22.000
|
$40.000
|
|
|
PERM CTB (SSCB)(TY 1)(MOD)
|
LF
|
2,450.000
|
$150.000
|
$145.000
|
$96.000
|
$105.000
|
$245.000
|
$145.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
6,126.000
|
$50.000
|
$40.000
|
$39.000
|
$36.000
|
$28.000
|
$40.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
3,906.000
|
$55.000
|
$55.000
|
$66.000
|
$60.000
|
$160.000
|
$75.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
687.000
|
$175.000
|
$105.000
|
$170.000
|
$135.000
|
$130.000
|
$150.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
413.000
|
$30.000
|
$32.000
|
$30.000
|
$28.000
|
$29.000
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$2,000.000
|
$2,400.000
|
$2,200.000
|
$2,200.000
|
$2,300.000
|
$2,600.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,500.000
|
$1,500.000
|
$1,400.000
|
$1,150.000
|
$1,250.000
|
$1,400.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
830.000
|
$3.000
|
$2.400
|
$2.200
|
$10.000
|
$3.000
|
$2.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,000.000
|
$3,360.000
|
$3,100.000
|
$2,875.000
|
$2,900.000
|
$3,200.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$240.000
|
$220.000
|
$375.000
|
$500.000
|
$250.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,400.000
|
$4,800.000
|
$4,400.000
|
$2,000.000
|
$1,100.000
|
$4,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,000.000
|
$1,200.000
|
$1,100.000
|
$1,000.000
|
$1,800.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
5.000
|
$28,000.000
|
$29,100.000
|
$26,700.000
|
$24,500.000
|
$25,000.000
|
$27,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
10.000
|
$325.000
|
$365.000
|
$345.000
|
$310.000
|
$310.000
|
$310.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
1.000
|
$400.000
|
$410.000
|
$420.000
|
$350.000
|
$360.000
|
$350.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
6.000
|
$1,800.000
|
$1,800.000
|
$1,650.000
|
$1,600.000
|
$1,600.000
|
$1,600.000
|
|
|
IN RD IL (U/P) (TY 2) (150W EQ) LED
|
EA
|
2.000
|
$1,300.000
|
$1,800.000
|
$1,650.000
|
$1,600.000
|
$1,600.000
|
$1,600.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
18.000
|
$5,500.000
|
$6,600.000
|
$6,050.000
|
$5,800.000
|
$6,000.000
|
$6,000.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
3,269.000
|
$12.000
|
$11.000
|
$10.000
|
$10.000
|
$10.000
|
$10.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
842.000
|
$30.000
|
$35.000
|
$32.000
|
$30.000
|
$31.000
|
$32.000
|
|
|
CONDT (RM) (3/4")
|
LF
|
320.000
|
$25.000
|
$35.000
|
$32.000
|
$30.000
|
$31.000
|
$32.000
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
360.000
|
$1.500
|
$2.150
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
720.000
|
$1.600
|
$2.150
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
4,278.000
|
$2.000
|
$3.000
|
$2.750
|
$2.750
|
$3.000
|
$2.700
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
8,966.000
|
$2.000
|
$3.600
|
$3.300
|
$3.250
|
$3.500
|
$3.300
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
12.000
|
$1,150.000
|
$1,100.000
|
$1,000.000
|
$900.000
|
$900.000
|
$900.000
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
|
EA
|
3.000
|
$6,600.000
|
$9,000.000
|
$8,200.000
|
$7,500.000
|
$7,900.000
|
$8,000.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
575.000
|
$29.000
|
$38.000
|
$35.000
|
$33.000
|
$35.000
|
$35.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
16.000
|
$665.000
|
$750.000
|
$635.000
|
$630.000
|
$600.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
24.000
|
$800.000
|
$850.000
|
$1,015.000
|
$725.000
|
$790.000
|
$750.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$920.000
|
$1,085.000
|
$1,100.000
|
$910.000
|
$920.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
10.000
|
$1,100.000
|
$950.000
|
$1,450.000
|
$800.000
|
$1,050.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,100.000
|
$1,250.000
|
$1,650.000
|
$1,050.000
|
$1,200.000
|
$1,500.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
4.000
|
$2,200.000
|
$4,200.000
|
$2,500.000
|
$2,560.000
|
$2,300.000
|
$2,600.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
36.000
|
$115.000
|
$126.000
|
$120.000
|
$110.000
|
$120.000
|
$120.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
2,804.000
|
$11.500
|
$10.000
|
$10.000
|
$9.000
|
$9.000
|
$9.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
50.000
|
$30.000
|
$24.000
|
$22.000
|
$20.000
|
$21.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
17.000
|
$30.000
|
$24.000
|
$22.000
|
$20.000
|
$21.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
25.000
|
$23.000
|
$24.000
|
$22.000
|
$21.000
|
$21.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
29.000
|
$85.000
|
$54.000
|
$50.000
|
$45.000
|
$46.000
|
$55.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
9.000
|
$70.000
|
$54.000
|
$50.000
|
$45.000
|
$46.000
|
$55.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
7.000
|
$87.000
|
$54.000
|
$50.000
|
$45.000
|
$46.000
|
$55.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
59,508.000
|
$0.320
|
$0.420
|
$0.400
|
$0.350
|
$0.400
|
$0.380
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
2,302.000
|
$0.750
|
$0.600
|
$0.550
|
$0.500
|
$0.550
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
399.000
|
$5.000
|
$4.200
|
$3.900
|
$3.500
|
$3.600
|
$4.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)18"(YLD TRI)
|
EA
|
11.000
|
$24.000
|
$90.000
|
$83.000
|
$75.000
|
$77.000
|
$85.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
62,737.000
|
$0.350
|
$0.420
|
$0.400
|
$0.350
|
$0.400
|
$0.380
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
58.000
|
$4.500
|
$6.000
|
$5.500
|
$5.000
|
$5.100
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
825.000
|
$4.500
|
$6.000
|
$5.500
|
$5.000
|
$5.100
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
5,409.000
|
$1.750
|
$1.440
|
$1.350
|
$1.200
|
$1.250
|
$1.400
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
5,831.000
|
$2.500
|
$1.440
|
$1.350
|
$1.200
|
$1.250
|
$1.400
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
778.000
|
$1.100
|
$2.400
|
$2.200
|
$2.000
|
$2.050
|
$2.200
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
152.000
|
$1.100
|
$2.400
|
$2.200
|
$2.000
|
$2.050
|
$2.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
5,467.000
|
$1.100
|
$1.200
|
$1.100
|
$1.000
|
$1.050
|
$1.100
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
492.000
|
$4.300
|
$4.800
|
$4.500
|
$4.000
|
$4.100
|
$5.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
137.000
|
$8.000
|
$7.800
|
$7.200
|
$6.500
|
$6.700
|
$7.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
46.000
|
$50.000
|
$90.000
|
$85.000
|
$75.000
|
$77.000
|
$85.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
2,616.000
|
$0.650
|
$0.600
|
$0.550
|
$0.500
|
$0.600
|
$0.550
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
4,052.000
|
$0.650
|
$1.200
|
$1.100
|
$1.000
|
$1.050
|
$1.100
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
30,804.000
|
$0.600
|
$1.020
|
$1.000
|
$0.850
|
$0.900
|
$0.950
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
48.000
|
$0.600
|
$1.200
|
$1.100
|
$1.000
|
$1.050
|
$5.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
33,178.000
|
$0.600
|
$1.020
|
$1.000
|
$0.850
|
$0.900
|
$0.950
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
10.000
|
$225.000
|
$260.000
|
$240.000
|
$215.000
|
$220.000
|
$240.000
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
6.000
|
$390.000
|
$330.000
|
$305.000
|
$275.000
|
$280.000
|
$300.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
10.000
|
$260.000
|
$305.000
|
$280.000
|
$225.000
|
$260.000
|
$300.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
278.000
|
$4.000
|
$6.000
|
$5.500
|
$5.000
|
$5.100
|
$6.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
502.000
|
$4.000
|
$6.000
|
$5.500
|
$5.000
|
$5.100
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
11,355.000
|
$1.200
|
$0.780
|
$0.720
|
$0.650
|
$0.700
|
$0.750
|
|
|
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
|
LF
|
33,695.000
|
$0.800
|
$0.780
|
$0.720
|
$0.650
|
$0.700
|
$0.750
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
61,689.000
|
$0.040
|
$0.180
|
$0.200
|
$0.150
|
$0.160
|
$0.200
|
|
|
TEMP TRAF SIGNALS
|
EA
|
1.000
|
$110,000.000
|
$54,000.000
|
$50,000.000
|
$55,000.000
|
$48,000.000
|
$50,000.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
46,152.000
|
$180.000
|
$155.000
|
$143.000
|
$170.000
|
$170.000
|
$167.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
12,926.000
|
$200.000
|
$155.000
|
$153.000
|
$180.000
|
$225.000
|
$175.000
|
|
|
TACK COAT
|
GAL
|
11,751.000
|
$4.000
|
$6.000
|
$4.500
|
$4.250
|
$5.000
|
$6.000
|
|
|
SP MIXES SP-D PG64-22 (EXEMPT)
|
TON
|
13,386.000
|
$300.000
|
$155.000
|
$155.000
|
$182.000
|
$237.000
|
$170.000
|
|
|
INSTALL FTB
|
LF
|
300.000
|
$50.000
|
$65.000
|
$65.000
|
$50.000
|
$60.000
|
$65.000
|
|
|
REMOVE FTB
|
LF
|
300.000
|
$13.000
|
$8.000
|
$8.000
|
$10.000
|
$8.000
|
$10.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
40.000
|
$175.000
|
$120.000
|
$150.000
|
$150.000
|
$300.000
|
$200.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$18,000.000
|
$18,000.000
|
$22,000.000
|
$18,000.000
|
$25,000.000
|
$30,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$225.000
|
$400.000
|
$200.000
|
$1,000.000
|
$315.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
10.000
|
$250.000
|
$400.000
|
$250.000
|
$375.000
|
$345.000
|
$500.000
|
|
Totals: |
$46,810,288.720
|
$37,954,683.080
|
$41,989,582.790
|
$43,525,687.690
|
$47,327,662.750
|
$48,467,077.820
|