Show Job Controls
Bid Cobra

WOOD US 69 (0203-05-039)

Items: 175

County: WOOD
Length: N/A
Highway: US 69
District: TYLER
Control Number: 0203-05-039
DBE Goal: 0.0%
Project: C 203-5-39
Guaranty: N/A
Time: 492 WORKING DAYS
Engineer's Estimate: $46,810,288.72
Date: 03/05/2024 (2 years ago)
Contract Number: N/A
Type: INTERCHANGE IMPROVEMENT (NEW OR UP)
Mail/Deliver Bids To: N/A
LANCE POMYKAL
JOSH FULTON
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$46,810,288.72
$37,954,683.08
Over/Under Est: -18.92% -$8,855,605.64
Over/Under Est: -10.3% -$4,820,705.93
Amt Left: 10.63% $4,034,899.71
Over/Under Est: -7.02% -$3,284,601.03
Amt Left: 14.68% $5,571,004.61
Delta: -3.66% -$1,536,104.90
Over/Under Est: 1.11% $517,374.03
Amt Left: 24.7% $9,372,979.67
Delta: -8.74% -$3,801,975.06
$48,467,077.82
Over/Under Est: 3.54% $1,656,789.10
Amt Left: 27.7% $10,512,394.74
Delta: -2.41% -$1,139,415.07
Subcontractor Percentage Amount
TRUE ROADS, LLC 47.64% $18,339,952.02
JB PINNACLE GROUP, LLC 1.54% $592,853.19
J. H. ODEN CONTRACTING COMPANY 1.13% $435,015.65
M & D FOUNDATION DRILLING INDUSTRIES, INC. 0.77% $296,426.60
SNOWHILL CONTRACTING LLC 0.74% $284,877.51
STRIPING TECHNOLOGY, L.P. 0.48% $184,785.41
MORRIS COUNTY CONTRACTORS, L.L.C. 0.44% $169,386.63
TEXOP CONSTRUCTION 0.38% $146,288.45
AWP SAFETY 0.12% $46,196.35
FLEX SUPPLY, LLC 0.10% $38,496.96
TORO BRAVO CONSTRUCTION, LLC 0.03% $11,549.09
Total: 53.37% $20,545,827.86

Bid Items & Bid Tabulations

175 Total 0 of 175
WOOD  |  US 69  |  TYLER  |  0203-05-039  |  03/05/2024  |  $46,810,288.72  |  C 203-5-39  |  INTERCHANGE IMPRV (NEW OR UP)  |  492 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LAMAR COMPANIES LLC
LONGVIEW BRIDGE AND ROAD, LTD.
HIGHWAY 19 CONSTRUCTION LLC
INDUS ROAD & BRIDGE, INC.
EAST TEXAS BRIDGE, INC.
PREPARING ROW
STA 118.000 $10,000.000 $2,100.000 $15,000.000 $10,000.000 $33,296.970 $30,000.000
REMOVING CONC (RIPRAP)
SY 258.000 $35.000 $15.000 $52.000 $25.000 $10.000 $30.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 607.000 $10.000 $16.000 $11.750 $10.000 $6.000 $15.000
REMOVING STAB BASE AND ASPH PAV(4"-16")
SY 9,932.000 $14.000 $5.000 $13.250 $15.000 $12.000 $25.000
EXCAVATION (ROADWAY)
CY 55,198.000 $20.000 $11.000 $11.550 $10.000 $12.000 $12.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 170,282.000 $22.000 $15.750 $37.000 $22.000 $11.000 $33.000
FURNISHING AND PLACING TOPSOIL (4")
SY 156,253.000 $1.200 $1.850 $2.600 $1.750 $1.200 $2.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 180,274.000 $0.650 $0.680 $0.690 $1.000 $0.600 $0.620
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 90,137.000 $0.650 $0.660 $0.600 $0.450 $0.600 $0.570
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 90,137.000 $0.650 $0.640 $0.590 $0.450 $0.600 $0.550
VEGETATIVE WATERING
MG 26.000 $12.000 $60.000 $40.000 $1,000.000 $285.000 $50.000
LIME (QUICKLIME (DRY))
TON 1,379.000 $375.000 $350.000 $405.000 $318.000 $356.000 $400.000
LIME TRT (EXST MATL)(8")
SY 76,615.000 $7.500 $4.500 $3.300 $7.000 $4.800 $5.500
CEMENT
TON 1,379.000 $375.000 $345.000 $335.000 $250.000 $270.000 $330.000
CEMENT TREAT (SUBGRADE) (8")
SY 76,615.000 $4.500 $4.000 $3.000 $5.260 $2.900 $4.000
EMULS ASPH (EROSN CONT)(SS-1)
GAL 2,129.000 $5.000 $6.250 $5.000 $4.260 $9.000 $6.000
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 42,304.000 $5.250 $5.500 $4.500 $4.600 $7.000 $5.000
AGGR(TY-PD GR-4 OR TY-PL GR-4)
CY 1,068.000 $168.000 $255.000 $220.000 $210.000 $800.000 $185.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 500.000 $55.000 $105.000 $85.000 $150.000 $225.000 $80.000
PLANE ASPH CONC PAV(0" TO 2")
SY 2,257.000 $4.000 $6.500 $9.400 $10.000 $2.500 $8.000
PLANE ASPH CONC PAV(0" TO 4")
SY 5,388.000 $10.000 $5.350 $7.900 $11.000 $2.500 $9.000
CEM STABIL BKFL
CY 165.000 $330.000 $330.000 $275.000 $350.000 $310.000 $250.000
CUT & RESTORE ASPH PAVING
SY 720.000 $200.000 $90.000 $195.000 $250.000 $130.000 $175.000
FLOWABLE BACKFILL
CY 1,237.000 $320.000 $245.000 $295.000 $250.000 $250.000 $400.000
TRENCH EXCAVATION PROTECTION
LF 343.000 $8.000 $8.000 $12.000 $10.000 $52.000 $15.000
TEMPORARY SPL SHORING
SF 1,737.000 $45.000 $55.000 $75.000 $35.000 $35.000 $60.000
DRILL SHAFT (36 IN)
LF 1,536.000 $360.000 $375.000 $375.000 $242.000 $250.000 $475.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 64.000 $205.000 $215.000 $216.000 $180.000 $185.000 $220.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 144.000 $275.000 $240.000 $240.000 $200.000 $210.000 $250.000
CL C CONC (ABUT)
CY 81.000 $1,500.000 $1,235.000 $1,300.000 $1,276.000 $900.000 $1,400.000
CL C CONC (CAP)
CY 146.600 $1,900.000 $1,500.000 $1,150.000 $1,400.000 $1,570.000 $1,400.000
CL C CONC (COLUMN)
CY 131.900 $1,500.000 $1,600.000 $1,200.000 $1,100.000 $1,300.000 $1,400.000
CL C CONC (RAIL FOUNDATION)
CY 466.000 $800.000 $700.000 $770.000 $1,000.000 $445.000 $900.000
REINF CONC SLAB
SF 41,600.000 $35.000 $29.000 $30.000 $26.500 $20.000 $30.000
APPROACH SLAB
CY 190.600 $1,100.000 $660.000 $900.000 $700.000 $690.000 $1,000.000
RETAINING WALL (MSE)
SF 57,976.000 $80.000 $106.000 $70.000 $122.000 $122.000 $80.000
PRESTR CONC GIRDER (TX54)
LF 4,379.000 $240.000 $215.000 $225.000 $250.000 $201.000 $220.000
RIPRAP (CONC)(4 IN)
CY 1,449.000 $450.000 $545.000 $650.000 $700.000 $480.000 $650.000
RIPRAP (CONC)(5 IN)
CY 47.000 $740.000 $1,025.000 $700.000 $700.000 $650.000 $900.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 60.000 $250.000 $210.000 $250.000 $250.000 $320.000 $250.000
RIPRAP (MOW STRIP)(4 IN)
CY 29.000 $760.000 $675.000 $735.000 $500.000 $610.000 $700.000
RAIL (TY T551)
LF 10,506.000 $115.000 $110.000 $85.000 $64.000 $95.000 $125.000
RAIL (TY T80SS)
LF 1,566.000 $127.850 $145.000 $140.000 $125.000 $285.000 $280.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 246.000 $220.000 $200.000 $220.000 $180.000 $220.000 $250.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 786.000 $1,700.000 $575.000 $850.000 $850.000 $800.000 $900.000
RC PIPE (CL III)(18 IN)
LF 1,714.000 $75.000 $65.000 $70.000 $50.000 $85.000 $65.000
RC PIPE (CL III)(24 IN)
LF 287.000 $95.000 $90.000 $90.000 $71.000 $110.000 $85.000
RC PIPE (CL III)(36 IN)
LF 153.000 $202.000 $160.000 $190.000 $144.000 $160.000 $160.000
RC PIPE (CL V)(18 IN)
LF 569.000 $110.000 $132.000 $130.000 $126.000 $110.000 $130.000
RC PIPE (CL V)(48 IN)
LF 151.000 $600.000 $550.000 $560.000 $490.000 $500.000 $550.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 8.000 $6,570.000 $4,700.000 $7,200.000 $4,450.000 $7,000.000 $9,000.000
JCTBOX(COMPL)(PJB)(6FTX6FT)
EA 1.000 $18,000.000 $20,000.000 $21,500.000 $17,000.000 $13,000.000 $20,000.000
INLET (COMPL)(PSL)(RC)(3FTX3FT)
EA 1.000 $10,000.000 $6,700.000 $7,500.000 $5,000.000 $4,900.000 $10,000.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $8,000.000 $8,500.000 $8,000.000 $7,000.000 $5,500.000 $12,000.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 7.000 $10,000.000 $8,300.000 $11,500.000 $9,000.000 $5,300.000 $17,000.000
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
EA 1.000 $8,500.000 $8,700.000 $9,500.000 $7,300.000 $5,800.000 $11,000.000
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
EA 5.000 $8,000.000 $7,800.000 $11,000.000 $8,000.000 $6,000.000 $12,000.000
INLET (COMPL)(TY MSE2)
EA 8.000 $15,000.000 $9,100.000 $11,000.000 $15,000.000 $5,600.000 $20,000.000
INLET(COMPL)(CURB)(SPL)
EA 4.000 $8,300.000 $9,000.000 $11,000.000 $10,000.000 $6,000.000 $10,000.000
HEADWALL (CH - FW - 0) (DIA= 48 IN)
EA 1.000 $10,500.000 $13,500.000 $17,000.000 $7,500.000 $23,000.000 $15,000.000
WINGWALL (FW - S) (HW=8 FT)
EA 1.000 $35,000.000 $30,435.000 $40,000.000 $20,000.000 $26,000.000 $40,000.000
WINGWALL (FW - S) (HW=9 FT)
EA 1.000 $42,000.000 $29,435.000 $50,000.000 $27,000.000 $34,000.000 $45,000.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 8.000 $900.000 $935.000 $1,000.000 $800.000 $2,000.000 $800.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 5.000 $900.000 $965.000 $1,200.000 $904.000 $2,300.000 $800.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 78.000 $1,100.000 $975.000 $1,100.000 $950.000 $2,300.000 $800.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $1,400.000 $1,645.000 $1,500.000 $1,100.000 $2,500.000 $1,200.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 2.000 $1,400.000 $1,485.000 $1,700.000 $1,350.000 $2,500.000 $1,300.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 1.000 $3,700.000 $4,495.000 $4,500.000 $5,000.000 $4,200.000 $5,000.000
GRATE AND FRAME (BRIDGE DRAIN)
EA 2.000 $6,000.000 $4,480.000 $4,500.000 $5,000.000 $2,500.000 $3,500.000
PIPE (PVC) (SCH 40) (6 IN)
LF 126.000 $75.000 $56.000 $140.000 $25.000 $125.000 $100.000
REMOV STR (PIPE)
EA 36.000 $1,400.000 $355.000 $500.000 $100.000 $1,400.000 $1,000.000
MOBILIZATION
LS 1.000 $5,015,300.000 $3,000,000.000 $4,000,000.000 $4,500,000.000 $4,750,000.000 $4,800,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 28.000 $12,000.000 $6,500.000 $10,000.000 $1,900.000 $12,000.000 $20,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 3,396.000 $40.000 $42.000 $39.000 $50.000 $36.000 $40.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 120.000 $55.000 $58.000 $54.000 $55.000 $50.000 $60.000
ROCK FILTER DAMS (REMOVE)
LF 3,516.000 $14.000 $8.000 $8.000 $10.000 $7.000 $7.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $30.000 $43.000 $39.000 $35.000 $29.000 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $10.000 $9.000 $14.000 $7.000 $11.000 $5.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 3,000.000 $20.000 $12.000 $25.000 $38.000 $13.000 $20.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 150.000 $125.000 $200.000 $135.000 $55.000 $250.000 $125.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 11,925.000 $3.500 $4.000 $4.500 $4.000 $4.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 11,925.000 $0.600 $0.300 $1.000 $1.000 $0.300 $0.300
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,343.000 $6.500 $7.000 $6.600 $6.750 $6.000 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,343.000 $1.000 $1.200 $1.250 $1.500 $1.000 $1.000
TRACKHOE WORK (EROSION & SEDMT CONT)
HR 50.000 $140.000 $225.000 $160.000 $65.000 $290.000 $200.000
CONSTRUCTING DETOURS (TY 1)
SY 5,099.000 $130.000 $110.000 $110.000 $82.000 $160.000 $150.000
CONSTRUCTING DETOURS (TY 2)
SY 4,474.000 $80.000 $68.000 $70.000 $102.000 $120.000 $150.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 240.000 $30.000 $35.000 $35.000 $40.000 $25.000 $40.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 40.000 $12.000 $60.000 $40.000 $50.000 $25.000 $40.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 40.000 $12.000 $60.000 $40.000 $25.000 $25.000 $40.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 120.000 $20.000 $29.000 $20.000 $25.000 $14.000 $20.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 240.000 $20.000 $31.000 $35.000 $25.000 $22.000 $40.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 40.000 $10.000 $60.000 $40.000 $25.000 $22.000 $40.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $15.000 $60.000 $40.000 $10.000 $22.000 $40.000
PERM CTB (SSCB)(TY 1)(MOD)
LF 2,450.000 $150.000 $145.000 $96.000 $105.000 $245.000 $145.000
CONC CURB & GUTTER (TY II)
LF 6,126.000 $50.000 $40.000 $39.000 $36.000 $28.000 $40.000
DRIVEWAYS (ACP)
SY 3,906.000 $55.000 $55.000 $66.000 $60.000 $160.000 $75.000
DRIVEWAYS (CONC) (HES)
SY 687.000 $175.000 $105.000 $170.000 $135.000 $130.000 $150.000
MTL W-BEAM GD FEN (STEEL POST)
LF 413.000 $30.000 $32.000 $30.000 $28.000 $29.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $2,000.000 $2,400.000 $2,200.000 $2,200.000 $2,300.000 $2,600.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,500.000 $1,500.000 $1,400.000 $1,150.000 $1,250.000 $1,400.000
REMOVE METAL BEAM GUARD FENCE
LF 830.000 $3.000 $2.400 $2.200 $10.000 $3.000 $2.500
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $3,360.000 $3,100.000 $2,875.000 $2,900.000 $3,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $240.000 $220.000 $375.000 $500.000 $250.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,400.000 $4,800.000 $4,400.000 $2,000.000 $1,100.000 $4,500.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,000.000 $1,200.000 $1,100.000 $1,000.000 $1,800.000 $1,500.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 5.000 $28,000.000 $29,100.000 $26,700.000 $24,500.000 $25,000.000 $27,000.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 10.000 $325.000 $365.000 $345.000 $310.000 $310.000 $310.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 1.000 $400.000 $410.000 $420.000 $350.000 $360.000 $350.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 6.000 $1,800.000 $1,800.000 $1,650.000 $1,600.000 $1,600.000 $1,600.000
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 2.000 $1,300.000 $1,800.000 $1,650.000 $1,600.000 $1,600.000 $1,600.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 18.000 $5,500.000 $6,600.000 $6,050.000 $5,800.000 $6,000.000 $6,000.000
CONDT (PVC) (SCH 80) (2")
LF 3,269.000 $12.000 $11.000 $10.000 $10.000 $10.000 $10.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 842.000 $30.000 $35.000 $32.000 $30.000 $31.000 $32.000
CONDT (RM) (3/4")
LF 320.000 $25.000 $35.000 $32.000 $30.000 $31.000 $32.000
ELEC CONDR (NO.12) BARE
LF 360.000 $1.500 $2.150 $2.000 $2.000 $2.000 $2.000
ELEC CONDR (NO.12) INSULATED
LF 720.000 $1.600 $2.150 $2.000 $2.000 $2.000 $2.000
ELEC CONDR (NO.8) BARE
LF 4,278.000 $2.000 $3.000 $2.750 $2.750 $3.000 $2.700
ELEC CONDR (NO.8) INSULATED
LF 8,966.000 $2.000 $3.600 $3.300 $3.250 $3.500 $3.300
GROUND BOX TY A (122311)W/APRON
EA 12.000 $1,150.000 $1,100.000 $1,000.000 $900.000 $900.000 $900.000
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
EA 3.000 $6,600.000 $9,000.000 $8,200.000 $7,500.000 $7,900.000 $8,000.000
ALUMINUM SIGNS (TY G)
SF 575.000 $29.000 $38.000 $35.000 $33.000 $35.000 $35.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 16.000 $665.000 $750.000 $635.000 $630.000 $600.000 $700.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 24.000 $800.000 $850.000 $1,015.000 $725.000 $790.000 $750.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $920.000 $1,085.000 $1,100.000 $910.000 $920.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 10.000 $1,100.000 $950.000 $1,450.000 $800.000 $1,050.000 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,100.000 $1,250.000 $1,650.000 $1,050.000 $1,200.000 $1,500.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 4.000 $2,200.000 $4,200.000 $2,500.000 $2,560.000 $2,300.000 $2,600.000
REMOVE SM RD SN SUP&AM
EA 36.000 $115.000 $126.000 $120.000 $110.000 $120.000 $120.000
INSTALL LRSS (STRUCT STEEL)
LB 2,804.000 $11.500 $10.000 $10.000 $9.000 $9.000 $9.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 50.000 $30.000 $24.000 $22.000 $20.000 $21.000 $30.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 17.000 $30.000 $24.000 $22.000 $20.000 $21.000 $30.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 25.000 $23.000 $24.000 $22.000 $21.000 $21.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 29.000 $85.000 $54.000 $50.000 $45.000 $46.000 $55.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 9.000 $70.000 $54.000 $50.000 $45.000 $46.000 $55.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 7.000 $87.000 $54.000 $50.000 $45.000 $46.000 $55.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 59,508.000 $0.320 $0.420 $0.400 $0.350 $0.400 $0.380
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,302.000 $0.750 $0.600 $0.550 $0.500 $0.550 $0.550
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 399.000 $5.000 $4.200 $3.900 $3.500 $3.600 $4.000
WK ZN PAV MRK NON-REMOV(W)18"(YLD TRI)
EA 11.000 $24.000 $90.000 $83.000 $75.000 $77.000 $85.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 62,737.000 $0.350 $0.420 $0.400 $0.350 $0.400 $0.380
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 58.000 $4.500 $6.000 $5.500 $5.000 $5.100 $6.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 825.000 $4.500 $6.000 $5.500 $5.000 $5.100 $6.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 5,409.000 $1.750 $1.440 $1.350 $1.200 $1.250 $1.400
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 5,831.000 $2.500 $1.440 $1.350 $1.200 $1.250 $1.400
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 778.000 $1.100 $2.400 $2.200 $2.000 $2.050 $2.200
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 152.000 $1.100 $2.400 $2.200 $2.000 $2.050 $2.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,467.000 $1.100 $1.200 $1.100 $1.000 $1.050 $1.100
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 492.000 $4.300 $4.800 $4.500 $4.000 $4.100 $5.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 137.000 $8.000 $7.800 $7.200 $6.500 $6.700 $7.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 46.000 $50.000 $90.000 $85.000 $75.000 $77.000 $85.000
PAVEMENT SEALER 6"
LF 2,616.000 $0.650 $0.600 $0.550 $0.500 $0.600 $0.550
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 4,052.000 $0.650 $1.200 $1.100 $1.000 $1.050 $1.100
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 30,804.000 $0.600 $1.020 $1.000 $0.850 $0.900 $0.950
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 48.000 $0.600 $1.200 $1.100 $1.000 $1.050 $5.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 33,178.000 $0.600 $1.020 $1.000 $0.850 $0.900 $0.950
PREFAB PAV MRK TY C (W) (ARROW)
EA 10.000 $225.000 $260.000 $240.000 $215.000 $220.000 $240.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 6.000 $390.000 $330.000 $305.000 $275.000 $280.000 $300.000
PREFAB PAV MRK TY C (W) (WORD)
EA 10.000 $260.000 $305.000 $280.000 $225.000 $260.000 $300.000
REFL PAV MRKR TY II-A-A
EA 278.000 $4.000 $6.000 $5.500 $5.000 $5.100 $6.000
REFL PAV MRKR TY II-C-R
EA 502.000 $4.000 $6.000 $5.500 $5.000 $5.100 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 11,355.000 $1.200 $0.780 $0.720 $0.650 $0.700 $0.750
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 33,695.000 $0.800 $0.780 $0.720 $0.650 $0.700 $0.750
PAV SURF PREP FOR MRK (6")
LF 61,689.000 $0.040 $0.180 $0.200 $0.150 $0.160 $0.200
TEMP TRAF SIGNALS
EA 1.000 $110,000.000 $54,000.000 $50,000.000 $55,000.000 $48,000.000 $50,000.000
SP MIXES SP-B PG64-22
TON 46,152.000 $180.000 $155.000 $143.000 $170.000 $170.000 $167.000
SP MIXES SP-C SAC-A PG70-22
TON 12,926.000 $200.000 $155.000 $153.000 $180.000 $225.000 $175.000
TACK COAT
GAL 11,751.000 $4.000 $6.000 $4.500 $4.250 $5.000 $6.000
SP MIXES SP-D PG64-22 (EXEMPT)
TON 13,386.000 $300.000 $155.000 $155.000 $182.000 $237.000 $170.000
INSTALL FTB
LF 300.000 $50.000 $65.000 $65.000 $50.000 $60.000 $65.000
REMOVE FTB
LF 300.000 $13.000 $8.000 $8.000 $10.000 $8.000 $10.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 40.000 $175.000 $120.000 $150.000 $150.000 $300.000 $200.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $18,000.000 $18,000.000 $22,000.000 $18,000.000 $25,000.000 $30,000.000
TMA (STATIONARY)
DAY 20.000 $225.000 $400.000 $200.000 $1,000.000 $315.000 $500.000
TMA (MOBILE OPERATION)
DAY 10.000 $250.000 $400.000 $250.000 $375.000 $345.000 $500.000
Totals: $46,810,288.720 $37,954,683.080 $41,989,582.790 $43,525,687.690 $47,327,662.750 $48,467,077.820