Show Job Controls
Bid Cobra

WISE CR 6010 (0902-20-097)

Items: 48

County: WISE
Length: 0.0000 MILES
Highway: CR 6010
District: FORT WORTH
Control Number: 0902-20-097
DBE Goal: 0.0%
Project: BR 2009(901)
Guaranty: $20,000.00
Time: 82 WORKING DAYS
Engineer's Estimate: $1,013,532.50
Date: 02/04/2026 (4 months ago)
Contract Number: 2263034
Type: BRIDGE REPLACEMENT
Project ID: A00032669
Contract Type: Federal
Project Description: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (9)
E
Engineer's Estimate
$1,013,532.50
$875,772.49
Over/Under Est: -13.59% -$137,760.01
Over/Under Est: -13.57% -$137,579.80
Amt Left: 0.02% $180.21
Over/Under Est: -6.54% -$66,282.10
Amt Left: 8.16% $71,477.91
Delta: -8.14% -$71,297.70
$966,060.25
Over/Under Est: -4.68% -$47,472.25
Amt Left: 10.31% $90,287.76
Delta: -1.99% -$18,809.85
Over/Under Est: -3.86% -$39,168.30
Amt Left: 11.26% $98,591.71
Delta: -0.86% -$8,303.95
Over/Under Est: 5.38% $54,528.00
Amt Left: 21.96% $192,288.01
Delta: -9.62% -$93,696.30
$1,145,255.08
Over/Under Est: 13% $131,722.58
Amt Left: 30.77% $269,482.59
Delta: -7.23% -$77,194.58
Over/Under Est: 34.67% $351,401.25
Amt Left: 55.85% $489,161.26
Delta: -19.18% -$219,678.67
$1,526,752.50
Over/Under Est: 50.64% $513,220.00
Amt Left: 74.33% $650,980.01
Delta: -11.86% -$161,818.75

Bid Items & Bid Tabulations

48 Total 0 of 48
WISE  |  CR 6010  |  FORT WORTH  |  0902-20-097  |  02/04/2026  |  $1,013,532.50  |  BR 2009(901)  |  BRIDGE REPL  |  82 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
THK CONSTRUCTION LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
BLACKSMITH VENTURES LLC
SKYLINE BRIDGE LLC
GARRET SHIELDS INFRASTRUCTURE
COPPELL CONSTRUCTION CO., INC.
TUCAN CONTRACTING, LLC
ED BELL CONSTRUCTION COMPANY
EARTH BUILDERS, L.P.
PREPARING ROW
STA 3.900 $10,000.000 $7,000.000 $4,000.000 $2,000.000 $4,500.000 $1,000.000 $5,000.000 $2,750.000 $15,000.000 $18,000.000
EXCAV (ROADWAY)
CY 228.000 $30.000 $20.000 $15.000 $25.000 $22.000 $40.000 $40.000 $55.000 $100.000 $40.000
EMBANK (FNL)(DC)(TY B)
CY 426.000 $40.000 $20.000 $20.000 $25.000 $45.000 $40.000 $50.000 $33.000 $40.000 $40.000
COMPOST MANUF TOPSOIL (4")
SY 778.000 $1.500 $6.950 $3.500 $5.000 $5.000 $4.000 $10.000 $3.410 $11.000 $6.000
HYDRO MULCH SEED (PERM_RURAL_SANDY)
SY 778.000 $1.000 $3.770 $3.500 $5.000 $2.000 $2.500 $1.500 $3.850 $8.000 $5.000
HYDRO MULCH SEED (TEMP_WARM)
SY 389.000 $2.500 $5.380 $1.000 $5.000 $2.000 $5.000 $1.500 $5.500 $1.500 $5.000
HYDRO MULCH SEED (TEMP_COOL)
SY 389.000 $2.500 $5.380 $1.000 $5.000 $2.000 $5.000 $1.500 $5.500 $1.500 $5.000
VEGETATIVE WATERING
TGL 28.000 $40.000 $10.000 $1.000 $1.000 $1.000 $50.000 $50.000 $165.000 $152.000 $50.000
FL BS (CMP IN PLC)(TY A GR 1-2) (8")
SY 738.000 $40.000 $40.000 $45.000 $90.000 $50.000 $20.000 $26.000 $38.500 $60.000 $55.000
PRIME COAT(MC-30 OR AE-P)
GAL 142.000 $11.000 $60.880 $20.000 $6.000 $40.000 $12.000 $15.000 $16.500 $15.000 $25.000
ASPH (CRS-2P)
GAL 319.000 $15.000 $30.100 $20.000 $7.000 $35.000 $8.000 $26.000 $28.050 $25.500 $35.000
AGGR (TY-B, GR-4)(SAC-B)
CY 7.000 $350.000 $1,720.000 $1,900.000 $300.000 $2,100.000 $500.000 $2,220.000 $2,442.000 $2,220.000 $2,500.000
D-GR HMA TY-C SAC-B PG70-28
TON 82.000 $300.000 $416.030 $300.000 $200.000 $410.000 $260.000 $390.000 $429.000 $390.000 $480.000
TACK COAT
GAL 71.000 $5.000 $5.380 $8.000 $6.000 $10.000 $10.000 $22.000 $24.200 $22.000 $30.000
CEM STABIL BKFL
CY 68.000 $217.000 $300.000 $300.000 $300.000 $325.000 $200.000 $260.000 $242.000 $550.000 $450.000
DRILL SHAFT (36 IN)
LF 378.000 $240.000 $287.280 $210.000 $250.000 $275.000 $420.000 $300.000 $275.000 $325.000 $450.000
CORE HOLE
EA 2.000 $2,500.000 $440.000 $400.000 $2,500.000 $200.000 $500.000 $400.000 $1,650.000 $200.000 $4,500.000
CL C CONC (ABUT)
CY 31.600 $1,800.000 $1,100.000 $1,200.000 $3,000.000 $1,300.000 $2,000.000 $1,400.000 $1,210.000 $3,000.000 $2,600.000
REINF CONC SLAB
SF 1,950.000 $25.000 $37.000 $34.000 $30.000 $31.000 $20.000 $37.500 $30.800 $70.000 $50.000
APPROACH SLAB
CY 44.700 $500.000 $800.000 $850.000 $30.000 $850.000 $250.000 $920.000 $880.000 $1,700.000 $1,800.000
PRESTR CONC GIRDER (TX28)
LF 297.930 $250.000 $333.020 $290.000 $280.000 $325.000 $300.000 $300.000 $212.710 $325.000 $350.000
RIPRAP (MOW STRIP)(4 IN)
CY 17.000 $885.000 $800.000 $750.000 $500.000 $750.000 $700.000 $700.000 $770.000 $1,350.000 $600.000
RIPRAP (STONE PROTECTION)(30 IN)
CY 771.000 $230.000 $160.000 $190.000 $225.000 $180.000 $150.000 $230.000 $198.000 $225.000 $250.000
RAIL (TY T631)
LF 182.000 $100.000 $98.230 $90.000 $250.000 $94.000 $150.000 $87.250 $106.980 $120.000 $175.000
ARMOR JOINT (SEALED)
LF 46.000 $140.000 $150.000 $200.000 $100.000 $225.000 $500.000 $170.000 $132.000 $180.000 $250.000
REMOV STR (BRIDGE SLAB)
EA 1.000 $12,000.000 $10,000.000 $15,000.000 $15,000.000 $9,500.000 $17,500.000 $30,000.000 $33,000.000 $11,000.000 $28,000.000
REMOV STR (ABUTMENT)
EA 2.000 $22,000.000 $5,000.000 $8,000.000 $5,000.000 $5,000.000 $10,000.000 $15,000.000 $5,500.000 $5,500.000 $15,000.000
MOBILIZATION
LS 1.000 $93,000.000 $90,000.000 $78,000.000 $75,000.000 $90,000.000 $100,000.000 $100,000.000 $220,000.000 $130,000.000 $140,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $10,000.000 $2,292.980 $6,000.000 $2,500.000 $4,000.000 $5,000.000 $10,000.000 $3,300.000 $7,500.000 $3,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $5,260.000 $10,000.000 $10,000.000 $9,000.000 $8,000.000 $1,000.000 $10,000.000 $11,000.000 $8,000.000 $20,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 50.000 $50.000 $50.000 $1.000 $1.000 $50.000 $30.000 $64.000 $60.500 $70.000 $85.000
ROCK FILTER DAMS (REMOVE)
LF 50.000 $20.000 $1.000 $1.000 $1.000 $10.000 $5.000 $20.000 $22.000 $40.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 964.000 $3.000 $3.770 $1.000 $6.000 $3.750 $5.000 $5.000 $3.850 $4.000 $8.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 964.000 $1.000 $1.080 $1.000 $1.000 $1.000 $1.000 $1.000 $1.100 $2.500 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 200.000 $8.000 $4.140 $1.000 $200.000 $12.000 $5.000 $9.000 $4.240 $7.000 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $4.000 $1.080 $1.000 $1.000 $4.000 $1.000 $1.000 $1.100 $3.500 $2.000
MTL W-BEAM GD FEN (TIM POST)
LF 100.000 $25.000 $25.000 $25.000 $35.000 $27.000 $40.000 $24.000 $28.830 $27.800 $35.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $3,332.500 $3,100.000 $3,400.000 $3,500.000 $3,500.000 $3,100.000 $3,267.000 $3,369.000 $3,800.000
WIRE FENCE (TY C)
LF 501.000 $28.000 $25.000 $20.000 $15.000 $24.000 $30.000 $17.000 $33.000 $20.000 $24.000
REMOVE SM RD SN SUP&AM
EA 2.000 $120.000 $250.000 $50.000 $1.000 $150.000 $100.000 $99.000 $108.900 $99.000 $300.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1 (BI)
EA 2.000 $30.000 $19.350 $20.000 $100.000 $35.000 $60.000 $18.000 $27.500 $25.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $45.000 $48.380 $50.000 $100.000 $55.000 $25.000 $45.000 $71.500 $25.000 $100.000
PAVEMENT SLER 6"
LF 484.000 $0.250 $1.620 $1.500 $5.000 $2.000 $2.800 $1.500 $1.650 $1.500 $5.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 780.000 $1.250 $2.690 $2.500 $3.000 $3.000 $2.900 $2.500 $2.750 $2.500 $15.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 780.000 $1.250 $2.690 $2.500 $3.000 $3.000 $0.100 $2.500 $2.750 $2.500 $15.000
REFL PAV MRKR TY II-A-A
EA 10.000 $10.000 $26.880 $25.000 $25.000 $30.000 $1,400.000 $25.000 $27.500 $25.000 $25.000
PAV SURF PREP FOR MRK (6")
LF 484.000 $0.500 $1.080 $1.000 $5.000 $2.000 $2.000 $1.000 $1.100 $1.000 $5.000
RELOCATE EXISTING TRUSS BRIDGE
LS 1.000 $101,540.000 $10,000.000 $55,000.000 $20,000.000 $80,000.000 $110,000.000 $64,000.000 $132,000.000 $100,000.000 $150,000.000
Totals: $1,013,532.500 $875,772.489 $875,952.700 $947,250.400 $966,060.250 $974,364.200 $1,068,060.500 $1,145,255.080 $1,364,933.750 $1,526,752.500
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
Total: $10,000.00