PREPARING ROW
|
STA
|
62.000
|
$3,000.000
|
$500.000
|
$6,250.000
|
$5,250.000
|
$100.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
1,271.000
|
$20.000
|
$30.000
|
$25.000
|
$21.000
|
$25.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
181.000
|
$22.000
|
$35.000
|
$18.000
|
$21.000
|
$30.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,104.000
|
$12.000
|
$24.000
|
$36.000
|
$25.000
|
$45.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
14,424.000
|
$1.000
|
$1.300
|
$7.250
|
$7.500
|
$10.000
|
|
|
DRILL SEEDING (PERM) (URBAN) (CLAY)
|
AC
|
2.980
|
$1,000.000
|
$700.000
|
$4,340.000
|
$2,100.000
|
$2,500.000
|
|
|
VEGETATIVE WATERING
|
MG
|
152.000
|
$25.000
|
$12.000
|
$22.000
|
$75.000
|
$200.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
77.000
|
$200.000
|
$300.000
|
$270.000
|
$315.000
|
$275.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
4,667.000
|
$10.000
|
$12.000
|
$9.000
|
$10.000
|
$20.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (2 TO 4")
|
SY
|
6,617.000
|
$1.000
|
$8.000
|
$5.000
|
$10.000
|
$5.000
|
|
|
PRIME COAT (EC-30)
|
GAL
|
934.000
|
$8.000
|
$6.500
|
$6.500
|
$2.100
|
$10.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
934.000
|
$10.000
|
$8.000
|
$8.000
|
$2.100
|
$4.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (11")
|
SY
|
4,302.000
|
$75.000
|
$140.000
|
$112.000
|
$111.000
|
$160.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
26.400
|
$425.000
|
$560.000
|
$300.000
|
$530.250
|
$750.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
110.000
|
$550.000
|
$695.000
|
$450.000
|
$661.500
|
$900.000
|
|
|
CL C CONC (RAIL FOUNDATION)(HPC)
|
CY
|
258.000
|
$675.000
|
$750.000
|
$500.000
|
$630.000
|
$1,000.000
|
|
|
CLEANING AND SEALING JOINTS
|
LF
|
4,675.000
|
$25.000
|
$6.000
|
$3.250
|
$3.500
|
$4.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
96.000
|
$85.000
|
$110.000
|
$177.000
|
$125.000
|
$130.000
|
|
|
SET (TY I) (24 IN) (6: 1) (C)
|
EA
|
4.000
|
$2,500.000
|
$2,500.000
|
$2,500.000
|
$2,400.000
|
$2,900.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$245,415.150
|
$344,000.000
|
$390,000.000
|
$595,000.000
|
$450,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$8,000.000
|
$10,000.000
|
$40,000.000
|
$31,500.000
|
$15,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
20.000
|
$35.000
|
$35.000
|
$122.500
|
$50.000
|
$160.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
20.000
|
$14.000
|
$12.000
|
$50.000
|
$20.000
|
$67.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
780.000
|
$30.000
|
$32.000
|
$57.000
|
$20.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
780.000
|
$7.000
|
$8.000
|
$30.000
|
$10.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
7,946.000
|
$3.000
|
$3.500
|
$2.650
|
$2.500
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
7,946.000
|
$1.000
|
$0.800
|
$1.250
|
$0.250
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
175.000
|
$5.000
|
$7.000
|
$5.650
|
$7.500
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
175.000
|
$1.500
|
$1.500
|
$2.250
|
$1.000
|
$4.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
240.000
|
$70.000
|
$50.000
|
$127.000
|
$100.000
|
$100.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
240.000
|
$15.000
|
$50.000
|
$18.000
|
$15.000
|
$75.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
1,086.000
|
$70.000
|
$111.000
|
$150.000
|
$75.000
|
$180.000
|
|
|
COLORED TEXTURED CONC (4")
|
SY
|
1,084.000
|
$75.000
|
$82.000
|
$192.000
|
$100.000
|
$150.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
330.000
|
$120.000
|
$110.000
|
$83.000
|
$100.000
|
$140.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
971.000
|
$4.000
|
$8.000
|
$7.180
|
$3.150
|
$10.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$175.000
|
$200.000
|
$410.110
|
$315.000
|
$600.000
|
|
|
CRASH CUSHION ATTEN (INSTALL) (TRACC)
|
EA
|
5.000
|
$9,000.000
|
$24,000.000
|
$22,616.390
|
$21,000.000
|
$27,000.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,270.000
|
$15.000
|
$40.750
|
$19.520
|
$38.850
|
$55.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
460.000
|
$26.000
|
$75.000
|
$30.120
|
$71.400
|
$100.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
1,115.000
|
$18.000
|
$44.000
|
$30.440
|
$42.000
|
$60.000
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
370.000
|
$35.000
|
$80.000
|
$45.730
|
$75.600
|
$110.000
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
10.000
|
$40.000
|
$48.000
|
$32.660
|
$45.150
|
$65.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
2,355.000
|
$3.000
|
$3.300
|
$3.140
|
$3.150
|
$5.000
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
870.000
|
$3.000
|
$4.500
|
$3.640
|
$4.200
|
$6.000
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
1,740.000
|
$3.500
|
$4.500
|
$3.770
|
$4.200
|
$6.000
|
|
|
TRAY CABLE (3 CONDR) (8 AWG)
|
LF
|
2,200.000
|
$6.000
|
$5.500
|
$7.270
|
$5.250
|
$7.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
12.000
|
$1,500.000
|
$3,190.000
|
$1,798.700
|
$3,045.000
|
$4,300.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$9,500.000
|
$11,550.000
|
$9,524.190
|
$11,025.000
|
$15,500.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
80.000
|
$50.000
|
$132.000
|
$33.000
|
$105.000
|
$75.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
18.000
|
$65.000
|
$170.000
|
$31.360
|
$105.000
|
$300.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
28.000
|
$650.000
|
$1,375.000
|
$675.000
|
$708.750
|
$900.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$1,000.000
|
$1,530.000
|
$900.000
|
$855.750
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
6.000
|
$1,200.000
|
$2,310.000
|
$1,100.000
|
$1,312.500
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
2.000
|
$1,600.000
|
$3,265.000
|
$1,450.000
|
$2,047.500
|
$1,900.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
44.000
|
$200.000
|
$600.000
|
$100.000
|
$78.750
|
$130.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
54.000
|
$15.000
|
$20.000
|
$20.000
|
$18.900
|
$63.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
61.000
|
$40.000
|
$25.000
|
$70.000
|
$36.750
|
$94.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
84.000
|
$90.000
|
$120.000
|
$80.000
|
$157.500
|
$110.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF
|
EA
|
674.000
|
$100.000
|
$100.000
|
$80.000
|
$136.500
|
$110.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
170.000
|
$1.000
|
$1.500
|
$2.500
|
$5.250
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
12,310.000
|
$1.000
|
$1.360
|
$1.150
|
$2.100
|
$1.800
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
9,549.000
|
$1.000
|
$1.360
|
$1.200
|
$2.100
|
$1.800
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
6,149.000
|
$2.500
|
$0.900
|
$1.200
|
$1.050
|
$1.200
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
860.000
|
$1.000
|
$1.000
|
$1.000
|
$1.050
|
$1.300
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
7,719.000
|
$1.000
|
$0.800
|
$0.750
|
$0.680
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
6,914.000
|
$1.000
|
$0.800
|
$0.650
|
$0.680
|
$1.100
|
|
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
|
LF
|
150.000
|
$5.000
|
$4.000
|
$3.000
|
$5.250
|
$5.400
|
|
PREFAB PAV MRK TY B (W)(24")(SLD)
|
LF
|
195.000
|
$35.000
|
$20.000
|
$45.000
|
$8.400
|
$27.000
|
|
PREFAB PAV MRK TY B (W)(ARROW)
|
EA
|
11.000
|
$500.000
|
$600.000
|
$850.000
|
$215.250
|
$810.000
|
|
PREFAB PAV MRK TY B (W)(WORD)
|
EA
|
10.000
|
$600.000
|
$900.000
|
$1,200.000
|
$257.250
|
$1,200.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
253.000
|
$5.000
|
$4.000
|
$5.000
|
$6.300
|
$5.400
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
14,464.000
|
$0.500
|
$0.800
|
$0.750
|
$0.530
|
$1.100
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
4,935.000
|
$1.000
|
$0.820
|
$1.150
|
$0.530
|
$1.100
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
1,004.000
|
$2.000
|
$1.000
|
$2.000
|
$2.100
|
$1.300
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
35.000
|
$5.000
|
$3.000
|
$5.000
|
$3.150
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
|
EA
|
64.000
|
$20.000
|
$20.000
|
$10.000
|
$42.000
|
$27.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
15,493.000
|
$0.150
|
$0.180
|
$0.300
|
$0.260
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
6,149.000
|
$0.500
|
$0.260
|
$0.600
|
$0.530
|
$0.350
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
195.000
|
$1.000
|
$0.500
|
$2.000
|
$5.250
|
$0.650
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
11.000
|
$30.000
|
$20.000
|
$35.000
|
$78.750
|
$27.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
10.000
|
$40.000
|
$20.000
|
$55.000
|
$78.750
|
$27.000
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
1.000
|
$36,000.000
|
$69,500.000
|
$34,835.500
|
$66,307.500
|
$95,000.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
14.000
|
$400.000
|
$880.000
|
$422.450
|
$840.000
|
$1,200.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
4.000
|
$400.000
|
$880.000
|
$432.170
|
$840.000
|
$1,200.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
15.000
|
$400.000
|
$880.000
|
$463.840
|
$840.000
|
$1,200.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
3.000
|
$400.000
|
$880.000
|
$425.430
|
$840.000
|
$1,200.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
15.000
|
$400.000
|
$880.000
|
$465.460
|
$840.000
|
$1,200.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
2.000
|
$400.000
|
$880.000
|
$446.190
|
$840.000
|
$1,200.000
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
16.000
|
$200.000
|
$275.000
|
$193.720
|
$262.500
|
$370.000
|
|
|
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
|
EA
|
1.000
|
$215.000
|
$320.000
|
$219.780
|
$304.500
|
$430.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
1,090.000
|
$2.500
|
$4.500
|
$3.440
|
$4.200
|
$7.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(16 CONDR)
|
LF
|
3,755.000
|
$7.000
|
$8.800
|
$6.070
|
$8.400
|
$12.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')LUM
|
EA
|
2.000
|
$16,000.000
|
$23,000.000
|
$16,699.280
|
$21,945.000
|
$3,500.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM
|
EA
|
1.000
|
$35,000.000
|
$47,300.000
|
$36,738.400
|
$45,150.000
|
$65,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')LUM
|
EA
|
1.000
|
$35,000.000
|
$48,400.000
|
$40,189.580
|
$46,200.000
|
$68,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(65')
|
EA
|
1.000
|
$30,000.000
|
$45,320.000
|
$37,115.480
|
$43,260.000
|
$64,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(65')LUM
|
EA
|
2.000
|
$34,000.000
|
$49,500.000
|
$42,437.710
|
$47,250.000
|
$69,000.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
1,000.000
|
$7.500
|
$12.000
|
$16.000
|
$15.750
|
$20.000
|
|
|
D-GR HMA TY-C SAC-B PG70-22
|
TON
|
1,521.000
|
$120.000
|
$115.000
|
$115.000
|
$155.000
|
$150.000
|
|
|
D-GR HMA TY-D PG64-22
|
TON
|
731.000
|
$130.000
|
$130.000
|
$130.000
|
$215.000
|
$175.000
|
|
|
TACK COAT
|
GAL
|
662.000
|
$20.000
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,500.000
|
$10,000.000
|
$30,000.000
|
$8,000.000
|
$40,000.000
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
2.000
|
$8,500.000
|
$11,935.000
|
$9,416.240
|
$11,392.500
|
$16,000.000
|
|
|
CCTV MOUNT (POLE)
|
EA
|
2.000
|
$600.000
|
$1,320.000
|
$372.420
|
$1,260.000
|
$1,800.000
|
|
|
INSTALL OF (RADD) VEHICLE DETECTORS
|
EA
|
6.000
|
$1,800.000
|
$2,420.000
|
$1,587.510
|
$2,310.000
|
$3,300.000
|
|
|
INSTALL OF (RPD) VEHICLE DETECTORS
|
EA
|
7.000
|
$1,800.000
|
$2,420.000
|
$1,417.470
|
$2,310.000
|
$3,300.000
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
1.000
|
$8,000.000
|
$11,550.000
|
$8,343.490
|
$11,025.000
|
$15,500.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
24.000
|
$50.000
|
$100.000
|
$94.000
|
$315.000
|
$100.000
|
|
Totals: |
$2,699,566.600
|
$3,489,536.120
|
$3,927,194.290
|
$4,136,002.610
|
$4,584,286.750
|