PREPARING ROW
|
STA
|
60.000
|
$2,500.000
|
$1,800.000
|
$4,000.000
|
$1,250.000
|
$932.090
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
734.000
|
$15.000
|
$16.000
|
$15.750
|
$12.000
|
$13.880
|
|
|
REMOVING STAB BASE AND ASPH PAV(15")
|
SY
|
9,341.000
|
$7.250
|
$4.000
|
$7.500
|
$9.000
|
$8.700
|
|
|
REMOVING UNTREATED BASE (8")
|
SY
|
200.000
|
$1.750
|
$7.000
|
$1.000
|
$20.000
|
$14.910
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
31,718.000
|
$10.000
|
$5.500
|
$12.000
|
$14.000
|
$17.870
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
13,987.000
|
$15.000
|
$2.000
|
$8.000
|
$4.500
|
$18.630
|
|
|
BACKFILL TY A
|
CY
|
102.000
|
$50.000
|
$67.000
|
$111.000
|
$75.000
|
$21.870
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
50,596.000
|
$1.500
|
$2.000
|
$0.760
|
$3.750
|
$0.140
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
25,298.000
|
$0.150
|
$0.050
|
$0.120
|
$0.150
|
$0.140
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
25,298.000
|
$0.150
|
$0.050
|
$0.120
|
$0.150
|
$0.410
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
50,596.000
|
$0.500
|
$0.300
|
$0.310
|
$0.300
|
$0.320
|
|
|
VEGETATIVE WATERING
|
MG
|
1,771.000
|
$20.000
|
$25.000
|
$3.150
|
$23.000
|
$32.180
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
1,823.000
|
$35.000
|
$40.000
|
$55.000
|
$50.000
|
$49.870
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
1,237.000
|
$150.000
|
$180.000
|
$150.000
|
$187.000
|
$175.440
|
|
|
LIME TRT (EXIST MATL)(18")
|
SY
|
10,945.000
|
$8.000
|
$8.000
|
$6.000
|
$4.750
|
$8.840
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
21,191.000
|
$2.250
|
$6.000
|
$3.000
|
$3.250
|
$5.550
|
|
|
SALV,HAUL & STKPL RCL APH PV (2")
|
SY
|
22,184.000
|
$2.000
|
$1.500
|
$2.000
|
$1.500
|
$1.240
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
7,042.000
|
$4.000
|
$3.000
|
$1.050
|
$4.000
|
$4.600
|
|
|
TACK COAT
|
GAL
|
13,062.000
|
$4.000
|
$2.000
|
$1.050
|
$3.250
|
$3.480
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
833.000
|
$60.000
|
$50.000
|
$70.000
|
$55.000
|
$58.410
|
|
|
CONC PVMT (CONT REINF - CRCP) (12")
|
SY
|
15,348.000
|
$70.000
|
$80.000
|
$70.000
|
$82.000
|
$98.750
|
|
|
CONC PVMT (JOINTED-CPCD)(HES)(13")
|
SY
|
1,994.000
|
$85.000
|
$105.000
|
$111.000
|
$140.000
|
$112.190
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
63.000
|
$120.000
|
$55.000
|
$159.750
|
$150.000
|
$100.830
|
|
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
159.000
|
$10.000
|
$385.000
|
$585.750
|
$600.000
|
$381.470
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
63.000
|
$150.000
|
$120.000
|
$117.150
|
$120.000
|
$256.730
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
40.000
|
$150.000
|
$600.000
|
$798.750
|
$550.000
|
$424.410
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
455.000
|
$80.000
|
$105.000
|
$57.510
|
$75.000
|
$67.080
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
232.000
|
$80.000
|
$130.000
|
$117.150
|
$120.000
|
$105.400
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$7,000.000
|
$12,000.000
|
$10,117.500
|
$5,500.000
|
$12,588.530
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,000.000
|
$1,000.000
|
$852.000
|
$975.000
|
$1,789.620
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$800.000
|
$1,100.000
|
$905.250
|
$1,100.000
|
$1,183.140
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,000.000
|
$1,200.000
|
$958.500
|
$1,200.000
|
$2,320.910
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$1,500.000
|
$1,500.000
|
$1,011.750
|
$1,400.000
|
$2,544.620
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,500.000
|
$1,500.000
|
$1,011.750
|
$1,400.000
|
$2,209.060
|
|
|
REMOV STR (WINGWALL)
|
EA
|
1.000
|
$1,400.000
|
$4,000.000
|
$1,065.000
|
$1,000.000
|
$3,728.380
|
|
|
REMOV STR (PIPE)
|
LF
|
62.000
|
$18.000
|
$20.000
|
$31.950
|
$20.000
|
$49.710
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$337,392.000
|
$457,000.000
|
$494,000.000
|
$600,000.000
|
$621,395.980
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$2,000.000
|
$1,500.000
|
$15,750.000
|
$12,500.000
|
$12,427.920
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
50.000
|
$50.000
|
$30.000
|
$80.000
|
$70.000
|
$59.750
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
50.000
|
$10.000
|
$15.000
|
$30.000
|
$20.000
|
$9.330
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$20.000
|
$15.000
|
$20.000
|
$20.000
|
$23.090
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$8.000
|
$5.000
|
$10.000
|
$8.000
|
$7.870
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,235.000
|
$2.250
|
$2.000
|
$1.750
|
$2.000
|
$2.400
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,235.000
|
$0.600
|
$0.750
|
$0.250
|
$0.500
|
$0.750
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
700.000
|
$3.000
|
$3.000
|
$5.250
|
$6.000
|
$4.280
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
700.000
|
$1.250
|
$0.750
|
$1.000
|
$1.000
|
$1.170
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
2,880.000
|
$35.000
|
$65.000
|
$9.000
|
$75.000
|
$81.900
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
200.000
|
$35.000
|
$70.000
|
$18.000
|
$75.000
|
$81.900
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
2,240.000
|
$9.000
|
$7.500
|
$6.000
|
$12.000
|
$11.480
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$9.000
|
$8.000
|
$24.000
|
$12.000
|
$11.480
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
340.000
|
$15.000
|
$6.500
|
$12.500
|
$12.000
|
$11.480
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
2,880.000
|
$13.000
|
$6.000
|
$9.000
|
$12.000
|
$11.480
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
200.000
|
$9.000
|
$10.000
|
$18.000
|
$12.000
|
$11.480
|
|
|
DRIVEWAYS (CONC)
|
SY
|
281.000
|
$90.000
|
$85.000
|
$111.000
|
$105.000
|
$68.580
|
|
|
DRIVEWAYS (ACP)
|
SY
|
187.000
|
$50.000
|
$40.000
|
$50.000
|
$45.000
|
$115.510
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
478.000
|
$500.000
|
$90.000
|
$111.000
|
$115.000
|
$72.380
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
12,140.000
|
$15.000
|
$0.400
|
$0.300
|
$0.350
|
$0.210
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
175.000
|
$15.000
|
$10.250
|
$1.000
|
$8.000
|
$3.730
|
|
|
RUMBLE STRIPS (SHOULDER) CONCRETE
|
LF
|
7,090.000
|
$25.000
|
$0.700
|
$5.000
|
$0.600
|
$1.460
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
24.000
|
$500.000
|
$415.000
|
$450.000
|
$860.000
|
$963.160
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
12.000
|
$500.000
|
$625.000
|
$650.000
|
$900.000
|
$994.230
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
3.000
|
$80.000
|
$100.000
|
$150.000
|
$150.000
|
$124.280
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
32.000
|
$50.000
|
$105.000
|
$200.000
|
$165.000
|
$186.420
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
8,743.000
|
$3.500
|
$0.170
|
$1.060
|
$1.250
|
$1.240
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
7,619.000
|
$3.500
|
$0.170
|
$1.060
|
$1.250
|
$1.240
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-A
|
LF
|
6,372.000
|
$3.500
|
$0.700
|
$0.530
|
$0.600
|
$0.620
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
LF
|
17,227.000
|
$2.000
|
$0.700
|
$0.530
|
$0.600
|
$0.620
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
LF
|
11,451.000
|
$3.500
|
$0.700
|
$0.690
|
$0.850
|
$0.810
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
17,227.000
|
$2.000
|
$0.550
|
$0.530
|
$0.600
|
$0.620
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
11,451.000
|
$2.000
|
$0.550
|
$0.530
|
$0.600
|
$0.620
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
487.000
|
$1.000
|
$1.000
|
$3.000
|
$1.500
|
$1.100
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
443.000
|
$2.000
|
$1.000
|
$3.000
|
$1.500
|
$1.230
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
27.000
|
$2.000
|
$1.500
|
$4.000
|
$1.500
|
$1.360
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
433.000
|
$1.500
|
$1.000
|
$1.060
|
$1.500
|
$1.240
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,916.000
|
$1.500
|
$1.000
|
$1.060
|
$1.250
|
$1.240
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
1,235.000
|
$2.000
|
$3.750
|
$3.710
|
$4.500
|
$4.350
|
|
|
PAVEMENT SEALER 4"
|
LF
|
10,915.000
|
$0.250
|
$0.200
|
$0.210
|
$0.300
|
$0.250
|
|
|
PAVEMENT SEALER 8"
|
LF
|
441.000
|
$0.350
|
$0.400
|
$0.530
|
$0.600
|
$0.620
|
|
|
PAVEMENT SEALER 12"
|
LF
|
32.000
|
$0.450
|
$2.150
|
$3.180
|
$5.000
|
$3.730
|
|
|
PAVEMENT SEALER 24"
|
LF
|
35.000
|
$0.500
|
$4.250
|
$3.180
|
$5.000
|
$3.730
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
2.000
|
$25.000
|
$55.000
|
$79.500
|
$100.000
|
$93.210
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
2.000
|
$25.000
|
$80.000
|
$79.500
|
$100.000
|
$93.210
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
1,960.000
|
$0.500
|
$0.500
|
$0.530
|
$0.600
|
$0.620
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
12,126.000
|
$0.300
|
$0.500
|
$0.470
|
$0.650
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
14,282.000
|
$0.350
|
$0.500
|
$0.470
|
$0.600
|
$0.550
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
35.000
|
$5.000
|
$22.000
|
$15.900
|
$20.000
|
$18.640
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
11.000
|
$100.000
|
$300.000
|
$206.700
|
$250.000
|
$242.340
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
9.000
|
$100.000
|
$400.000
|
$254.400
|
$300.000
|
$298.270
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
34.000
|
$8.000
|
$42.000
|
$47.700
|
$60.000
|
$55.930
|
|
PREFAB PAV MRK TY C (Y) (MED NOSE)
|
EA
|
1.000
|
$300.000
|
$530.000
|
$795.000
|
$1,000.000
|
$932.090
|
|
REFL PAV MRKR TY I-C
|
EA
|
78.000
|
$3.000
|
$3.750
|
$4.240
|
$5.000
|
$4.970
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
246.000
|
$3.000
|
$3.750
|
$4.240
|
$5.000
|
$4.970
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
162.000
|
$3.500
|
$3.750
|
$4.240
|
$5.000
|
$4.970
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
31,678.000
|
$2.000
|
$0.700
|
$0.370
|
$0.500
|
$0.430
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
28,398.000
|
$0.100
|
$0.170
|
$0.050
|
$0.100
|
$0.060
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
2,960.000
|
$0.500
|
$0.320
|
$0.110
|
$0.200
|
$0.120
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
1,235.000
|
$0.750
|
$1.050
|
$0.530
|
$0.600
|
$0.620
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
35.000
|
$1.500
|
$4.250
|
$2.120
|
$3.000
|
$2.490
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
11.000
|
$25.000
|
$27.000
|
$53.000
|
$60.000
|
$62.140
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
9.000
|
$25.000
|
$37.000
|
$53.000
|
$60.000
|
$62.140
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
34.000
|
$20.000
|
$5.250
|
$42.400
|
$50.000
|
$49.710
|
|
|
PAV SURF PREP FOR MRK (MED NOSE)
|
EA
|
1.000
|
$30.000
|
$53.000
|
$265.000
|
$300.000
|
$310.700
|
|
|
D-GR HMA TY-B SAC-B PG64-22
|
TON
|
9,360.000
|
$70.000
|
$55.000
|
$60.000
|
$67.000
|
$75.060
|
|
|
SP MIXES SP-C SAC-A PG70-28
|
TON
|
4,061.000
|
$135.000
|
$92.000
|
$105.250
|
$103.000
|
$115.890
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$10,000.000
|
$10,000.000
|
$15,000.000
|
$6,213.960
|
|
|
TMA (STATIONARY)
|
DAY
|
260.000
|
$200.000
|
$20.000
|
$75.000
|
$100.000
|
$173.990
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
15.000
|
$200.000
|
$100.000
|
$900.000
|
$300.000
|
$310.700
|
|
Totals: |
$5,637,486.200
|
$4,701,956.700
|
$5,148,495.000
|
$5,832,423.750
|
$6,388,134.740
|