WISE SH 101 (0134-06-053)

Items: 107

County: WISE
Length: N/A
Highway: SH 101
District: FORT WORTH
Control Number: 0134-06-053
DBE Goal: N/A
Project: C 134-6-53
Guaranty: N/A
Time: 320 WORKING DAYS
Engineer's Estimate: $5,637,486.20
Date: 06/03/2021 (5 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$5,637,486.20
$4,701,956.70
Over/Under Est: -16.59% -$935,529.50
Over/Under Est: -8.67% -$488,991.20
Amt Left: 9.5% $446,538.30
Over/Under Est: 3.46% $194,937.55
Amt Left: 24.04% $1,130,467.05
Delta: -13.28% -$683,928.75
$6,388,134.74
Over/Under Est: 13.32% $750,648.54
Amt Left: 35.86% $1,686,178.04
Delta: -9.53% -$555,710.99

Bid Items & Bid Tabulations

107 Total 0 of 107
WISE  |  SH 101  |  FORT WORTH  |  0134-06-053  |  06/03/2021  |  $5,637,486.20  |  C 134-6-53  |  REHAB EXIST ROADWAY  |  320 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAGOE-PUBLIC COMPANY
ED BELL CONSTRUCTION COMPANY
JAY MILLS CONTRACTING, INCORPORATED
ALTUS CONSTRUCTION LLC
PREPARING ROW
STA 60.000 $2,500.000 $1,800.000 $4,000.000 $1,250.000 $932.090
REMOVING CONC (DRIVEWAYS)
SY 734.000 $15.000 $16.000 $15.750 $12.000 $13.880
REMOVING STAB BASE AND ASPH PAV(15")
SY 9,341.000 $7.250 $4.000 $7.500 $9.000 $8.700
REMOVING UNTREATED BASE (8")
SY 200.000 $1.750 $7.000 $1.000 $20.000 $14.910
EXCAVATION (ROADWAY)
CY 31,718.000 $10.000 $5.500 $12.000 $14.000 $17.870
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 13,987.000 $15.000 $2.000 $8.000 $4.500 $18.630
BACKFILL TY A
CY 102.000 $50.000 $67.000 $111.000 $75.000 $21.870
COMPOST MANUF TOPSOIL (4")
SY 50,596.000 $1.500 $2.000 $0.760 $3.750 $0.140
BROADCAST SEED (TEMP) (WARM)
SY 25,298.000 $0.150 $0.050 $0.120 $0.150 $0.140
BROADCAST SEED (TEMP) (COOL)
SY 25,298.000 $0.150 $0.050 $0.120 $0.150 $0.410
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 50,596.000 $0.500 $0.300 $0.310 $0.300 $0.320
VEGETATIVE WATERING
MG 1,771.000 $20.000 $25.000 $3.150 $23.000 $32.180
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 1,823.000 $35.000 $40.000 $55.000 $50.000 $49.870
LIME (HYDRATED LIME (SLURRY))
TON 1,237.000 $150.000 $180.000 $150.000 $187.000 $175.440
LIME TRT (EXIST MATL)(18")
SY 10,945.000 $8.000 $8.000 $6.000 $4.750 $8.840
LIME TRT (EXST MATL)(8")
SY 21,191.000 $2.250 $6.000 $3.000 $3.250 $5.550
SALV,HAUL & STKPL RCL APH PV (2")
SY 22,184.000 $2.000 $1.500 $2.000 $1.500 $1.240
PRIME COAT (MULTI OPTION)
GAL 7,042.000 $4.000 $3.000 $1.050 $4.000 $4.600
TACK COAT
GAL 13,062.000 $4.000 $2.000 $1.050 $3.250 $3.480
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 833.000 $60.000 $50.000 $70.000 $55.000 $58.410
CONC PVMT (CONT REINF - CRCP) (12")
SY 15,348.000 $70.000 $80.000 $70.000 $82.000 $98.750
CONC PVMT (JOINTED-CPCD)(HES)(13")
SY 1,994.000 $85.000 $105.000 $111.000 $140.000 $112.190
CUT & RESTORE ASPH PAVING
SY 63.000 $120.000 $55.000 $159.750 $150.000 $100.830
RIPRAP (CONC)(CL B)(5 IN)
CY 159.000 $10.000 $385.000 $585.750 $600.000 $381.470
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 63.000 $150.000 $120.000 $117.150 $120.000 $256.730
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 40.000 $150.000 $600.000 $798.750 $550.000 $424.410
RC PIPE (CL IV)(18 IN)
LF 455.000 $80.000 $105.000 $57.510 $75.000 $67.080
RC PIPE (CL IV)(24 IN)
LF 232.000 $80.000 $130.000 $117.150 $120.000 $105.400
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 1.000 $7,000.000 $12,000.000 $10,117.500 $5,500.000 $12,588.530
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 4.000 $1,000.000 $1,000.000 $852.000 $975.000 $1,789.620
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 12.000 $800.000 $1,100.000 $905.250 $1,100.000 $1,183.140
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,000.000 $1,200.000 $958.500 $1,200.000 $2,320.910
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 2.000 $1,500.000 $1,500.000 $1,011.750 $1,400.000 $2,544.620
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $1,500.000 $1,500.000 $1,011.750 $1,400.000 $2,209.060
REMOV STR (WINGWALL)
EA 1.000 $1,400.000 $4,000.000 $1,065.000 $1,000.000 $3,728.380
REMOV STR (PIPE)
LF 62.000 $18.000 $20.000 $31.950 $20.000 $49.710
MOBILIZATION
LS 1.000 $337,392.000 $457,000.000 $494,000.000 $600,000.000 $621,395.980
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $2,000.000 $1,500.000 $15,750.000 $12,500.000 $12,427.920
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 50.000 $50.000 $30.000 $80.000 $70.000 $59.750
ROCK FILTER DAMS (REMOVE)
LF 50.000 $10.000 $15.000 $30.000 $20.000 $9.330
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $20.000 $15.000 $20.000 $20.000 $23.090
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $8.000 $5.000 $10.000 $8.000 $7.870
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,235.000 $2.250 $2.000 $1.750 $2.000 $2.400
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,235.000 $0.600 $0.750 $0.250 $0.500 $0.750
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 700.000 $3.000 $3.000 $5.250 $6.000 $4.280
BIODEG EROSN CONT LOGS (REMOVE)
LF 700.000 $1.250 $0.750 $1.000 $1.000 $1.170
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 2,880.000 $35.000 $65.000 $9.000 $75.000 $81.900
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 200.000 $35.000 $70.000 $18.000 $75.000 $81.900
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 2,240.000 $9.000 $7.500 $6.000 $12.000 $11.480
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 40.000 $9.000 $8.000 $24.000 $12.000 $11.480
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 340.000 $15.000 $6.500 $12.500 $12.000 $11.480
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 2,880.000 $13.000 $6.000 $9.000 $12.000 $11.480
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 200.000 $9.000 $10.000 $18.000 $12.000 $11.480
DRIVEWAYS (CONC)
SY 281.000 $90.000 $85.000 $111.000 $105.000 $68.580
DRIVEWAYS (ACP)
SY 187.000 $50.000 $40.000 $50.000 $45.000 $115.510
DRIVEWAYS (CONC) (HES)
SY 478.000 $500.000 $90.000 $111.000 $115.000 $72.380
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 12,140.000 $15.000 $0.400 $0.300 $0.350 $0.210
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 175.000 $15.000 $10.250 $1.000 $8.000 $3.730
RUMBLE STRIPS (SHOULDER) CONCRETE
LF 7,090.000 $25.000 $0.700 $5.000 $0.600 $1.460
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 24.000 $500.000 $415.000 $450.000 $860.000 $963.160
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 12.000 $500.000 $625.000 $650.000 $900.000 $994.230
REMOVE SM RD SN SUP&AM
EA 3.000 $80.000 $100.000 $150.000 $150.000 $124.280
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 32.000 $50.000 $105.000 $200.000 $165.000 $186.420
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 8,743.000 $3.500 $0.170 $1.060 $1.250 $1.240
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 7,619.000 $3.500 $0.170 $1.060 $1.250 $1.240
WK ZN PAV MRK REMOV (REFL) TY I-A
LF 6,372.000 $3.500 $0.700 $0.530 $0.600 $0.620
WK ZN PAV MRK REMOV (REFL) TY I-C
LF 17,227.000 $2.000 $0.700 $0.530 $0.600 $0.620
WK ZN PAV MRK REMOV (REFL) TY II-A-A
LF 11,451.000 $3.500 $0.700 $0.690 $0.850 $0.810
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 17,227.000 $2.000 $0.550 $0.530 $0.600 $0.620
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 11,451.000 $2.000 $0.550 $0.530 $0.600 $0.620
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 487.000 $1.000 $1.000 $3.000 $1.500 $1.100
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 443.000 $2.000 $1.000 $3.000 $1.500 $1.230
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 27.000 $2.000 $1.500 $4.000 $1.500 $1.360
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 433.000 $1.500 $1.000 $1.060 $1.500 $1.240
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,916.000 $1.500 $1.000 $1.060 $1.250 $1.240
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 1,235.000 $2.000 $3.750 $3.710 $4.500 $4.350
PAVEMENT SEALER 4"
LF 10,915.000 $0.250 $0.200 $0.210 $0.300 $0.250
PAVEMENT SEALER 8"
LF 441.000 $0.350 $0.400 $0.530 $0.600 $0.620
PAVEMENT SEALER 12"
LF 32.000 $0.450 $2.150 $3.180 $5.000 $3.730
PAVEMENT SEALER 24"
LF 35.000 $0.500 $4.250 $3.180 $5.000 $3.730
PAVEMENT SEALER (ARROW)
EA 2.000 $25.000 $55.000 $79.500 $100.000 $93.210
PAVEMENT SEALER (WORD)
EA 2.000 $25.000 $80.000 $79.500 $100.000 $93.210
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 1,960.000 $0.500 $0.500 $0.530 $0.600 $0.620
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 12,126.000 $0.300 $0.500 $0.470 $0.650 $0.550
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 14,282.000 $0.350 $0.500 $0.470 $0.600 $0.550
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 35.000 $5.000 $22.000 $15.900 $20.000 $18.640
PREFAB PAV MRK TY C (W) (ARROW)
EA 11.000 $100.000 $300.000 $206.700 $250.000 $242.340
PREFAB PAV MRK TY C (W) (WORD)
EA 9.000 $100.000 $400.000 $254.400 $300.000 $298.270
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 34.000 $8.000 $42.000 $47.700 $60.000 $55.930
PREFAB PAV MRK TY C (Y) (MED NOSE)
EA 1.000 $300.000 $530.000 $795.000 $1,000.000 $932.090
REFL PAV MRKR TY I-C
EA 78.000 $3.000 $3.750 $4.240 $5.000 $4.970
REFL PAV MRKR TY II-A-A
EA 246.000 $3.000 $3.750 $4.240 $5.000 $4.970
REFL PAV MRKR TY II-C-R
EA 162.000 $3.500 $3.750 $4.240 $5.000 $4.970
ELIM EXT PAV MRK & MRKS (4")
LF 31,678.000 $2.000 $0.700 $0.370 $0.500 $0.430
PAV SURF PREP FOR MRK (4")
LF 28,398.000 $0.100 $0.170 $0.050 $0.100 $0.060
PAV SURF PREP FOR MRK (8")
LF 2,960.000 $0.500 $0.320 $0.110 $0.200 $0.120
PAV SURF PREP FOR MRK (12")
LF 1,235.000 $0.750 $1.050 $0.530 $0.600 $0.620
PAV SURF PREP FOR MRK (24")
LF 35.000 $1.500 $4.250 $2.120 $3.000 $2.490
PAV SURF PREP FOR MRK (ARROW)
EA 11.000 $25.000 $27.000 $53.000 $60.000 $62.140
PAV SURF PREP FOR MRK (WORD)
EA 9.000 $25.000 $37.000 $53.000 $60.000 $62.140
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 34.000 $20.000 $5.250 $42.400 $50.000 $49.710
PAV SURF PREP FOR MRK (MED NOSE)
EA 1.000 $30.000 $53.000 $265.000 $300.000 $310.700
D-GR HMA TY-B SAC-B PG64-22
TON 9,360.000 $70.000 $55.000 $60.000 $67.000 $75.060
SP MIXES SP-C SAC-A PG70-28
TON 4,061.000 $135.000 $92.000 $105.250 $103.000 $115.890
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $10,000.000 $10,000.000 $15,000.000 $6,213.960
TMA (STATIONARY)
DAY 260.000 $200.000 $20.000 $75.000 $100.000 $173.990
TMA (MOBILE OPERATION)
DAY 15.000 $200.000 $100.000 $900.000 $300.000 $310.700
Totals: $5,637,486.200 $4,701,956.700 $5,148,495.000 $5,832,423.750 $6,388,134.740