WINKLER FM 1232 (1371-01-023)

Items: 102

County: WINKLER
Length: N/A
Highway: FM 1232
District: ODESSA
Control Number: 1371-01-023
DBE Goal: N/A
Project: F 2023(150)
Guaranty: N/A
Time: 390 WORKING DAYS
Engineer's Estimate: $21,537,195.83
Date: 10/06/2023 (2 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD SHOULDERS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$21,537,195.83
Over/Under Est: -9.23% -$1,988,691.19
$20,572,072.74
Over/Under Est: -4.48% -$965,123.09
Amt Left: 5.24% $1,023,568.10
$20,671,222.55
Over/Under Est: -4.02% -$865,973.28
Amt Left: 5.74% $1,122,717.91
Delta: -0.48% -$99,149.81
$24,650,992.47
Over/Under Est: 14.46% $3,113,796.64
Amt Left: 26.1% $5,102,487.83
Delta: -19.25% -$3,979,769.92
Subcontractor Percentage Amount
W. S. CONSTRUCTION COMPANY 8.26% $1,668,651.21
HJC FARMS, INC. 2.31% $466,656.69
DOUBLE A CONTRACTING, L.P. 2.01% $406,051.93
R.E.B.D. TRUCKING LLC 1.60% $323,225.42
WILLIS ELECTRIC CO., LP 0.84% $169,693.34
CONTRACTORS SERVICE, LTD. 0.78% $157,572.39
TEXOP CONSTRUCTION 0.69% $139,390.96
DK CONTRACTING, LLC 0.39% $78,786.20
FIBERTEX, LLC 0.12% $24,241.91
ALTEX LANDSCAPE CONSTRUCTION, INC. 0.01% $2,020.16
Total: 17.01% $3,436,290.21

Bid Items & Bid Tabulations

102 Total 0 of 102
WINKLER  |  FM 1232  |  ODESSA  |  1371-01-023  |  10/06/2023  |  $21,537,195.83  |  F 2023(150)  |  WIDEN ROAD - ADD SHOULDERS  |  390 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
A. L. HELMCAMP, INC.
FNF CONSTRUCTION, INC.
GILVIN-TERRILL, LTD.
REMOVE STAB BASE & ASPH PAV (4"-5")
SY 71,424.000 $10.500 $4.420 $9.500 $4.500 $5.000
EXCAVATION (ROADWAY)
CY 33,477.000 $29.670 $19.250 $13.000 $7.250 $28.500
EMBANKMENT (FINAL)(DENS CONT)(TY D)
CY 29,669.000 $14.590 $25.000 $21.000 $14.000 $33.500
BLADING
HR 80.000 $325.000 $425.000 $275.000 $335.000 $155.000
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 448.000 $3.420 $4.000 $3.000 $7.000 $20.000
PROOF ROLLING
HR 80.000 $120.000 $175.500 $275.000 $130.000 $250.000
FL BS (CMP IN PLC) (TY A GR 4) (3.5")
SY 97,981.000 $9.700 $9.750 $13.000 $6.750 $20.000
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 71,424.000 $4.190 $1.500 $2.000 $2.000 $10.000
PRIME COAT (AE-P)
GAL 33,386.000 $8.570 $4.770 $4.800 $6.500 $5.500
FOG SEAL (CSS-1H)
GAL 4,382.000 $6.710 $4.950 $6.000 $4.000 $7.000
ASPH (AC-20-5TR)
GAL 59,177.000 $8.650 $5.000 $5.000 $6.000 $5.000
AGGR(TY-PB GR-4 SAC-A)
CY 1,425.000 $300.000 $220.000 $200.000 $187.000 $150.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 5,445.000 $70.000 $82.500 $60.000 $90.000 $100.000
STRUCT EXCAV (BOX)
CY 1,302.000 $26.000 $85.000 $17.000 $60.000 $30.000
CEM STABIL BKFL
CY 176.000 $312.000 $287.500 $320.000 $355.000 $500.000
TRENCH EXCAVATION PROTECTION
LF 373.000 $20.000 $28.750 $25.000 $95.000 $65.000
TEMPORARY SPL SHORING
SF 5,967.000 $50.680 $74.750 $30.000 $95.000 $65.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 70.000 $350.000 $460.000 $490.000 $500.000 $750.000
RIPRAP (CONC)(5 IN)
CY 96.000 $1,500.000 $1,150.000 $900.000 $1,055.000 $1,000.000
GABION MATTRESSES (GALV)(12 IN)
SY 49.000 $140.000 $287.500 $135.000 $300.000 $400.000
CONC BOX CULV (8 FT X 6 FT)
LF 88.000 $1,104.000 $1,495.000 $1,400.000 $2,775.000 $1,300.000
CONC BOX CULV (9 FT X 5 FT)
LF 137.000 $2,000.000 $1,610.000 $1,550.000 $3,550.000 $1,500.000
CONC BOX CULV (10 FT X 8 FT)
LF 55.000 $1,000.000 $2,530.000 $2,000.000 $3,800.000 $2,200.000
HEADWALL (CH - PW - S) (DIA= 24 IN)
EA 2.000 $7,200.000 $8,625.000 $14,000.000 $16,500.000 $25,000.000
WINGWALL (PW - 1) (HW=10 FT)
EA 2.000 $88,544.080 $86,250.000 $130,000.000 $92,000.000 $75,000.000
WINGWALL (PW - 1) (HW=11 FT)
EA 2.000 $114,491.260 $97,750.000 $155,000.000 $97,000.000 $85,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 4.000 $32,500.000 $43,700.000 $33,000.000 $30,000.000 $38,000.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 8.000 $2,248.040 $2,875.000 $3,000.000 $6,000.000 $10,000.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $2,750.000 $4,600.000 $4,200.000 $6,500.000 $12,000.000
REMOV STR (BOX CULVERT)
EA 1.000 $14,000.000 $8,625.000 $16,000.000 $40,000.000 $7,500.000
REMOV STR (WINGWALL)
EA 2.000 $1,800.000 $2,875.000 $1,700.000 $15,000.000 $6,000.000
REMOV STR (PIPE)
LF 330.000 $31.610 $69.000 $23.000 $100.000 $55.000
MOBILIZATION
LS 1.000 $1,971,176.910 $1,300,000.000 $1,800,000.000 $2,063,000.000 $2,500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 21.000 $9,829.200 $40,000.000 $41,550.000 $55,000.000 $100,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 620.000 $35.000 $35.000 $20.000 $50.000 $45.000
CONSTRUCTION EXITS (REMOVE)
SY 620.000 $11.240 $20.000 $5.000 $10.000 $10.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,440.000 $7.500 $15.000 $9.500 $11.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,440.000 $3.610 $6.000 $2.200 $2.000 $5.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 4.000 $4,900.000 $13,500.000 $5,600.000 $15,000.000 $4,000.000
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
LF 920.000 $100.000 $28.750 $120.000 $22.000 $50.000
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
LF 3,120.000 $50.000 $23.000 $50.000 $15.000 $10.000
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
LF 920.000 $70.000 $23.000 $40.000 $7.000 $10.000
CONC CURB (TY II)
LF 115.000 $40.750 $115.000 $100.000 $110.000 $100.000
INTERSECTIONS (ACP)
SY 3,935.000 $69.370 $97.000 $110.000 $250.000 $75.000
DRIVEWAYS (ACP)
SY 454.000 $72.000 $195.000 $150.000 $280.000 $75.000
RUMBLE STRIPS (SHOULDER)
LF 54,787.000 $0.470 $0.210 $0.320 $0.200 $0.400
RUMBLE STRIPS (CENTERLINE)
LF 44,592.000 $2.620 $0.320 $0.350 $0.200 $0.400
MTL W-BEAM GD FEN (STEEL POST)
LF 3,564.000 $36.000 $38.240 $38.000 $48.000 $35.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 4.000 $1,900.000 $1,610.000 $1,600.000 $2,000.000 $1,400.000
REMOVE METAL BEAM GUARD FENCE
LF 450.000 $3.000 $3.450 $3.250 $4.500 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 18.000 $3,900.000 $3,852.500 $3,900.000 $4,800.000 $3,350.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $325.000 $345.000 $350.000 $430.000 $300.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 32.000 $2,369.900 $2,875.000 $3,800.000 $1,030.000 $2,500.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $950.000 $1,725.000 $3,500.000 $830.000 $1,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $5,500.000 $8,050.000 $11,300.000 $20,000.000 $7,000.000
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 7.000 $6,500.000 $10,350.000 $11,000.000 $10,900.000 $9,080.000
CONDT (HDPE) (2")
LF 415.000 $15.000 $9.200 $10.000 $10.000 $48.000
CONDT (HDPE) (2") BORE
LF 1,165.000 $60.000 $23.000 $24.000 $25.000 $75.000
CONDT (RM) (2")
LF 10.000 $55.000 $28.750 $31.000 $30.000 $44.300
ELEC CONDR (NO.12) BARE
LF 1,580.000 $1.250 $1.730 $2.000 $2.000 $2.700
ELEC CONDR (NO.12) INSULATED
LF 3,160.000 $1.850 $2.010 $2.200 $2.250 $3.000
ELEC CONDR (NO.6) BARE
LF 10.000 $2.500 $4.030 $4.300 $4.000 $3.400
ELEC CONDR (NO.6) INSULATED
LF 20.000 $3.500 $4.600 $5.000 $5.000 $3.950
GROUND BOX TY A (122311)W/APRON
EA 9.000 $1,800.000 $1,840.000 $2,000.000 $2,000.000 $3,200.000
ELC SRV TY A 120/240 060(SS)SS(E)SP(O)
EA 1.000 $10,000.000 $13,800.000 $15,000.000 $15,000.000 $11,325.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 79.000 $700.000 $859.050 $1,300.000 $900.000 $747.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 13.000 $1,100.000 $1,116.650 $1,400.000 $1,180.000 $971.000
REMOVE SM RD SN SUP&AM
EA 86.000 $180.000 $125.000 $115.000 $125.000 $200.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 20.000 $32.000 $120.000 $20.000 $65.000 $25.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 119,700.000 $0.890 $0.320 $0.310 $0.350 $0.250
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 118,100.000 $0.730 $0.320 $0.310 $0.350 $0.250
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 500.000 $1.500 $5.000 $0.850 $1.000 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 5,860.000 $1.500 $3.000 $0.850 $1.000 $1.500
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 300.000 $1.500 $2.300 $2.250 $2.500 $0.760
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 2,211.000 $1.750 $1.730 $1.700 $2.000 $1.250
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,609.000 $2.000 $1.020 $1.000 $1.000 $1.250
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 59,149.000 $1.190 $0.750 $0.750 $0.750 $0.680
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 10,356.000 $1.120 $0.750 $0.750 $0.750 $0.720
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 42,126.000 $1.150 $0.750 $0.750 $0.750 $0.680
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 260.000 $20.000 $16.100 $16.000 $18.000 $16.330
PREFAB PAV MRK TY C (W) (ARROW)
EA 32.000 $300.000 $264.500 $260.000 $275.000 $225.000
PREFAB PAV MRK TY C (W) (WORD)
EA 31.000 $400.000 $368.000 $360.000 $400.000 $325.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 15.000 $52.360 $28.750 $28.000 $30.000 $50.000
REFL PAV MRKR TY I-C
EA 640.000 $3.640 $3.740 $3.700 $4.500 $5.000
REFL PAV MRKR TY II-A-A
EA 1,232.000 $4.500 $3.450 $3.400 $4.000 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 524,405.000 $1.200 $0.440 $0.400 $0.500 $0.550
ELIM EXT PAV MRK & MRKS (24")
LF 26.000 $3.500 $5.750 $5.400 $7.000 $10.000
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
EA 13.000 $15.000 $40.250 $40.000 $45.000 $20.000
BRUSH REMOVAL
MI 6.000 $5,000.000 $20,500.000 $5,000.000 $3,200.000 $10,000.000
SP MIXES SP-B SAC-B PG70-22
TON 40,699.000 $157.360 $142.000 $138.000 $134.000 $150.000
TACK COAT
GAL 16,697.000 $5.400 $4.330 $3.250 $5.000 $6.000
STONE-MTRX-ASPH SMAR-F SAC-A
TON 17,090.000 $191.230 $193.000 $235.000 $189.000 $200.000
BONDING COURSE
GAL 11,940.000 $5.460 $4.900 $3.250 $8.000 $7.000
THERMOPLASTIC PIPE (PP) (24")
LF 362.000 $225.000 $0.000 $130.000 $200.000 $0.000
THERMOPLASTIC PIPE (PP) (30")
LF 63.000 $300.000 $0.000 $152.000 $250.000 $0.000
STEEL FENCE (REMOVE)
LF 213.000 $75.000 $23.000 $14.000 $30.000 $50.000
STEEL FENCE (INSTALL)
LF 138.000 $75.000 $126.500 $100.000 $155.000 $200.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $15,000.000 $21,000.000 $15,000.000 $26,600.000 $20,000.000
TMA (STATIONARY)
DAY 690.000 $310.400 $150.000 $150.000 $275.000 $335.000
TMA (MOBILE OPERATION)
DAY 50.000 $422.420 $1,020.000 $80.000 $740.000 $950.000
1
RC PIPE (CL IV)(24 IN)
LF 362.000 $225.000 $230.000 $0.000 $0.000 $400.000
2
RC PIPE (CL IV)(30 IN)
LF 63.000 $300.000 $345.000 $0.000 $0.000 $450.000
Totals: $21,637,545.830 $19,548,504.640 $20,572,072.740 $20,671,222.550 $24,650,992.470