WINKLER SH 302 (0463-06-028)

Items: 126

County: WINKLER
Length: N/A
Highway: SH 302
District: ODESSA
Control Number: 0463-06-028
DBE Goal: N/A
Project: STP 2020(573)
Guaranty: N/A
Time: 489 WORKING DAYS
Engineer's Estimate: $59,930,087.00
Date: 02/07/2020 (6 years ago)
Contract Number: N/A
Type: ROADWAY REHABILITATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$59,930,087.00
$63,338,504.77
Over/Under Est: 5.69% $3,408,417.77
Over/Under Est: 24.14% $14,466,122.80
Amt Left: 17.46% $11,057,705.03
Over/Under Est: 42.69% $25,587,129.00
Amt Left: 35.02% $22,178,711.23
Delta: -14.95% -$11,121,006.20
$88,719,183.74
Over/Under Est: 48.04% $28,789,096.74
Amt Left: 40.07% $25,380,678.97
Delta: -3.74% -$3,201,967.74

Bid Items & Bid Tabulations

126 Total 0 of 126
WINKLER  |  SH 302  |  ODESSA  |  0463-06-028  |  02/07/2020  |  $59,930,087.00  |  STP 2020(573)  |  ROADWAY REHAB  |  489 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
FNF CONSTRUCTION, INC.
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
KIEWIT INFRASTRUCTURE SOUTH CO.
RK HALL, LLC
PREP ROW (TREE) (2" TO 12" DIA)
EA 32.000 $315.000 $1,000.000 $500.000 $1,167.810 $1,812.690
REMOVING STAB BASE AND ASPH PAV (10.5")
SY 7,682.000 $7.250 $6.400 $5.000 $4.810 $9.990
EXCAVATION (ROADWAY)
CY 217,290.000 $7.100 $10.000 $8.000 $14.500 $10.160
SUBGRADE WIDENING (ORD COMP)
STA 1,038.000 $920.000 $1,500.000 $1,160.000 $210.120 $1,750.650
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 53,975.000 $14.000 $4.000 $9.000 $8.230 $14.060
BACKFILL (TY B)
STA 1,289.000 $115.000 $51.000 $175.000 $173.290 $123.730
BLADING
HR 150.000 $325.000 $150.000 $150.000 $254.510 $167.240
PROOF ROLLING
HR 150.000 $125.000 $100.000 $100.000 $137.700 $138.640
FL BS (COMP IN PLACE)(TY A)(GR 4)(11")
SY 161,301.000 $14.500 $12.000 $14.000 $12.750 $17.730
FL BS (CMP IN PLC)(TY A GR 4)(10")
SY 27,671.000 $14.500 $10.000 $14.000 $10.850 $16.300
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 7,682.000 $1.650 $1.500 $5.000 $1.880 $2.540
PRIME COAT (AE-P)
GAL 25,836.000 $4.200 $4.300 $4.000 $4.530 $4.920
PRIME COAT (CSS-1H)
GAL 54,490.000 $3.750 $3.250 $4.000 $3.460 $3.740
PRIME COAT (MC-30)
GAL 120,426.000 $5.000 $4.700 $4.000 $4.860 $4.680
FOG SEAL (CSS-1H)
GAL 216,518.000 $2.550 $2.500 $4.000 $3.220 $3.110
ASPH (AC-20-5TR)
GAL 66,869.000 $2.920 $3.400 $5.000 $3.980 $4.250
ASPH (RC-250)
GAL 52,540.000 $4.500 $3.600 $6.000 $4.870 $5.060
AGGR(TY-B GR-4 SAC-A)
CY 957.000 $92.000 $82.000 $225.000 $107.050 $182.270
AGGR(TY-B GR-5 SAC-A)
CY 834.000 $90.000 $87.000 $225.000 $109.970 $175.270
AGGR(TY-PB GR-4 SAC-A)
CY 957.000 $130.000 $114.000 $225.000 $141.670 $199.730
AGGR(TY-PB GR-5 SAC-A)
CY 834.000 $120.000 $118.000 $225.000 $141.670 $194.260
STONE-MTRX-ASPH SMAR-F SAC-A
TON 78,804.000 $100.000 $111.000 $125.000 $162.500 $157.710
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 25,000.000 $55.000 $37.000 $50.000 $72.470 $62.850
PLANE ASPH CONC PAV (6")
SY 440,747.000 $3.750 $3.500 $3.000 $3.740 $5.150
STRUCT EXCAV
CY 314.000 $38.000 $39.000 $35.000 $7.260 $22.400
CEM STABIL BKFL
CY 1,016.000 $210.000 $188.000 $75.000 $238.040 $280.000
TRENCH EXCAVATION PROTECTION
LF 200.000 $36.750 $24.000 $1.000 $16.360 $28.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 130.000 $245.000 $280.000 $550.000 $355.410 $308.000
RIPRAP (CONC)(4 IN)
CY 5.000 $1,400.000 $2,000.000 $500.000 $703.790 $840.000
RIPRAP (CONC) (CL B) (4")
CY 16.000 $650.000 $775.000 $550.000 $762.440 $784.000
CMP (GAL STL 24 IN)
LF 52.000 $105.000 $213.000 $175.000 $105.570 $168.000
CMP (GAL STL 36 IN)
LF 34.000 $220.000 $190.000 $200.000 $129.030 $224.000
RC PIPE (CL III)(36 IN)
LF 1,197.000 $185.000 $180.000 $130.000 $269.790 $246.400
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 36.000 $1,750.000 $2,200.000 $1,600.000 $2,345.970 $1,512.000
SET (TY II) (24 IN) (CMP) (3: 1) (C)
EA 2.000 $2,900.000 $2,250.000 $1,175.000 $2,580.570 $1,568.000
SET (TY II) (24 IN) (CMP) (4: 1) (C)
EA 2.000 $2,000.000 $2,300.000 $1,295.000 $2,580.570 $1,680.000
SET (TY II) (24 IN) (CMP) (6: 1) (C)
EA 1.000 $2,200.000 $2,500.000 $1,700.000 $2,815.160 $1,792.000
SET (TY II) (36 IN) (CMP) (3: 1) (C)
EA 1.000 $3,900.000 $3,300.000 $5,000.000 $4,691.940 $3,920.000
SET (TY II) (36 IN) (CMP) (6: 1) (C)
EA 1.000 $3,900.000 $4,500.000 $3,500.000 $4,926.540 $4,368.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 3.000 $2,750.000 $5,000.000 $2,500.000 $3,284.360 $4,088.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 4.000 $6,000.000 $5,300.000 $2,750.000 $3,518.950 $4,256.000
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 5.000 $6,900.000 $6,000.000 $4,100.000 $4,457.350 $5,040.000
CLEAN EXIST CULVERTS
EA 7.000 $4,500.000 $3,500.000 $2,500.000 $2,345.970 $2,800.000
REMOV STR (PIPE)
EA 14.000 $850.000 $180.000 $500.000 $791.760 $1,120.000
MOBILIZATION
LS 1.000 $2,000,000.000 $6,300,000.000 $7,395,000.000 $7,933,416.000 $3,695,961.300
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 25.000 $20,000.000 $20,400.000 $10,000.000 $50,000.000 $36,012.890
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 4,560.000 $7.500 $10.000 $6.000 $6.070 $5.330
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,560.000 $1.250 $2.000 $1.000 $1.400 $1.640
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
LF 2,250.000 $35.000 $80.000 $47.000 $141.310 $123.200
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
LF 6,750.000 $8.250 $10.000 $5.000 $19.270 $16.800
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
LF 2,250.000 $13.000 $4.000 $7.000 $16.050 $14.000
DRIVEWAYS (ACP)
SY 14,862.000 $32.000 $57.000 $35.000 $70.410 $84.310
RUMBLE STRIPS (SHOULDER)
LF 302,503.000 $0.140 $0.170 $0.150 $0.120 $0.150
RUMBLE STRIPS (CENTERLINE)
LF 93,364.000 $0.140 $0.220 $0.150 $0.120 $0.190
MTL W-BEAM GD FEN (STEEL POST)
LF 100.000 $43.000 $46.000 $27.000 $39.380 $37.520
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,700.000 $2,000.000 $1,250.000 $1,998.420 $1,904.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 1.000 $1,850.000 $2,100.000 $825.000 $2,115.980 $2,016.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,750.000 $3,400.000 $2,750.000 $3,938.070 $3,752.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 18.000 $2,000.000 $1,000.000 $1,375.000 $2,938.860 $2,800.000
CRASH CUSH ATTEN (REMOVE)
EA 12.000 $1,850.000 $1,000.000 $875.000 $1,763.310 $1,680.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 12.000 $1,250.000 $10,000.000 $8,600.000 $9,992.110 $9,520.000
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 5.000 $4,750.000 $5,100.000 $3,750.000 $6,462.080 $5,600.000
IN RD IL (TY SA) 50T-10-10(400W EQ)LED
EA 8.000 $5,950.000 $6,200.000 $4,600.000 $7,883.740 $6,832.000
CONDT (PVC) (SCH 40) (2")
LF 1,616.000 $8.500 $6.100 $10.000 $7.750 $6.720
CONDT (PVC) (SCH 40) (2") (BORE)
LF 713.000 $25.000 $31.000 $25.000 $38.770 $33.600
ELEC CONDR (NO.4) BARE
LF 2,588.000 $2.000 $2.600 $1.500 $3.230 $2.800
ELEC CONDR (NO.4) INSULATED
LF 5,176.000 $2.000 $2.800 $1.500 $3.550 $3.080
GROUND BOX TY A (122311)W/APRON
EA 9.000 $1,650.000 $1,600.000 $882.000 $1,938.630 $1,680.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 2.000 $7,250.000 $6,400.000 $7,000.000 $8,142.240 $7,056.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 96.000 $575.000 $765.000 $500.000 $940.440 $840.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 43.000 $1,050.000 $890.000 $610.000 $1,057.990 $977.760
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 17.000 $1,150.000 $1,125.000 $750.000 $1,263.710 $1,236.480
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 12.000 $1,050.000 $1,190.000 $800.000 $1,322.490 $1,308.160
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $1,250.000 $1,220.000 $750.000 $1,322.490 $1,344.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,350.000 $1,200.000 $785.000 $1,322.490 $1,288.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $1,400.000 $1,200.000 $825.000 $1,351.870 $1,299.200
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 1.000 $1,300.000 $1,250.000 $875.000 $1,410.650 $1,360.800
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,500.000 $1,350.000 $840.000 $1,498.820 $1,488.480
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 3.000 $1,400.000 $1,250.000 $985.000 $1,410.650 $1,359.680
REMOVE SM RD SN SUP&AM
EA 169.000 $55.000 $82.000 $90.000 $117.550 $141.090
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 75.000 $110.000 $97.000 $66.000 $164.580 $106.400
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
EA 67.000 $115.000 $97.000 $110.000 $164.580 $106.400
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 43.000 $105.000 $97.000 $85.000 $164.580 $106.400
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 10.000 $185.000 $97.000 $85.000 $164.580 $106.400
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 36,033.000 $0.120 $0.180 $0.350 $0.200 $0.180
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 693,624.000 $0.110 $0.130 $0.250 $0.150 $0.130
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 649,834.000 $0.110 $0.130 $0.250 $0.150 $0.130
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 1,280.000 $3.500 $3.300 $2.650 $4.110 $3.640
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 276.000 $3.500 $3.600 $4.000 $4.430 $3.920
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 123,954.000 $1.000 $2.000 $1.150 $2.340 $3.090
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 140,522.000 $1.000 $2.000 $0.850 $2.340 $3.070
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 2,255.000 $0.600 $1.050 $1.100 $1.260 $1.120
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 503.000 $1.380 $1.600 $1.360 $1.900 $1.680
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 16,630.000 $0.750 $0.800 $1.000 $0.890 $0.780
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 11,221.000 $2.800 $1.800 $3.200 $2.220 $1.960
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 18,649.000 $0.350 $0.400 $0.380 $0.440 $0.390
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 175,068.000 $0.370 $0.400 $0.350 $0.410 $0.360
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 345,444.000 $0.300 $0.400 $0.350 $0.440 $0.390
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 202.000 $12.000 $14.250 $13.000 $17.730 $15.680
PREFAB PAV MRK TY C (W) (ARROW)
EA 52.000 $200.000 $224.000 $215.000 $278.560 $246.400
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 20.000 $650.000 $376.000 $550.000 $468.480 $414.400
PREFAB PAV MRK TY C (W) (WORD)
EA 48.000 $250.000 $264.000 $275.000 $329.190 $291.200
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 158.000 $28.000 $26.000 $40.000 $31.660 $28.000
REFL PAV MRKR TY I-C
EA 2,091.000 $3.000 $3.050 $3.500 $3.800 $3.360
REFL PAV MRKR TY II-A-A
EA 6,238.000 $2.500 $2.800 $3.000 $3.420 $3.020
REFL PAV MRKR TY II-C-R
EA 954.000 $3.400 $3.050 $3.500 $3.800 $3.360
ELIM EXT PAV MRK & MRKS (4")
LF 179,218.000 $0.450 $0.400 $0.500 $0.440 $0.390
TREE AND BRUSH REMOVAL
AC 2.500 $2,500.000 $3,800.000 $1,300.000 $11,678.120 $10,136.990
EMULSION
GAL 765,472.000 $2.300 $3.000 $3.000 $3.130 $3.130
CEMENT
TON 1,200.000 $190.000 $200.000 $185.000 $214.400 $199.780
EMUL TRTMNT (MX EXST MTRL)10"
SY 157,119.000 $3.650 $3.500 $4.000 $1.720 $2.710
EMUL TRTMNT(MX EXST MTRL & NEW BASE)10"
SY 115,287.000 $4.000 $3.500 $4.000 $1.720 $2.760
SP MIXES SP-B SAC-B PG70-22
TON 411,758.000 $75.000 $67.000 $88.000 $99.860 $109.750
TACK COAT
GAL 191,429.000 $1.450 $4.000 $4.000 $3.620 $4.900
BONDING COURSE
GAL 96,978.000 $3.000 $4.000 $4.000 $3.620 $5.790
THERMOPLASTIC PIPE (SIZE)(PP)
LF 951.000 $88.500 $51.000 $0.000 $0.000 $78.400
FILLING MILLED ASPHALT RUMBLE STRIPS
LF 96,084.000 $3.000 $1.600 $3.000 $1.100 $3.790
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $18,750.000 $25,000.000 $15,000.000 $24,247.320 $16,929.810
REFL PAV MRK AWT (W) 4" (SLD) (100MIL)
LF 83,142.000 $0.550 $0.500 $0.400 $0.610 $0.540
REFL PAV MRK AWT (W) 4" (BRK) (100MIL)
LF 16,730.000 $0.500 $0.500 $0.550 $0.610 $0.540
REFL PAV MRK AWT (W) 4" (DOT) (100MIL)
LF 330.000 $1.400 $5.100 $0.550 $6.330 $5.600
REFL PAV MRK AWT (Y) 4" (SLD) (100MIL)
LF 119,212.000 $0.450 $0.500 $0.500 $0.610 $0.540
TMSP RADAR SPEED CONTROL MONITOR
EA 4.000 $12,500.000 $8,000.000 $15,000.000 $10,510.300 $11,439.060
TMA (STATIONARY)
DAY 1,800.000 $65.000 $250.000 $250.000 $404.160 $383.140
TMA (MOBILE OPERATION)
HR 1,181.000 $85.000 $100.000 $50.000 $89.120 $495.240
1
RC PIPE (CL III)(18 IN)
LF 951.000 $88.500 $0.000 $85.000 $102.350 $0.000
Totals: $60,014,250.500 $63,338,504.770 $74,396,209.800 $85,517,216.000 $88,719,183.745