WILLIAMSON FM 619 (0986-01-046)

Items: 62

County: WILLIAMSON
Length: N/A
Highway: FM 619
District: AUSTIN
Control Number: 0986-01-046
DBE Goal: 300.0%
Project: BR 2024(598)
Guaranty: N/A
Time: 52 WORKING DAYS
Engineer's Estimate: $1,318,263.56
Date: 01/05/2024 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$1,318,263.56
$1,365,940.00
Over/Under Est: 3.62% $47,676.44
$1,750,000.00
Over/Under Est: 32.75% $431,736.44
Amt Left: 28.12% $384,060.00
Subcontractor Percentage Amount
A GREATER AUSTIN DEVELOPMENT COMPANY, LLC 28.11% $403,874.53
ENVIRONMENTAL SAFETY SERVICES, INC. 9.63% $138,360.43
LONE STAR PAVING COMPANY 8.73% $125,429.55
BUYERS BARRICADES AUSTIN, LLC 3.01% $43,246.61
TRP CONSTRUCTION GROUP, LLC 1.32% $18,965.29
STRIPE IT UP, LLC 0.00% $0.00
Total: 50.80% $729,876.41

Bid Items & Bid Tabulations

62 Total 0 of 62
WILLIAMSON  |  FM 619  |  AUSTIN  |  0986-01-046  |  01/05/2024  |  $1,318,263.56  |  BR 2024(598)  |  BRIDGE REPL  |  52 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN ENGINEERING CO., INC.
DIGG COMMERCIAL, LLC
PREPARING ROW
STA 5.000 $5,829.310 $10,000.000 $7,000.000
EXCAVATION (ROADWAY)
CY 617.000 $22.000 $30.000 $40.000
EXCAVATION (CHANNEL)
CY 100.000 $30.000 $39.000 $140.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 273.000 $17.000 $62.000 $77.000
FURNISHING AND PLACING TOPSOIL (4")
SY 450.000 $1.760 $5.000 $7.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 450.000 $0.500 $1.000 $5.000
VEGETATIVE WATERING
MG 4.000 $15.380 $600.000 $139.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 450.000 $2.000 $1.000 $7.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 258.000 $45.280 $150.000 $120.000
LIME (HYD, COM OR QK)(SLURRY)
TON 20.000 $350.000 $355.000 $262.000
LIME TRT (SUBGRADE)(8")
SY 1,010.000 $5.000 $27.000 $22.000
CEM STABIL BKFL
CY 295.000 $140.000 $104.000 $300.000
CUT & RESTORING PAV
SY 40.000 $150.000 $300.000 $1,400.000
ROCK BACKFILL
CY 140.000 $1,500.000 $84.000 $250.000
TEMPORARY SPL SHORING
SF 600.000 $20.000 $39.000 $130.000
RIPRAP (CONC)(5 IN)
CY 64.500 $559.030 $750.000 $780.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 123.000 $205.000 $50.000 $300.000
RIPRAP (MOW STRIP)(4 IN)
CY 37.000 $550.000 $800.000 $770.000
RAIL (TY T223)
LF 212.000 $131.160 $300.000 $209.000
GABION MATTRESSES (GALV) (24 IN)
SY 24.000 $160.000 $422.000 $300.000
CONC BOX CULV (6 FT X 6 FT)
LF 220.000 $800.000 $1,000.000 $1,300.000
WINGWALL (PW - 1) (HW=11 FT)
EA 1.000 $75,000.000 $100,000.000 $40,000.000
WINGWALL (PW - 1) (HW=14 FT)
EA 1.000 $200,000.000 $145,000.000 $55,000.000
REMOV STR (WINGWALL)
EA 2.000 $500.000 $4,000.000 $3,000.000
REMOV STR (BOX CULVERT)
LF 40.000 $120.870 $300.000 $280.000
REMOV STR (SMALL FENCE)
LF 50.000 $4.500 $5.000 $66.000
MOBILIZATION
LS 1.000 $90,000.000 $125,000.000 $220,485.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $12,000.000 $2,500.000 $7,798.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 80.000 $50.000 $40.000 $57.000
ROCK FILTER DAMS (REMOVE)
LF 80.000 $15.000 $5.000 $14.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 867.000 $3.840 $4.000 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 867.000 $0.920 $1.000 $1.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 4.000 $12,000.000 $6,500.000 $15,000.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 150.000 $40.000 $96.000 $82.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 150.000 $8.000 $12.000 $21.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 150.000 $12.000 $19.000 $21.000
MTL W-BEAM GD FEN (TIM POST)
LF 475.000 $27.160 $35.000 $37.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,500.000 $847.000 $1,435.000
REMOVE METAL BEAM GUARD FENCE
LF 1,000.000 $4.000 $5.000 $9.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,391.670 $4,400.000 $3,780.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $400.000 $500.000 $440.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,500.000 $1,700.000 $1,600.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,050.000 $800.000 $1,386.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL2)
EA 2.000 $10,000.000 $9,000.000 $11,000.000
WIRE FENCE (TY C)
LF 100.000 $20.000 $34.000 $36.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $700.000 $1,200.000 $810.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 10.000 $50.000 $25.000 $80.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 14.000 $25.000 $25.000 $80.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 900.000 $3.300 $3.000 $1.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 900.000 $3.300 $3.000 $90.000
REFL PAV MRK TY II (W) 6" (SLD)
LF 900.000 $0.400 $2.000 $2.000
REFL PAV MRK TY II (Y) 6" (BRK)
LF 900.000 $0.400 $2.000 $2.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 900.000 $1.000 $5.000 $2.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 900.000 $1.000 $5.000 $2.000
REFL PAV MRKR TY II-A-A
EA 9.000 $6.500 $29.000 $400.000
D-GR HMA TY-D PG76-22 (LEVEL-UP)
TON 76.000 $130.000 $800.000 $250.000
D-GR HMA TY-D PG 76-22 SAC-B (EXEMPT)
TON 176.000 $160.000 $450.000 $250.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,500.000 $2,000.000 $12,866.000
TMA (STATIONARY)
DAY 86.000 $210.000 $177.000 $600.000
TMA (MOBILE OPERATION)
HR 30.000 $120.000 $200.000 $600.000
PORTABLE ROADWAY ILLUMINATION
DAY 86.000 $400.000 $300.000 $900.000
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
EA 4.000 $1,800.000 $1,440.000 $1,700.000
Totals: $1,318,263.565 $1,365,940.000 $1,750,000.000