PREPARING ROW
|
STA
|
31.400
|
$3,000.000
|
$5,500.000
|
$780.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
4.000
|
$35.000
|
$75.000
|
$265.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-14")
|
SY
|
3,091.000
|
$8.000
|
$7.000
|
$14.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(8")
|
SY
|
89.000
|
$8.000
|
$25.000
|
$38.000
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
1,719.000
|
$5.000
|
$8.000
|
$16.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,901.000
|
$30.000
|
$13.500
|
$13.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
3,266.000
|
$40.000
|
$16.500
|
$10.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
25,836.000
|
$3.000
|
$1.000
|
$1.600
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
25,836.000
|
$0.250
|
$0.300
|
$0.400
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
12,918.000
|
$0.250
|
$0.190
|
$0.400
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
12,918.000
|
$0.250
|
$0.190
|
$0.400
|
|
|
VEGETATIVE WATERING
|
MG
|
434.000
|
$35.000
|
$10.000
|
$35.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
25,836.000
|
$1.500
|
$1.150
|
$1.500
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
43.000
|
$90.000
|
$135.000
|
$170.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
29.000
|
$250.000
|
$200.000
|
$265.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
13.000
|
$400.000
|
$425.000
|
$502.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
22.000
|
$560.000
|
$475.000
|
$586.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
75.000
|
$115.000
|
$100.000
|
$120.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
67.000
|
$150.000
|
$165.000
|
$149.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,000.000
|
$2,500.000
|
$3,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$2,500.000
|
$3,000.000
|
$3,500.000
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$650.000
|
$800.000
|
$760.000
|
|
|
REMOV STR (PIPE)
|
LF
|
48.000
|
$45.000
|
$25.000
|
$53.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$226,655.700
|
$200,000.000
|
$187,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$8,362.000
|
$17,000.000
|
$1,400.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
159.000
|
$50.000
|
$46.000
|
$52.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
159.000
|
$25.000
|
$14.000
|
$26.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
468.000
|
$50.000
|
$48.000
|
$71.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
468.000
|
$15.000
|
$15.000
|
$23.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,815.000
|
$8.000
|
$5.000
|
$5.200
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,815.000
|
$2.500
|
$1.000
|
$1.300
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
406.000
|
$6.000
|
$7.000
|
$5.800
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
20.000
|
$4.940
|
$12.000
|
$7.800
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
426.000
|
$3.000
|
$1.000
|
$1.300
|
|
|
CONSTRUCTING DETOURS
|
SY
|
2,041.000
|
$77.000
|
$68.000
|
$87.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
133.000
|
$80.000
|
$95.000
|
$106.000
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
814.000
|
$0.500
|
$10.000
|
$8.500
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
375.000
|
$20.000
|
$8.000
|
$10.700
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
70.000
|
$30.000
|
$25.000
|
$34.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
645.000
|
$30.000
|
$36.000
|
$48.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
915.000
|
$1.500
|
$1.900
|
$2.500
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,300.000
|
$1.500
|
$2.000
|
$2.700
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
180.000
|
$2.500
|
$2.000
|
$2.700
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
365.000
|
$2.500
|
$2.500
|
$3.400
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
3.000
|
$1,500.000
|
$2,000.000
|
$2,400.000
|
|
|
ELC SRV TY D 120/240 070(NS)AL(E)SP(O)
|
EA
|
1.000
|
$7,500.000
|
$10,000.000
|
$8,000.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
39.000
|
$41.130
|
$35.000
|
$39.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
19.000
|
$850.000
|
$900.000
|
$1,100.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
19.000
|
$175.000
|
$100.000
|
$115.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
4.000
|
$100.000
|
$125.000
|
$146.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
38.000
|
$4.000
|
$5.000
|
$19.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
2,252.000
|
$0.800
|
$2.450
|
$2.500
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
55.000
|
$12.000
|
$33.750
|
$30.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
2,252.000
|
$0.750
|
$2.450
|
$2.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,649.000
|
$2.000
|
$2.000
|
$1.300
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
15.000
|
$11.000
|
$33.750
|
$30.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
4.000
|
$210.000
|
$355.000
|
$302.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
4.000
|
$250.000
|
$440.000
|
$302.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
1,628.000
|
$1.500
|
$1.550
|
$0.850
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
7,236.000
|
$1.000
|
$1.550
|
$1.900
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
11,850.000
|
$0.800
|
$1.550
|
$1.900
|
|
REFL PAV MRKR TY I-C
|
EA
|
83.000
|
$4.000
|
$10.000
|
$7.400
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
675.000
|
$4.000
|
$5.000
|
$7.400
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,767.000
|
$0.300
|
$4.000
|
$2.100
|
|
|
INSTALL HWY TRF SIG (FLASH BEACON)
|
EA
|
1.000
|
$2,700.000
|
$3,500.000
|
$3,400.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
8.000
|
$300.000
|
$300.000
|
$400.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
6.000
|
$300.000
|
$300.000
|
$400.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(16 CONDR)
|
LF
|
6.000
|
$90.000
|
$6.000
|
$8.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
758.000
|
$2.000
|
$3.000
|
$4.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
5.000
|
$9,000.000
|
$12,500.000
|
$13,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
1.000
|
$15,500.000
|
$16,000.000
|
$19,000.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(65-44')LUM
|
EA
|
1.000
|
$41,000.000
|
$45,000.000
|
$51,000.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
3,215.000
|
$105.000
|
$100.000
|
$121.000
|
|
|
D-GR HMA TY-D PG76-22
|
TON
|
1,095.000
|
$250.000
|
$145.000
|
$184.000
|
|
|
TOM-C PG76-22 SAC-B
|
TON
|
877.000
|
$142.000
|
$185.000
|
$233.000
|
|
|
BONDING COURSE
|
GAL
|
1,666.000
|
$4.000
|
$3.600
|
$5.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
42.000
|
$88.900
|
$150.000
|
$59.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$8,000.000
|
$8,000.000
|
$8,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
105.000
|
$250.000
|
$175.000
|
$175.000
|
|
|
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
|
EA
|
2.000
|
$1,500.000
|
$750.000
|
$1,200.000
|
|
Totals: |
$2,192,363.570
|
$2,006,827.140
|
$2,031,430.300
|