WILLIAMSON CR (0914-05-204)

Items: 68

County: WILLIAMSON
Length: N/A
Highway: CR
District: AUSTIN
Control Number: 0914-05-204
DBE Goal: N/A
Project: BR 2020(733)
Guaranty: N/A
Time: 244 WORKING DAYS
Engineer's Estimate: $2,298,371.82
Date: 06/27/2023 (2 years ago)
Contract Number: N/A
Type: CONSTRUCT NEW ROAD
Mail/Deliver Bids To: N/A
JASON HUDSON
JOHN PETERS
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$2,298,371.82
1
$2,578,218.99
Over/Under Est: 12.18% $279,847.17
Over/Under Est: 16.41% $377,251.10
Amt Left: 3.78% $97,403.93
Over/Under Est: 28.42% $653,197.72
Amt Left: 14.48% $373,350.55
Delta: -10.31% -$275,946.62
Over/Under Est: 36.14% $830,528.14
Amt Left: 21.36% $550,680.97
Delta: -6.01% -$177,330.42
Subcontractor Percentage Amount
TEXAS MATERIALS GROUP, INC. 5.87% $151,341.45
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. 5.13% $132,262.63
WYLIE DRILLING & DRAINAGE, INC. 1.97% $50,790.91
DIIBS SPECIALISTS, LLC 0.89% $22,946.15
D. I. J. CONSTRUCTION, INC. 0.83% $21,399.22
MURRAY CONSTRUCTION 0.44% $11,344.16
GK CONSTRUCTION, LLC 0.14% $3,609.51
Total: 15.27% $393,694.03

Bid Items & Bid Tabulations

68 Total 0 of 68
WILLIAMSON  |  CR  |  AUSTIN  |  0914-05-204  |  06/27/2023  |  $2,298,371.82  |  BR 2020(733)  |  CONSTRUCT NEW ROAD  |  244 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RELMCO, INC.
CAPITAL EXCAVATION COMPANY
AUSTIN ENGINEERING CO., INC.
JAMES CONSTRUCTION GROUP, LLC
PREPARING ROW
STA 28.700 $3,000.000 $2,500.000 $870.000 $1,343.000 $1,428.980
REMOVING CONC (RIPRAP)
CY 2.000 $77.000 $500.000 $650.000 $3,637.000 $94.690
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 4,935.000 $6.630 $3.500 $9.400 $2.500 $12.550
OBLITERATING ABANDONED ROAD
SY 1,989.000 $4.780 $3.500 $7.100 $6.000 $14.380
EXCAVATION (ROADWAY)
CY 3,900.000 $10.080 $10.000 $15.000 $9.000 $17.450
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 4,602.000 $4.250 $12.000 $30.000 $16.000 $18.620
FURNISHING AND PLACING TOPSOIL (4")
SY 14,713.000 $1.970 $3.000 $3.500 $1.500 $0.310
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 14,713.000 $0.280 $0.410 $0.600 $0.450 $0.660
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 14,713.000 $0.320 $0.400 $0.550 $0.450 $0.660
VEGETATIVE WATERING
MG 24.800 $34.360 $100.000 $34.900 $656.000 $49.280
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 14,713.000 $1.100 $2.000 $2.150 $1.350 $2.760
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 4,785.000 $46.580 $52.000 $50.000 $75.000 $70.390
LIME TRT (EXST MATL)(10")
SY 9,951.000 $7.750 $3.000 $6.400 $11.000 $7.340
LIME (HYD, COM OR QK)(SLURRY)
TON 224.000 $290.800 $350.000 $310.000 $338.000 $409.250
PRIME COAT (MULTI OPTION)
GAL 1,544.000 $6.570 $4.500 $6.350 $6.000 $8.810
CEM STABIL BKFL
CY 141.000 $125.840 $165.000 $183.000 $136.000 $257.350
TRENCH EXCAVATION PROTECTION
LF 32.000 $6.900 $40.000 $55.100 $122.000 $190.000
DRILL SHAFT (36 IN)
LF 261.000 $435.340 $260.000 $260.000 $372.000 $360.020
CL C CONC (ABUT)
CY 47.400 $1,216.170 $1,029.000 $1,220.000 $1,156.000 $1,381.660
CL C CONC (CAP)
CY 32.000 $2,275.650 $1,402.800 $1,660.000 $1,364.000 $1,661.280
CL C CONC (COLUMN)
CY 5.600 $2,406.050 $3,500.000 $4,070.000 $2,372.000 $5,443.830
REINF CONC SLAB
SF 9,000.000 $20.000 $24.000 $28.000 $33.500 $40.290
APPROACH SLAB
CY 67.000 $600.000 $685.000 $710.000 $895.000 $813.780
PRESTR CONC GIRDER (TX40)
LF 1,236.700 $150.760 $195.000 $165.000 $258.000 $247.950
RIPRAP (STONE PROTECTION)(12 IN)
CY 798.000 $115.000 $160.000 $165.000 $236.000 $159.780
RIPRAP (MOW STRIP)(4 IN)
CY 23.300 $505.170 $475.000 $870.000 $687.000 $793.160
RAIL (TY T223)
LF 540.000 $149.560 $75.000 $168.000 $191.000 $114.560
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 73.000 $225.000 $100.000 $260.000 $305.000 $318.750
RC PIPE (CL III)(18 IN)
LF 192.000 $70.130 $95.200 $75.100 $95.000 $156.030
RC PIPE (CL III)(24 IN)
LF 125.000 $90.490 $126.000 $119.000 $131.000 $181.830
SET (TY I)(S=12 FT)(HW=6FT)(4:1)(C)
EA 1.000 $18,000.000 $27,468.000 $19,000.000 $31,188.000 $35,147.650
SET (TY I)(S=12 FT)(HW=7FT)(4:1)(C)
EA 1.000 $20,000.000 $33,068.000 $24,900.000 $52,221.000 $36,506.540
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 10.000 $1,369.830 $2,086.000 $2,110.000 $3,690.000 $1,737.720
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $2,104.720 $2,366.000 $2,370.000 $4,264.000 $2,053.970
REMOV STR (WINGWALL)
EA 2.000 $3,436.020 $950.000 $5,500.000 $8,720.000 $2,007.640
REMOV STR (PIPE)
LF 89.000 $21.700 $20.000 $16.250 $54.000 $25.690
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $18,332.670 $35,000.000 $16,400.000 $30,000.000 $22,054.670
MOBILIZATION
LS 1.000 $208,942.890 $255,000.000 $235,000.000 $112,000.000 $181,703.020
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $5,000.000 $5,500.000 $2,800.000 $1,553.000 $4,928.680
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 226.000 $34.670 $39.990 $40.550 $46.000 $65.680
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 348.000 $93.090 $96.800 $91.900 $110.000 $102.160
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 320.000 $34.100 $51.390 $81.100 $59.000 $94.860
ROCK FILTER DAMS (REMOVE)
LF 1,120.000 $16.110 $26.040 $35.100 $29.000 $21.890
TEMP SEDMT CONT FENCE (INSTALL)
LF 445.000 $3.840 $387.000 $4.050 $6.000 $8.760
TEMP SEDMT CONT FENCE (REMOVE)
LF 445.000 $0.400 $0.530 $0.550 $0.600 $2.920
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 100.000 $4.680 $3.920 $8.100 $4.000 $13.140
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $4.080 $0.810 $4.850 $1.000 $1.470
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
LF 226.000 $42.500 $80.620 $81.100 $158.000 $110.150
DRIVEWAYS (ACP)
SY 903.000 $93.060 $50.000 $110.000 $85.000 $124.250
TURNOUTS (ACP)
SY 66.000 $150.000 $50.000 $117.000 $85.000 $203.610
MTL W-BEAM GD FEN (TIM POST)
LF 175.000 $27.300 $23.130 $27.850 $32.000 $44.140
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,224.330 $2,042.500 $2,130.000 $2,400.000 $2,869.180
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,824.510 $3,063.750 $3,670.000 $4,126.000 $3,457.720
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 4.000 $330.000 $376.250 $370.000 $1,338.000 $514.980
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 5.000 $568.240 $806.250 $790.000 $945.000 $1,103.530
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $659.670 $913.750 $900.000 $945.000 $1,240.540
REMOVE SM RD SN SUP&AM
EA 14.000 $104.630 $107.500 $105.000 $243.000 $145.950
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $25.400 $26.870 $26.350 $17.000 $36.490
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $64.000 $69.870 $68.500 $63.000 $94.870
REMOVE DELIN & OBJECT MARKER ASSMS
EA 6.000 $11.760 $21.500 $21.100 $15.000 $29.190
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 13.000 $29.000 $25.800 $36.900 $52.130 $51.080
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 26.000 $16.090 $33.000 $27.000 $36.000 $36.490
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 5,660.000 $0.610 $1.620 $1.900 $1.800 $2.570
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 5,478.000 $0.600 $1.620 $1.900 $1.800 $2.570
REFL PAV MRKR TY II-A-A
EA 67.000 $3.910 $33.000 $27.000 $36.000 $36.490
D-GR HMA TY-D PG 76-22 SAC-B (EXEMPT)
TON 925.000 $159.040 $120.000 $185.000 $225.000 $257.010
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $12,000.000 $14,500.000 $10,400.000 $9,000.000 $2,614.870
DEAD END ROADWAY BARRICADE
LF 20.000 $70.310 $165.000 $158.000 $250.000 $218.920
Totals: $2,298,371.819 $2,578,218.990 $2,675,622.920 $2,951,569.540 $3,128,899.995