Show Job Controls
Bid Cobra

WILLACY FM 490 (1430-01-031)

Items: 96

County: WILLACY
Length: N/A
Highway: FM 490
District: PHARR
Control Number: 1430-01-031
DBE Goal: N/A
Project: STP 2B23(003)VRU
Guaranty: N/A
Time: 136 WORKING DAYS
Engineer's Estimate: $10,477,790.96
Date: 06/28/2023 (2 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD SHOULDERS
Mail/Deliver Bids To: N/A
ANDRES ESPINOZA
GABRIEL VILLARREAL
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$10,477,790.96
$5,944,074.30
Over/Under Est: -43.27% -$4,533,716.66
Over/Under Est: -24.37% -$2,553,041.56
Amt Left: 33.32% $1,980,675.10
$9,650,102.80
Over/Under Est: -7.9% -$827,688.16
Amt Left: 62.35% $3,706,028.50
Delta: -21.77% -$1,725,353.40
$10,200,565.09
Over/Under Est: -2.65% -$277,225.87
Amt Left: 71.61% $4,256,490.79
Delta: -5.70% -$550,462.29
Subcontractor Percentage Amount
SOIL TECH ADVANCE INC. 4.63% $276,010.70
DEPENDABLE FENCE 3.33% $198,513.10
HIGHWAY BARRICADES AND SERVICES, LLC 1.31% $78,093.74
TEXAS ICON CONSTRUCTION, LLC 0.87% $51,863.78
TEXAS HIGHWAY SYSTEMS, INC. 0.59% $35,171.99
RIO GRANDE REBAR RODBUSTERS, LLC 0.22% $13,114.98
HOUSTON SAWING & DRILLING 0.10% $5,961.35
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. 0.02% $1,192.27
Total: 11.07% $659,921.91

Bid Items & Bid Tabulations

96 Total 0 of 96
WILLACY  |  FM 490  |  PHARR  |  1430-01-031  |  06/28/2023  |  $10,477,790.96  |  STP 2B23(003)VRU  |  WIDEN ROAD - ADD SHOULDERS  |  136 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOREMOST PAVING, INC.
TEXAS CORDIA CONSTRUCTION, LLC
ASAGO, LLC
IOC COMPANY, LLC
PREPARING ROW
STA 170.250 $4,500.000 $800.000 $750.000 $5,000.000 $3,500.000
REMOVING CONC (DRIVEWAYS)
SY 98.000 $21.000 $20.000 $10.000 $100.000 $30.000
REMOVING STAB BASE AND ASPH PAV (0-4")
SY 1,086.000 $10.000 $2.000 $6.000 $3.000 $20.000
REMOVING STAB BASE & ASPH PAV (0-6")
SY 44,890.000 $20.000 $2.000 $5.000 $4.000 $8.000
REMOVING STAB BASE AND ASPH PAV (2"-8")
SY 1,933.000 $25.000 $2.000 $7.000 $5.000 $20.000
OBLITERATING ABANDONED ROAD
STA 21.000 $2,270.000 $250.000 $3,000.000 $3,000.000 $1,500.000
EXCAVATION (ROADWAY)
CY 29,255.000 $12.000 $4.000 $6.000 $8.000 $15.000
EXCAVATION (CHANNEL)
CY 232.000 $45.000 $12.000 $10.000 $25.000 $40.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 5,296.000 $15.000 $10.000 $5.000 $12.000 $7.000
FURNISHING AND PLACING TOPSOIL (4")
SY 100,754.000 $5.500 $2.050 $2.000 $3.000 $0.710
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 98,432.000 $1.200 $0.500 $0.500 $0.750 $0.500
CELL FBR MLCH SEED(TEMP)(WARM)
SY 98,432.000 $1.600 $0.450 $0.500 $0.750 $0.450
VEGETATIVE WATERING
MG 1,637.000 $40.000 $30.000 $55.000 $20.000 $50.000
PROOF ROLLING
HR 8.000 $50.000 $80.000 $66.000 $50.000 $100.000
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
CY 18,842.000 $40.000 $29.000 $40.000 $45.000 $63.000
LIME (HYDRATED LIME (SLURRY))
TON 1,131.000 $355.000 $236.000 $300.000 $330.000 $250.000
LIME TRT (EXST MATL) (12")
SY 64,040.000 $4.400 $2.600 $3.000 $5.000 $3.000
CEMENT
TON 688.000 $270.000 $190.000 $185.000 $230.000 $185.000
CEMENT TREAT (NEW BASE) (10")
SY 67,501.000 $2.800 $3.450 $3.000 $4.000 $3.250
PRIME COAT (MC-30)
GAL 13,252.000 $10.000 $4.750 $7.000 $6.000 $6.000
ASPH (TIER II)
GAL 19,479.000 $11.000 $6.500 $6.000 $6.000 $6.000
AGGR (TY-B GR-4P SAC-B)
CY 571.000 $70.000 $70.000 $149.000 $120.000 $175.000
STRUCT EXCAV (BOX)
CY 116.000 $11.000 $5.000 $66.000 $90.000 $125.000
CEM STABIL BKFL
CY 249.000 $120.000 $90.000 $64.000 $90.000 $125.000
STRUCT EXCAV (SPECIAL)
CY 59.000 $56.000 $70.000 $60.000 $90.000 $125.000
TRENCH EXCAVATION PROTECTION
LF 515.000 $10.000 $0.100 $9.000 $5.000 $5.000
TEMPORARY SPL SHORING
SF 6,350.000 $30.000 $0.100 $72.000 $25.000 $50.000
DRILL SHAFT (24 IN)
LF 1,250.000 $315.000 $280.000 $441.000 $500.000 $350.000
CL C CONC (ABUT)
CY 64.400 $1,500.000 $1,600.000 $1,019.000 $2,000.000 $2,300.000
CL C CONC (CAP)
CY 46.800 $2,000.000 $2,000.000 $2,742.000 $2,000.000 $2,900.000
CL C CONC (COLUMN)
CY 22.000 $2,450.000 $3,000.000 $2,704.000 $2,000.000 $2,900.000
REINF CONC SLAB (SLAB BEAM)
SF 8,970.000 $33.000 $18.000 $45.000 $45.000 $60.000
PRESTR CONC SLAB BEAM (5SB12)
LF 1,727.680 $400.000 $200.000 $315.000 $500.000 $475.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 140.000 $230.000 $275.000 $188.000 $300.000 $275.000
RIPRAP (MOW STRIP)(4 IN)
CY 107.000 $600.000 $400.000 $774.000 $600.000 $750.000
RAIL (TY SSTR)
LF 438.000 $170.000 $120.000 $196.000 $200.000 $350.000
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 186.000 $175.000 $175.000 $163.000 $210.000 $200.000
CONC BOX CULV (5 FT X 2 FT)
LF 68.000 $528.000 $400.000 $709.000 $500.000 $650.000
RC PIPE (CL III)(18 IN)
LF 432.000 $100.000 $65.000 $71.000 $60.000 $113.000
RC PIPE (CL III)(24 IN)
LF 805.000 $120.000 $85.000 $86.000 $85.000 $130.000
RC PIPE (CL III)(36 IN)
LF 102.000 $190.000 $160.000 $234.000 $160.000 $330.000
WINGWALL (PW - 1) (HW=3 FT)
EA 2.000 $12,500.000 $9,000.000 $12,940.000 $20,000.000 $29,750.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 2.000 $1,447.000 $1,000.000 $1,285.000 $1,400.000 $1,900.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 4.000 $1,450.000 $1,000.000 $1,345.000 $1,500.000 $1,900.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 23.000 $1,450.000 $1,150.000 $1,509.000 $1,600.000 $1,900.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 10.000 $1,942.000 $1,300.000 $1,896.000 $1,800.000 $2,100.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $2,100.000 $1,300.000 $1,561.000 $1,900.000 $2,200.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $2,100.000 $1,650.000 $1,680.000 $2,000.000 $2,500.000
REMOV STR (SET)
EA 12.000 $400.000 $300.000 $400.000 $175.000 $775.000
REMOV STR (PIPE)
LF 1,380.000 $15.000 $10.000 $10.000 $7.000 $15.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $48,000.000 $50,000.000 $50,000.000 $20,000.000 $100.000
MOBILIZATION
LS 1.000 $950,026.450 $500,000.000 $700,000.000 $1,000,000.000 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $6,875.000 $5,300.000 $8,500.000 $8,000.000 $4,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $35.000 $30.000 $20.000 $50.000 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $12.000 $12.000 $8.000 $10.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 34,185.000 $5.000 $4.250 $4.000 $6.000 $4.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 34,185.000 $2.000 $1.400 $1.000 $1.000 $1.250
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 771.000 $6.000 $6.000 $6.000 $6.000 $6.150
BIODEG EROSN CONT LOGS (REMOVE)
LF 771.000 $2.500 $1.500 $1.000 $1.000 $1.350
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 1.000 $5,680.000 $7,400.000 $42,400.000 $20,000.000 $15,000.000
DRIVEWAYS (CONC)
SY 98.000 $90.000 $97.000 $100.000 $90.000 $200.000
DRIVEWAYS (ACP)
SY 1,222.000 $83.000 $38.000 $38.000 $60.000 $55.000
DRIVEWAYS (BASE)
SY 1,299.000 $70.000 $18.000 $9.000 $30.000 $15.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,075.000 $90.000 $35.000 $35.000 $40.000 $34.600
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,300.000 $2,500.000 $2,440.000 $3,000.000 $2,440.000
REMOVE METAL BEAM GUARD FENCE
LF 962.000 $4.000 $4.000 $4.000 $3.000 $3.500
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $250.000 $250.000 $250.000 $1,000.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,300.000 $3,450.000 $3,440.000 $4,000.000 $3,440.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $320.000 $250.000 $250.000 $1,000.000 $250.000
CRASH CUSHION ATTEN (INSTALL) (QUAD)(N)
EA 4.000 $25,000.000 $32,000.000 $26,100.000 $25,000.000 $26,100.000
RELOCATE EXISTING MAILBOX
EA 5.000 $300.000 $500.000 $453.000 $100.000 $500.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 14.000 $800.000 $950.000 $629.000 $700.000 $950.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 6.000 $850.000 $1,350.000 $1,278.000 $800.000 $1,350.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 7.000 $1,125.000 $1,350.000 $1,327.000 $1,000.000 $1,350.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,200.000 $500.000 $1,579.000 $1,300.000 $500.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 33.000 $120.000 $125.000 $119.000 $75.000 $250.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 14.000 $32.000 $20.000 $28.000 $100.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 21.000 $30.000 $30.000 $52.000 $1,000.000 $30.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 285.000 $4.000 $5.000 $4.000 $0.500 $3.800
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 4,785.000 $1.000 $0.700 $0.500 $0.500 $0.700
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 36.000 $10.000 $11.000 $13.000 $8.000 $12.800
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 11,400.000 $1.000 $0.700 $0.500 $0.500 $0.650
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 58.000 $7.800 $11.000 $13.000 $6.500 $12.800
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 12,995.000 $1.000 $0.750 $0.500 $1.000 $0.650
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 9,577.000 $0.920 $0.750 $0.500 $1.000 $0.650
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 34,220.000 $1.180 $0.800 $1.000 $1.200 $0.950
PREFAB PAV MRK TY C (W) (ARROW)
EA 1.000 $240.000 $200.000 $291.000 $400.000 $280.000
REFL PAV MRKR TY II-A-A
EA 287.000 $6.910 $5.000 $4.000 $4.000 $3.400
TRAFFIC BUTTON TY Y
EA 2,303.000 $2.400 $3.500 $2.000 $1.200 $2.200
TRAFFIC BUTTON TY B
EA 3,536.000 $2.400 $3.500 $2.000 $1.200 $2.200
REPLACE OF SPAN CABLE ASSM
LF 150.000 $5.000 $4.000 $7.000 $100.000 $100.000
PRSSR IRRIG PVC PIPE (18")
LF 335.000 $159.000 $250.000 $102.000 $90.000 $190.000
PRSSR IRRIG PVC PIPE (24")
LF 102.000 $237.000 $480.000 $151.000 $110.000 $290.000
SP MIXES SP-D SAC-A PG76-22
TON 5,685.000 $135.000 $113.000 $125.000 $130.000 $190.000
TACK COAT
GAL 244.000 $4.000 $5.000 $8.000 $6.000 $9.500
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $80.000 $390.000 $75.000 $250.000 $500.000
Totals: $10,477,790.960 $5,944,074.300 $7,924,749.400 $9,650,102.800 $10,200,565.090