WILLACY FM 490 (0860-02-015)

Items: 104

County: WILLACY
Length: N/A
Highway: FM 490
District: PHARR
Control Number: 0860-02-015
DBE Goal: 650.0%
Project: STP 2B24(196)HES
Guaranty: N/A
Time: 187 WORKING DAYS
Engineer's Estimate: $5,823,682.33
Date: 06/05/2024 (2 years ago)
Contract Number: N/A
Type: CONSTRUCT 4' SHOULDERS
Mail/Deliver Bids To: N/A
ANDRES ESPINOZA
GABRIEL VILLARREAL
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$5,823,682.33
$5,494,396.77
Over/Under Est: -5.65% -$329,285.56
$5,710,275.77
Over/Under Est: -1.95% -$113,406.56
Amt Left: 3.93% $215,879.00
Over/Under Est: -1.79% -$104,501.33
Amt Left: 4.09% $224,784.23
Delta: -0.16% -$8,905.23
Subcontractor Percentage Amount
TEXAS ICON CONSTRUCTION, LLC 5.18% $284,609.75
HIGHWAY BARRICADES AND SERVICES, LLC 4.80% $263,731.04
*AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. 0.88% $48,350.69
TEXAS HIGHWAY SYSTEMS, INC. 0.88% $48,350.69
Total: 11.74% $645,042.17

Bid Items & Bid Tabulations

104 Total 0 of 104
WILLACY  |  FM 490  |  PHARR  |  0860-02-015  |  06/05/2024  |  $5,823,682.33  |  STP 2B24(196)HES  |  CONSTRUCT 4' SHOULDERS  |  187 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOREMOST PAVING, INC.
ASAGO, LLC
TEXAS CORDIA CONSTRUCTION, LLC
PREPARING ROW
STA 147.000 $1,200.000 $3,000.000 $2,000.000 $2,000.000
REMOVING CONC (DRIVEWAYS)
SY 97.000 $23.000 $35.000 $20.000 $22.000
REMOVING STAB BASE AND ASPH PAV (0-4")
SY 1,746.000 $3.000 $6.500 $7.000 $14.000
REMOV STAB BASE AND ASPH PAV (10"-18")
SY 41,500.000 $8.730 $7.750 $7.000 $7.000
EXCAVATION (ROADWAY)
CY 18,273.000 $6.000 $3.750 $6.000 $8.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 2,375.000 $14.000 $25.000 $12.000 $6.000
BACKFILL (TY B)
STA 147.000 $270.000 $225.000 $250.000 $400.000
FURNISHING AND PLACING TOPSOIL (4")
SY 80,521.000 $3.000 $3.000 $1.250 $3.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 80,521.000 $0.400 $0.450 $0.450 $0.500
CELL FBR MLCH SEED(TEMP)(WARM)
SY 80,521.000 $0.400 $0.300 $0.300 $0.500
VEGETATIVE WATERING
MG 1,314.000 $40.000 $67.000 $10.000 $25.000
PROOF ROLLING
HR 8.000 $60.000 $85.000 $200.000 $65.000
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
CY 17,173.000 $38.000 $26.000 $35.000 $50.000
LIME (HYDRATED LIME (SLURRY))
TON 1,195.000 $273.000 $250.000 $335.000 $350.000
LIME TRT (EXST MATL) (12")
SY 45,098.000 $2.570 $3.900 $5.000 $3.000
CEMENT
TON 624.000 $380.000 $195.000 $210.000 $250.000
CEMENT TREAT (NEW BASE) (10")
SY 5,011.000 $3.450 $10.900 $4.500 $3.000
CEMENT TREAT(NEW BASE)(15")
SY 11,153.000 $5.000 $10.900 $5.000 $4.000
PRIME COAT (MC-30)
GAL 10,712.000 $6.500 $5.000 $6.000 $6.000
ASPH (TIER II)
GAL 16,075.000 $6.500 $9.500 $6.000 $5.000
AGGR (TY-B GR-4P SAC-B)
CY 448.000 $177.000 $75.000 $140.000 $220.000
CEM STABIL BKFL
CY 170.000 $123.250 $100.000 $70.000 $97.000
CUT & RESTORE ASPH PAVING
SY 78.000 $102.020 $100.000 $125.000 $240.000
STRUCT EXCAV (SPECIAL)
CY 77.000 $76.000 $70.000 $125.000 $120.000
TRENCH EXCAVATION PROTECTION
LF 514.000 $10.000 $0.100 $2.000 $12.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 30.000 $435.000 $295.000 $410.000 $310.000
RC PIPE (CL III)(18 IN)(SPL)
LF 247.000 $76.350 $155.000 $100.000 $100.000
RC PIPE (CL III)(24 IN)(SPL)
LF 194.000 $95.000 $180.000 $120.000 $130.000
RC PIPE (CL III)(30 IN)(SPL)
LF 173.000 $140.000 $300.000 $170.000 $300.000
SET (TY II) (12 IN) (RCP) (6: 1) (P)
EA 4.000 $900.000 $1,200.000 $2,000.000 $1,160.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 14.000 $1,120.000 $1,100.000 $1,700.000 $1,080.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 34.000 $1,230.000 $1,200.000 $1,500.000 $1,300.000
SET (TY II) (21 IN) (RCP) (6: 1) (P)
EA 2.000 $1,250.000 $180.000 $2,300.000 $1,220.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 8.000 $1,700.000 $1,700.000 $3,500.000 $1,550.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 12.000 $1,900.000 $1,800.000 $2,000.000 $1,550.000
CLEAN EXIST CULVERTS
EA 34.000 $3,000.000 $1,400.000 $1,500.000 $1,100.000
REMOV STR (SET)
EA 9.000 $470.000 $440.000 $250.000 $390.000
REMOV STR (WINGWALL)
EA 4.000 $2,000.000 $440.000 $2,000.000 $1,510.000
REMOV STR (PIPE)
LF 606.000 $14.000 $15.000 $10.000 $11.000
MOBILIZATION
LS 1.000 $550,789.300 $450,000.000 $570,000.000 $350,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $6,000.000 $7,500.000 $15,000.000 $6,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 30,792.000 $5.000 $3.100 $4.500 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 30,792.000 $1.460 $1.500 $1.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 997.000 $7.000 $6.000 $8.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 997.000 $3.000 $1.800 $1.500 $2.000
CONSTRUCTING DETOURS
SY 7,425.000 $45.000 $50.000 $50.000 $34.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 16.000 $7,000.000 $1.000 $7,500.000 $20,670.000
DRIVEWAYS (CONC)
SY 95.000 $156.000 $100.000 $100.000 $110.000
DRIVEWAYS (ACP)
SY 1,965.000 $65.000 $40.000 $50.000 $34.000
DRIVEWAYS (BASE)
SY 2,467.000 $44.000 $20.000 $25.000 $9.000
RELOCATE EXISTING MAILBOX
EA 4.000 $560.000 $650.000 $320.000 $1,000.000
ELEC CONDR (NO.8) BARE
LF 225.000 $1.500 $2.000 $2.040 $2.000
ELEC CONDR (NO.6) INSULATED
LF 225.000 $2.110 $2.500 $2.550 $3.000
TRAY CABLE (4 CONDR) (12 AWG)
LF 189.000 $2.780 $2.700 $2.750 $3.000
ZINC-COAT STL WIRE STRAND (3/8")
LF 80.000 $3.000 $2.500 $2.550 $3.000
ELC SRV TY T 120/240 000(NS)GS(L)TS(O)
EA 1.000 $2,695.000 $2,250.000 $2,295.000 $2,420.000
ALUMINUM SIGNS (TY A)
SF 42.000 $33.000 $25.000 $16.320 $20.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 29.000 $885.000 $850.000 $800.700 $890.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 17.000 $775.000 $1,100.000 $867.000 $1,080.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 11.000 $775.000 $1,200.000 $856.800 $1,060.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $875.000 $1,500.000 $943.500 $1,220.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 2.000 $1,200.000 $1,550.000 $969.000 $1,870.000
REMOVE SM RD SN SUP&AM
EA 58.000 $120.000 $75.000 $45.000 $150.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 25.000 $20.000 $25.000 $25.000 $24.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 27.000 $107.000 $65.000 $100.000 $78.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 1,179.000 $5.000 $0.950 $0.970 $1.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 31,404.000 $0.460 $0.330 $0.330 $0.500
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 482.000 $9.000 $12.000 $12.240 $12.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 46,780.000 $0.460 $0.330 $0.330 $0.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 258.000 $1.200 $0.900 $0.900 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 235.000 $10.000 $16.000 $16.320 $16.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 403.000 $5.000 $3.000 $3.060 $3.000
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 17,370.000 $0.950 $0.900 $0.880 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 13,804.000 $1.000 $0.900 $0.880 $1.000
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 41,845.000 $1.000 $1.100 $1.120 $1.000
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
LF 6,690.000 $1.000 $1.500 $1.430 $1.000
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 1,488.000 $0.760 $1.500 $1.430 $1.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $250.000 $200.000 $204.000 $200.000
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $350.000 $300.000 $306.000 $300.000
REFL PAV MRKR TY I-C
EA 13.000 $5.000 $5.000 $5.100 $5.000
REFL PAV MRKR TY II-A-A
EA 806.000 $5.000 $5.000 $5.100 $5.000
TRAFFIC BUTTON TY Y
EA 1,843.000 $2.160 $5.000 $5.100 $5.000
TRAFFIC BUTTON TY B
EA 5,438.000 $2.400 $5.000 $5.100 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 32,100.000 $0.500 $0.350 $0.360 $0.500
ELIM EXT PAV MRK & MRKS (6")
LF 38,707.000 $1.070 $0.500 $0.510 $0.500
ELIM EXT PAV MRK & MRKS (8")
LF 79.000 $1.210 $0.600 $0.610 $0.500
ELIM EXT PAV MRK & MRKS (12")
LF 400.000 $2.140 $0.850 $0.870 $1.000
ELIM EXT PAV MRK & MRKS (24")
LF 301.000 $5.780 $3.000 $3.060 $3.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 2.000 $150.000 $100.000 $102.000 $100.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 2.000 $150.000 $100.000 $102.000 $100.000
INSTALL HWY TRF SIG (FLASH BEACON)
EA 1.000 $2,657.000 $2,500.000 $2,550.000 $2,690.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $7,972.000 $2,350.000 $2,397.000 $2,530.000
VEH SIG SEC (12")LED(RED)
EA 8.000 $279.000 $250.000 $255.000 $270.000
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 139.000 $2.740 $3.000 $2.860 $3.000
INS TRF SIG PL AM (S)STR(TY D)LUM
EA 2.000 $10,184.000 $12,350.000 $12,597.000 $13,270.000
INSTALL OF SPAN CABLE ASSM
LF 140.000 $6.950 $1.500 $1.480 $2.000
PRSSR IRRIG PVC PIPE (18")
LF 81.000 $197.000 $340.000 $130.000 $97.000
PRSSR IRRIG PVC PIPE (24")
LF 173.000 $347.000 $450.000 $150.000 $130.000
PRSSR IRRIG PVC PIPE (12")
LF 175.000 $70.000 $290.000 $100.000 $63.000
PRSSR IRRIGATION PVC PIPE (15")
LF 85.000 $120.000 $370.000 $125.000 $76.000
SP MIXES SP-D SAC-A PG76-22
TON 5,277.000 $130.000 $130.000 $127.000 $130.000
TACK COAT
GAL 722.000 $5.000 $3.000 $7.000 $8.000
TMA (STATIONARY)
DAY 374.000 $150.000 $30.000 $10.000 $25.000
DRIVEWAY ASSISTANCE DEVICE(DAD) SYSTEM
MO 16.000 $3,500.000 $1.000 $10,000.000 $2,390.000
Totals: $5,823,682.330 $5,494,396.770 $5,710,275.770 $5,719,181.000