Show Job Controls
Bid Cobra

WILBARGER US 70 (0147-01-022)

Items: 40

County: WILBARGER
Length: N/A
Highway: US 70
District: WICHITA FALLS
Control Number: 0147-01-022
DBE Goal: N/A
Project: STP 2020(453)
Guaranty: N/A
Time: 46 WORKING DAYS
Engineer's Estimate: $3,238,824.26
Date: 01/09/2020 (6 years ago)
Contract Number: N/A
Type: PAVEMENT REPAIR AND OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$3,238,824.26
$3,558,575.17
Over/Under Est: 9.87% $319,750.91
$3,581,651.05
Over/Under Est: 10.58% $342,826.79
Amt Left: 0.65% $23,075.88
$4,412,725.04
Over/Under Est: 36.24% $1,173,900.78
Amt Left: 24% $854,149.87
Delta: -23.20% -$831,073.99
$4,413,684.38
Over/Under Est: 36.27% $1,174,860.12
Amt Left: 24.03% $855,109.21
Delta: -0.02% -$959.34

Bid Items & Bid Tabulations

40 Total 0 of 40
WILBARGER  |  US 70  |  WICHITA FALLS  |  0147-01-022  |  01/09/2020  |  $3,238,824.26  |  STP 2020(453)  |  PAVMT REPAIR AND OVERLAY  |  46 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DUININCK, INC.
ZACK BURKETT CO.
GILVIN-TERRILL, LTD.
A. L. HELMCAMP, INC.
REMOVING STAB BASE AND ASPH PAV (10")
SY 188.000 $10.000 $30.000 $29.500 $100.000 $28.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 11.000 $45.000 $43.500 $30.000 $150.000 $58.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 38.000 $45.000 $43.500 $35.000 $150.000 $58.000
BACKFILL (TY A OR B)
STA 310.000 $295.000 $290.000 $350.000 $325.000 $330.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 68,044.000 $0.150 $0.090 $0.090 $0.150 $0.080
BROADCAST SEED (TEMP) (WARM)
SY 34,022.000 $0.100 $0.100 $0.110 $0.150 $0.090
BROADCAST SEED (TEMP) (COOL)
SY 34,022.000 $0.100 $0.100 $0.110 $0.150 $0.090
VEGETATIVE WATERING
MG 560.000 $30.000 $25.000 $15.000 $100.000 $26.000
EMULS ASPH (EROSN CONT)(SS-1)
GAL 13,721.000 $3.200 $3.500 $3.500 $4.000 $4.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 5,988.000 $55.000 $86.000 $75.000 $98.000 $117.000
FLEX PAVEMENT STRUCTURE REPAIR (2"-6")
SY 112.000 $35.000 $91.500 $50.000 $100.000 $240.000
PLANE ASPH CONC PAV(0" TO 2")
SY 2,014.000 $4.000 $5.350 $4.000 $8.000 $6.000
CONC PVMT (CONT REINF - CRCP) (10")
SY 188.000 $225.000 $175.000 $206.500 $300.000 $230.000
FULL-DEPTH REPAIR CRCP (5"-9")
SY 388.000 $225.000 $500.000 $490.000 $300.000 $480.000
RIPRAP (MOW STRIP)(4 IN)
CY 19.000 $450.000 $655.000 $826.000 $1,500.000 $650.000
MOBILIZATION
LS 1.000 $292,802.210 $200,000.000 $300,000.000 $440,000.000 $360,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $6,000.000 $30,000.000 $3,982.500 $20,000.000 $10,000.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 385.000 $3.150 $4.300 $4.750 $6.000 $4.200
BIODEG EROSN CONT LOGS (REMOVE)
LF 385.000 $1.000 $1.100 $1.200 $1.000 $1.100
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 2,340.000 $35.000 $45.000 $17.300 $30.000 $40.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 61,238.000 $0.150 $0.130 $0.140 $0.250 $0.170
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 30,619.000 $0.150 $0.160 $0.180 $0.400 $0.170
MTL W-BEAM GD FEN (TIM POST)
LF 175.000 $24.000 $26.500 $32.000 $24.500 $26.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,150.000 $2,100.000 $2,625.500 $1,950.000 $2,100.000
REMOVE METAL BEAM GUARD FENCE
LF 175.000 $2.500 $3.250 $4.750 $3.000 $3.500
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,600.000 $3,300.000 $3,835.000 $3,000.000 $3,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $300.000 $380.000 $472.000 $350.000 $370.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 13,002.000 $0.200 $0.230 $0.590 $0.380 $0.280
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 1,428.000 $0.300 $0.330 $0.890 $0.380 $0.360
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 4,788.000 $0.200 $0.270 $0.890 $0.380 $0.280
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,312.000 $1.000 $1.100 $1.000 $1.000 $0.750
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 61,238.000 $0.300 $0.330 $0.530 $0.430 $0.440
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 7,201.000 $0.450 $0.390 $0.530 $0.430 $0.470
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 9,671.000 $0.300 $0.390 $0.530 $0.430 $0.440
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 96.000 $15.000 $14.000 $20.060 $25.000 $21.000
REFL PAV MRKR TY II-A-A
EA 481.000 $4.000 $3.250 $4.130 $3.350 $5.500
SP MIXES SP-C SAC-A PG70-28
TON 21,896.000 $95.000 $95.500 $100.000 $118.000 $120.000
TACK COAT
GAL 10,841.000 $3.500 $3.150 $3.500 $5.750 $3.000
TMA (STATIONARY)
DAY 44.000 $200.000 $350.000 $200.000 $550.000 $350.000
TMA (MOBILE OPERATION)
DAY 5.000 $250.000 $980.000 $250.000 $950.000 $90.000
Totals: $3,238,824.260 $3,558,575.170 $3,581,651.050 $4,412,725.040 $4,413,684.380