Show Job Controls
Bid Cobra

WILBARGER US 283 (0124-02-033)

Items: 44

County: WILBARGER
Length: N/A
Highway: US 283
District: WICHITA FALLS
Control Number: 0124-02-033
DBE Goal: N/A
Project: F 2023(092)
Guaranty: N/A
Time: 61 WORKING DAYS
Engineer's Estimate: $5,902,435.65
Date: 09/07/2022 (3 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
CALLAN COLTHARP
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$5,902,435.65
$6,216,761.98
Over/Under Est: 5.33% $314,326.33
$6,808,812.01
Over/Under Est: 15.36% $906,376.36
Amt Left: 9.52% $592,050.03
$7,171,332.89
Over/Under Est: 21.5% $1,268,897.24
Amt Left: 15.35% $954,570.91
Delta: -5.32% -$362,520.88
$7,403,557.90
Over/Under Est: 25.43% $1,501,122.25
Amt Left: 19.09% $1,186,795.92
Delta: -3.24% -$232,225.01

Bid Items & Bid Tabulations

44 Total 0 of 44
WILBARGER  |  US 283  |  WICHITA FALLS  |  0124-02-033  |  09/07/2022  |  $5,902,435.65  |  F 2023(092)  |  RESURF ROADWAY  |  61 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ZACK BURKETT CO.
DUININCK, INC.
JCCC, INC.
A. L. HELMCAMP, INC.
REMOVING CONCRETE(MOW STRIP)
LF 300.000 $10.000 $25.000 $8.400 $7.850 $22.000
BACKFILL (TY B)
STA 536.000 $160.000 $144.000 $305.000 $213.330 $120.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 24.500 $600.000 $643.500 $575.000 $549.000 $560.000
VEGETATIVE WATERING
MG 996.000 $25.000 $35.000 $37.000 $31.500 $10.000
EMULS ASPH (EROSN CONT)(SS-1)
GAL 29,962.000 $3.000 $3.950 $4.050 $3.410 $4.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 14,000.000 $50.000 $48.500 $49.920 $53.120 $58.000
FLEX PAVEMENT STRUCTURE REPAIR (2.5")
SY 1,010.000 $30.000 $50.000 $62.500 $40.690 $35.000
PLAN & TEXT CONC PAV(0" TO 2")
SY 2,266.000 $3.000 $3.000 $9.200 $3.980 $5.000
RIPRAP (MOW STRIP)(4 IN)
CY 20.000 $700.000 $877.500 $890.000 $750.000 $800.000
MOBILIZATION
LS 1.000 $557,441.000 $300,000.000 $510,000.000 $687,828.190 $540,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $7,000.000 $26,000.000 $51,000.000 $5,810.070 $20,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 500.000 $4.000 $4.680 $4.500 $4.300 $4.300
BIODEG EROSN CONT LOGS (REMOVE)
LF 500.000 $1.000 $0.880 $1.050 $1.000 $0.800
DRIVEWAYS (ACP)
SY 1,806.000 $50.000 $24.000 $41.500 $24.780 $24.000
RUMBLE STRIPS (SHOULDER)
LF 99,340.000 $0.150 $0.180 $0.100 $0.140 $0.180
RUMBLE STRIPS (CENTERLINE)
LF 57,680.000 $0.180 $0.220 $0.200 $0.200 $0.180
MTL W-BEAM GD FEN (TIM POST)
LF 150.000 $35.000 $37.440 $33.500 $32.000 $35.000
MTL THRIE-BEAM GD FEN (TIM POST)
EA 2.000 $2,500.000 $3,012.750 $3,300.000 $2,575.000 $3,000.000
REMOVE METAL BEAM GUARD FENCE
LF 150.000 $4.000 $4.100 $10.500 $3.500 $11.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $400.000 $409.500 $315.000 $350.000 $320.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $4,000.000 $4,416.750 $4,400.000 $3,775.000 $4,400.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $500.000 $409.500 $315.000 $350.000 $320.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 3.000 $600.000 $936.000 $785.000 $800.000 $800.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 10.000 $500.000 $789.750 $785.000 $675.000 $800.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 6.000 $40.000 $40.950 $68.000 $35.000 $69.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 9,700.000 $0.750 $1.000 $1.150 $0.650 $0.650
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 1,716.000 $2.000 $1.990 $1.750 $1.000 $1.100
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 400.000 $1.000 $1.170 $1.550 $1.000 $1.100
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 1,620.000 $6.000 $9.360 $7.800 $8.000 $8.500
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 11,630.000 $0.500 $0.590 $0.530 $0.470 $0.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 105,605.000 $0.350 $0.590 $0.460 $0.440 $0.460
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 105,790.000 $0.400 $0.590 $0.460 $0.440 $0.460
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 154.000 $15.000 $19.310 $17.000 $17.500 $18.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 12.000 $2,500.000 $813.150 $525.000 $625.000 $650.000
REFL PAV MRKR TY II-A-A
EA 1,514.000 $3.500 $5.850 $5.250 $3.500 $3.700
TRAFFIC BUTTON TY I-C
EA 586.000 $4.500 $5.850 $5.250 $4.000 $4.300
ELIM EXT PAV MRK & MRKS (4")
LF 13,230.000 $0.500 $0.590 $0.940 $0.690 $1.100
ELIM EXT PAV MRK & MRKS (24")
LF 2,160.000 $3.000 $3.510 $0.940 $1.980 $3.200
ELIM EXT PAV MRK & MRKS (ARROW)
EA 12.000 $80.000 $52.650 $57.500 $283.890 $78.000
D-GR HMA TY-D PG70-28
TON 6,256.000 $95.000 $112.250 $120.000 $124.020 $140.000
STONE-MTRX-ASPH SMA-D PG76-22
TON 27,858.000 $120.000 $132.500 $136.170 $152.620 $160.000
BONDING COURSE
GAL 18,679.000 $3.500 $5.100 $3.850 $4.540 $3.600
TMA (STATIONARY)
DAY 48.000 $500.000 $100.000 $260.000 $159.880 $220.000
TMA (MOBILE OPERATION)
DAY 30.000 $500.000 $1.000 $945.000 $386.590 $300.000
Totals: $5,902,435.650 $6,216,761.980 $6,808,812.010 $7,171,332.890 $7,403,557.900