WILBARGER US 287 (0043-07-111)

Items: 24

County: WILBARGER
Length: N/A
Highway: US 287
District: WICHITA FALLS
Control Number: 0043-07-111
DBE Goal: N/A
Project: STP 1802(315)HES
Guaranty: N/A
Time: 68 WORKING DAYS
Engineer's Estimate: $528,706.00
Date: 07/10/2018 (7 years ago)
Contract Number: N/A
Type: IMPROVE GUARDRAIL TO DESIGN STANDARDS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$528,706.00
1
$524,560.00
Over/Under Est: -0.78% -$4,146.00
$560,477.00
Over/Under Est: 6.01% $31,771.00
Amt Left: 6.85% $35,917.00
Over/Under Est: 30.6% $161,759.00
Amt Left: 31.63% $165,905.00
Delta: -23.19% -$129,988.00
$1,041,925.00
Over/Under Est: 97.07% $513,219.00
Amt Left: 98.63% $517,365.00
Delta: -50.90% -$351,460.00

Bid Items & Bid Tabulations

24 Total 0 of 24
WILBARGER  |  US 287  |  WICHITA FALLS  |  0043-07-111  |  07/10/2018  |  $528,706.00  |  STP 1802(315)HES  |  IMPROVE GUARDRAIL TO DESIGN STANDARD...  |  68 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
IIPL USA LLC
HJC FARMS, INC.
FNH CONSTRUCTION, LLC
GILVIN-TERRILL, LTD.
REMOVING CONC (RIPRAP)
SY 1,341.000 $25.000 $25.000 $10.000 $20.000 $30.000
REMOVING STAB BASE AND ASPH PAV (4")
SY 295.000 $5.000 $18.000 $10.000 $20.000 $30.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 196.000 $25.000 $30.000 $30.000 $30.000 $50.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 1,860.000 $1.250 $1.000 $0.200 $1.500 $2.000
VEGETATIVE WATERING
MG 31.200 $15.000 $100.000 $50.000 $250.000 $430.000
CL C CONC (RAIL FOUNDATION)
CY 5.600 $1,200.000 $1,000.000 $1,000.000 $2,000.000 $3,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 286.000 $500.000 $400.000 $650.000 $525.000 $1,500.000
RAIL (TY T221)
LF 40.000 $50.000 $300.000 $250.000 $185.000 $600.000
MOBILIZATION
LS 1.000 $46,973.000 $50,000.000 $20,000.000 $65,000.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $3,000.000 $5,000.000 $2,000.000 $8,500.000 $9,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 5,500.000 $20.000 $20.000 $22.600 $22.500 $20.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 22.000 $1,800.000 $1,600.000 $2,100.000 $1,850.000 $2,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 11.000 $1,000.000 $1,200.000 $1,050.000 $1,500.000 $1,200.000
MTL BM GD FEN TRANS (NON - SYM)
EA 3.000 $700.000 $1,200.000 $1,050.000 $1,500.000 $1,200.000
REMOVE METAL BEAM GUARD FENCE
LF 5,525.000 $2.000 $1.000 $2.000 $3.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 11.000 $250.000 $200.000 $200.000 $500.000 $500.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $1,100.000 $200.000 $200.000 $1,500.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 29.000 $2,400.000 $2,500.000 $2,775.000 $2,500.000 $2,750.000
GUARDRAIL END TREATMENT (REMOVE)
EA 29.000 $200.000 $200.000 $200.000 $1,250.000 $500.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 61.000 $28.000 $10.000 $20.000 $100.000 $12.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 61.000 $28.000 $10.000 $20.000 $100.000 $12.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 83.000 $28.000 $15.000 $30.000 $100.000 $15.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 85.000 $28.000 $15.000 $30.000 $100.000 $15.000
TMA (STATIONARY)
DAY 65.000 $100.000 $300.000 $200.000 $250.000 $1,000.000
Totals: $528,706.000 $524,560.000 $560,477.000 $690,465.000 $1,041,925.000