REMOVING CONC (RIPRAP)
|
SY
|
35.000
|
$75.000
|
$38.500
|
$20.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
1,344.000
|
$75.000
|
$46.200
|
$20.000
|
|
|
REMOVE CONC (ABUTMENT BACKWALL)
|
CY
|
3.000
|
$1,200.000
|
$1,650.000
|
$20.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
13.000
|
$100.000
|
$38.500
|
$20.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
124.930
|
$25.000
|
$137.500
|
$25.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
319.440
|
$0.500
|
$25.800
|
$3.000
|
|
|
BROADCAST SEED (PERM) (URBAN) (CLAY)
|
SY
|
2,021.120
|
$0.500
|
$5.610
|
$3.000
|
|
|
VEGETATIVE WATERING
|
MG
|
19.660
|
$22.000
|
$75.000
|
$300.000
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
585.140
|
$4.000
|
$50.000
|
$15.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
5,940.000
|
$6.000
|
$10.880
|
$15.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
23.000
|
$165.000
|
$352.000
|
$350.000
|
|
|
CL C CONC (ABUT)
|
CY
|
3.000
|
$1,300.000
|
$4,246.000
|
$750.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
1,950.100
|
$60.000
|
$29.150
|
$30.000
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
2,250.000
|
$250.000
|
$78.000
|
$325.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
30.000
|
$120.000
|
$390.000
|
$325.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
345.000
|
$250.000
|
$291.000
|
$250.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
4.000
|
$650.000
|
$797.500
|
$700.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
8.300
|
$800.000
|
$825.000
|
$700.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
230.800
|
$650.000
|
$825.000
|
$600.000
|
|
|
ELASTOMERIC BEARING (SPECIAL)
|
EA
|
10.000
|
$2,500.000
|
$1,270.000
|
$1,500.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
146.000
|
$40.000
|
$25.000
|
$50.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL5)
|
LF
|
1,248.000
|
$50.000
|
$49.000
|
$50.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
551.000
|
$45.000
|
$75.000
|
$50.000
|
|
|
REINFORCED CONCRETE OVERLAY (4.5 IN)
|
SY
|
2,520.000
|
$200.000
|
$157.000
|
$125.000
|
|
|
MULTI-LAYER POLYMER OVERLAY
|
SY
|
4,540.000
|
$50.000
|
$47.000
|
$75.000
|
|
|
STR STEEL (PEDESTAL)
|
LB
|
1,670.000
|
$35.000
|
$25.000
|
$40.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
1,802.000
|
$250.000
|
$211.200
|
$200.000
|
|
|
HYDRO-DEMOLITION (2 1/2 IN)
|
SY
|
2,520.000
|
$10.000
|
$132.000
|
$50.000
|
|
|
SHOT BLASTING
|
SY
|
4,540.000
|
$10.000
|
$9.750
|
$8.000
|
|
|
RAISING EXIST STRUCT
|
LS
|
1.000
|
$90,000.000
|
$65,000.000
|
$125,000.000
|
|
|
ADJUST STL SHOES
|
EA
|
30.000
|
$6,000.000
|
$5,050.000
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$437,576.000
|
$541,000.000
|
$420,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$10,000.000
|
$30,900.000
|
$3,500.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
4,213.000
|
$8.000
|
$5.940
|
$15.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
4,213.000
|
$1.200
|
$2.750
|
$4.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,955.000
|
$85.000
|
$70.000
|
$100.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
2,275.000
|
$20.000
|
$45.000
|
$25.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
1,955.000
|
$15.000
|
$28.000
|
$25.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,467.000
|
$30.000
|
$25.030
|
$35.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$2,500.000
|
$1,787.500
|
$3,000.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
6.000
|
$1,400.000
|
$1,430.000
|
$3,000.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
8.000
|
$1,120.000
|
$880.000
|
$3,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,240.000
|
$3.500
|
$2.200
|
$6.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$300.000
|
$165.000
|
$750.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
1.000
|
$225.000
|
$165.000
|
$750.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
9.000
|
$3,400.000
|
$3,300.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
10.000
|
$350.000
|
$220.000
|
$750.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
6.000
|
$1,800.000
|
$2,200.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$2,000.000
|
$1,650.000
|
$750.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$15,000.000
|
$8,800.000
|
$13,000.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
1.000
|
$2,000.000
|
$5,500.000
|
$300.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
6.000
|
$3,000.000
|
$5,500.000
|
$300.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
24.000
|
$40.000
|
$22.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
24.000
|
$40.000
|
$22.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
46.000
|
$45.000
|
$27.500
|
$50.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
34.000
|
$45.000
|
$27.500
|
$50.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
1,908.000
|
$1.500
|
$6.600
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
1,890.000
|
$1.500
|
$6.600
|
$3.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
147.000
|
$1.100
|
$5.000
|
$4.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,080.000
|
$1.200
|
$1.650
|
$4.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
14,947.000
|
$0.500
|
$0.330
|
$4.000
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
5,167.000
|
$0.500
|
$0.330
|
$4.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
1,380.000
|
$1.000
|
$1.100
|
$4.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
5,474.000
|
$0.750
|
$1.100
|
$4.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
5,517.000
|
$0.750
|
$1.100
|
$4.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
58.000
|
$4.000
|
$11.000
|
$15.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
30,360.000
|
$0.500
|
$2.200
|
$4.000
|
|
|
CONCRETE RAIL REPAIR (IN-KIND)
|
LF
|
270.000
|
$275.000
|
$150.000
|
$200.000
|
|
|
BRIDGE JOINT REPAIR (ARMOR)
|
LF
|
754.000
|
$350.000
|
$425.000
|
$500.000
|
|
|
BRIDGE JOINT REPLACEMENT (HEADER)
|
LF
|
156.000
|
$175.000
|
$340.000
|
$150.000
|
|
|
STEEL BRIDGE ZONE PAINTING REF STR #1
|
EA
|
1.000
|
$100,000.000
|
$38,461.500
|
$50,000.000
|
|
|
STEEL BRIDGE ZONE PAINTING REF STR #2
|
EA
|
1.000
|
$100,000.000
|
$50,101.700
|
$60,000.000
|
|
|
STEEL BRIDGE ZONE PAINTING REF STR #3
|
EA
|
1.000
|
$90,000.000
|
$38,298.700
|
$50,000.000
|
|
|
STEEL BRIDGE ZONE PAINTING REF STR #4
|
EA
|
1.000
|
$90,000.000
|
$40,738.500
|
$50,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
56.000
|
$115.000
|
$125.000
|
$100.000
|
|
|
TMA (STATIONARY)
|
DAY
|
62.000
|
$225.000
|
$500.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
6.000
|
$300.000
|
$800.000
|
$250.000
|
|
|
BRIDGE SUBSTRUCTURE CLEANING (ABUT)
|
EA
|
12.000
|
$1,500.000
|
$1,450.000
|
$1,000.000
|
|
Totals: |
$4,733,705.160
|
$4,708,397.625
|
$4,838,117.030
|