WILBARGER US 70 (0043-06-098)

Items: 78

County: WILBARGER
Length: N/A
Highway: US 70
District: WICHITA FALLS
Control Number: 0043-06-098
DBE Goal: 0.0%
Project: BR 2B24(022)
Guaranty: N/A
Time: 170 WORKING DAYS
Engineer's Estimate: $4,733,705.16
Date: 05/03/2024 (2 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
CALLAN COLTHARP
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$4,733,705.16
$4,708,397.61
Over/Under Est: -0.53% -$25,307.55
Over/Under Est: 2.21% $104,411.87
Amt Left: 2.76% $129,719.42
Subcontractor Percentage Amount
JR WEST TEXAS CONCRETE LLC 15.04% $712,742.82
IBCTX, LLC 6.89% $326,515.83
S & S BRIDGE PAINTING, INC. 3.32% $157,334.19
MORRIS COUNTY CONTRACTORS, L.L.C. 3.26% $154,490.80
TRP CONSTRUCTION GROUP, LLC 2.60% $123,213.52
DUSTROL, INC. 1.80% $85,301.67
HYDRO TECHNOLOGIES, INC. 1.77% $83,879.97
KING GEORGE TRAFFIC SOLUTIONS LLC 1.16% $54,972.19
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.68% $32,225.07
SYNERGY SIGNS & SERVICES LLC 0.54% $25,590.50
LANCO TURF & SEEDING, INC. 0.40% $18,955.93
SOUTHEAST GRINDING AND GROOVING LLC 0.25% $11,847.45
NELSON INDUSTRIAL SERVICES, INC. 0.18% $8,530.17
Total: 37.89% $1,795,600.11

Bid Items & Bid Tabulations

78 Total 0 of 78
WILBARGER  |  US 70  |  WICHITA FALLS  |  0043-06-098  |  05/03/2024  |  $4,733,705.16  |  BR 2B24(022)  |  BRIDGE MAINT  |  170 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GIBSON & ASSOCIATES, INC.
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
REMOVING CONC (RIPRAP)
SY 35.000 $75.000 $38.500 $20.000
REMOVING CONC (MISC)
SY 1,344.000 $75.000 $46.200 $20.000
REMOVE CONC (ABUTMENT BACKWALL)
CY 3.000 $1,200.000 $1,650.000 $20.000
REMOVING CONC (FLUME)
SY 13.000 $100.000 $38.500 $20.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 124.930 $25.000 $137.500 $25.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 319.440 $0.500 $25.800 $3.000
BROADCAST SEED (PERM) (URBAN) (CLAY)
SY 2,021.120 $0.500 $5.610 $3.000
VEGETATIVE WATERING
MG 19.660 $22.000 $75.000 $300.000
EMULS ASPH (EROSN CONT)(MULTI)
GAL 585.140 $4.000 $50.000 $15.000
PLANE ASPH CONC PAV(0" TO 2")
SY 5,940.000 $6.000 $10.880 $15.000
FLOWABLE BACKFILL
CY 23.000 $165.000 $352.000 $350.000
CL C CONC (ABUT)
CY 3.000 $1,300.000 $4,246.000 $750.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 1,950.100 $60.000 $29.150 $30.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 2,250.000 $250.000 $78.000 $325.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 30.000 $120.000 $390.000 $325.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 345.000 $250.000 $291.000 $250.000
RIPRAP (CONC)(4 IN)
CY 4.000 $650.000 $797.500 $700.000
RIPRAP (CONC)(FLUME)
CY 8.300 $800.000 $825.000 $700.000
RIPRAP (MOW STRIP)(4 IN)
CY 230.800 $650.000 $825.000 $600.000
ELASTOMERIC BEARING (SPECIAL)
EA 10.000 $2,500.000 $1,270.000 $1,500.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 146.000 $40.000 $25.000 $50.000
CLEANING AND SEALING EXIST JOINTS(CL5)
LF 1,248.000 $50.000 $49.000 $50.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 551.000 $45.000 $75.000 $50.000
REINFORCED CONCRETE OVERLAY (4.5 IN)
SY 2,520.000 $200.000 $157.000 $125.000
MULTI-LAYER POLYMER OVERLAY
SY 4,540.000 $50.000 $47.000 $75.000
STR STEEL (PEDESTAL)
LB 1,670.000 $35.000 $25.000 $40.000
RETROFIT RAIL (TY SSTR)
LF 1,802.000 $250.000 $211.200 $200.000
HYDRO-DEMOLITION (2 1/2 IN)
SY 2,520.000 $10.000 $132.000 $50.000
SHOT BLASTING
SY 4,540.000 $10.000 $9.750 $8.000
RAISING EXIST STRUCT
LS 1.000 $90,000.000 $65,000.000 $125,000.000
ADJUST STL SHOES
EA 30.000 $6,000.000 $5,050.000 $1,000.000
MOBILIZATION
LS 1.000 $437,576.000 $541,000.000 $420,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $10,000.000 $30,900.000 $3,500.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 4,213.000 $8.000 $5.940 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,213.000 $1.200 $2.750 $4.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 1,955.000 $85.000 $70.000 $100.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 2,275.000 $20.000 $45.000 $25.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 1,955.000 $15.000 $28.000 $25.000
MTL W-BEAM GD FEN (TIM POST)
LF 3,467.000 $30.000 $25.030 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $2,500.000 $1,787.500 $3,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 6.000 $1,400.000 $1,430.000 $3,000.000
MTL BM GD FEN TRANS (NON - SYM)
EA 8.000 $1,120.000 $880.000 $3,000.000
REMOVE METAL BEAM GUARD FENCE
LF 3,240.000 $3.500 $2.200 $6.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $300.000 $165.000 $750.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $225.000 $165.000 $750.000
GUARDRAIL END TREATMENT (INSTALL)
EA 9.000 $3,400.000 $3,300.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 10.000 $350.000 $220.000 $750.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $1,800.000 $2,200.000 $2,000.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $2,000.000 $1,650.000 $750.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $15,000.000 $8,800.000 $13,000.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 1.000 $2,000.000 $5,500.000 $300.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 6.000 $3,000.000 $5,500.000 $300.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 24.000 $40.000 $22.000 $50.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 24.000 $40.000 $22.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 46.000 $45.000 $27.500 $50.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 34.000 $45.000 $27.500 $50.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 1,908.000 $1.500 $6.600 $3.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 1,890.000 $1.500 $6.600 $3.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 147.000 $1.100 $5.000 $4.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,080.000 $1.200 $1.650 $4.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 14,947.000 $0.500 $0.330 $4.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 5,167.000 $0.500 $0.330 $4.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 1,380.000 $1.000 $1.100 $4.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 5,474.000 $0.750 $1.100 $4.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 5,517.000 $0.750 $1.100 $4.000
REFL PAV MRKR TY I-C
EA 58.000 $4.000 $11.000 $15.000
ELIM EXT PAV MRK & MRKS (4")
LF 30,360.000 $0.500 $2.200 $4.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 270.000 $275.000 $150.000 $200.000
BRIDGE JOINT REPAIR (ARMOR)
LF 754.000 $350.000 $425.000 $500.000
BRIDGE JOINT REPLACEMENT (HEADER)
LF 156.000 $175.000 $340.000 $150.000
STEEL BRIDGE ZONE PAINTING REF STR #1
EA 1.000 $100,000.000 $38,461.500 $50,000.000
STEEL BRIDGE ZONE PAINTING REF STR #2
EA 1.000 $100,000.000 $50,101.700 $60,000.000
STEEL BRIDGE ZONE PAINTING REF STR #3
EA 1.000 $90,000.000 $38,298.700 $50,000.000
STEEL BRIDGE ZONE PAINTING REF STR #4
EA 1.000 $90,000.000 $40,738.500 $50,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 56.000 $115.000 $125.000 $100.000
TMA (STATIONARY)
DAY 62.000 $225.000 $500.000 $250.000
TMA (MOBILE OPERATION)
DAY 6.000 $300.000 $800.000 $250.000
BRIDGE SUBSTRUCTURE CLEANING (ABUT)
EA 12.000 $1,500.000 $1,450.000 $1,000.000
Totals: $4,733,705.160 $4,708,397.625 $4,838,117.030