WILBARGER US 70 (0043-06-088)

Items: 45

County: WILBARGER
Length: N/A
Highway: US 70
District: WICHITA FALLS
Control Number: 0043-06-088
DBE Goal: N/A
Project: NH 2018(823)
Guaranty: N/A
Time: 102 WORKING DAYS
Engineer's Estimate: $1,703,073.01
Date: 05/01/2018 (8 years ago)
Contract Number: N/A
Type: MILL HOT MIX ON BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,703,073.01
$1,693,704.50
Over/Under Est: -0.55% -$9,368.51
$1,864,296.40
Over/Under Est: 9.47% $161,223.39
Amt Left: 10.07% $170,591.90
$1,949,722.50
Over/Under Est: 14.48% $246,649.49
Amt Left: 15.12% $256,018.00
Delta: -4.58% -$85,426.10
Over/Under Est: 15.94% $271,525.74
Amt Left: 16.58% $280,894.25
Delta: -1.28% -$24,876.25
$2,007,555.50
Over/Under Est: 17.88% $304,482.49
Amt Left: 18.53% $313,851.00
Delta: -1.67% -$32,956.75

Bid Items & Bid Tabulations

45 Total 0 of 45
WILBARGER  |  US 70  |  WICHITA FALLS  |  0043-06-088  |  05/01/2018  |  $1,703,073.01  |  NH 2018(823)  |  MILL HOT MIX ON BRIDGE AND APPROACHE...  |  102 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SILVER CREEK CONSTRUCTION, INC.
EARTH BUILDERS, L.P.
GILVIN-TERRILL, LTD.
SCR CIVIL CONSTRUCTION, LLC
A. L. HELMCAMP, INC.
EXCAVATION (ROADWAY)
CY 106.000 $15.000 $30.000 $50.000 $200.000 $65.000 $22.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 973.000 $0.500 $1.500 $3.000 $2.000 $1.650 $5.000
VEGETATIVE WATERING
MG 79.000 $30.000 $50.000 $80.000 $33.000 $73.000 $40.000
D-GR HMA(SQ) TY-D PG76-22
TON 1,439.000 $150.000 $110.000 $130.000 $189.000 $205.000 $175.000
PLAN & TEXT ASPH CONC PAV(0" TO 4")
SY 467.000 $5.000 $9.000 $10.000 $4.000 $17.900 $14.000
PLAN & TEXT ASPH CONC PAV(0" TO 6")
SY 6,167.000 $6.000 $9.000 $7.000 $5.000 $9.000 $8.000
PLANE ASPH CONC PAV (0" TO 9")
SY 6,405.000 $10.000 $10.000 $7.000 $5.000 $10.050 $9.000
CL C CONC (RAIL FOUNDATION)
CY 48.870 $600.000 $1,200.000 $500.000 $675.000 $4,950.000 $600.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 20.000 $150.000 $150.000 $200.000 $700.000 $200.000 $350.000
RIPRAP (MOW STRIP)(4 IN)
CY 112.000 $550.000 $350.000 $500.000 $515.000 $900.000 $500.000
RETROFIT RAIL (TY SSTR)
LF 2,098.000 $150.000 $150.000 $260.000 $154.000 $178.000 $170.000
MOBILIZATION
LS 1.000 $137,575.510 $163,000.000 $170,000.000 $190,000.000 $197,000.000 $190,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $6,000.000 $7,500.000 $3,000.000 $25,000.000 $10,800.000 $14,000.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 200.000 $5.000 $4.000 $6.000 $4.000 $4.200 $10.000
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
LF 1,550.000 $70.000 $35.000 $38.000 $57.000 $30.000 $100.000
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
LF 1,550.000 $10.000 $14.000 $12.000 $3.000 $9.000 $10.000
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
LF 1,550.000 $20.000 $10.000 $10.000 $5.000 $22.000 $28.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,925.000 $20.000 $23.000 $21.000 $20.000 $22.350 $23.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $1,575.000 $1,400.000 $1,480.000 $1,765.000 $2,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,200.000 $1,275.000 $800.000 $980.000 $1,100.000 $1,000.000
MTL BM GD FEN TRANS (NON - SYM)
EA 2.000 $900.000 $775.000 $500.000 $550.000 $615.000 $1,000.000
REMOVE METAL BEAM GUARD FENCE
LF 2,000.000 $20.000 $4.000 $2.500 $2.000 $2.000 $4.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $400.000 $110.000 $150.000 $175.000 $200.000 $350.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,450.000 $2,225.000 $2,400.000 $2,100.000 $2,350.000 $2,900.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $250.000 $250.000 $250.000 $200.000 $225.000 $350.000
CRASH CUSH ATTEN (INSTL)
EA 2.000 $10,000.000 $8,000.000 $9,000.000 $13,100.000 $9,000.000 $11,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,500.000 $1,000.000 $3,000.000 $1,500.000 $2,000.000 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,500.000 $1,000.000 $2,000.000 $3,000.000 $2,000.000 $1,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 10.000 $40.000 $28.000 $10.000 $25.000 $25.000 $25.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 10.000 $40.000 $28.000 $10.000 $25.000 $25.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 12.000 $40.000 $42.000 $25.000 $25.000 $30.000 $45.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 7.000 $40.000 $42.000 $25.000 $30.000 $30.000 $45.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 9,830.000 $1.750 $1.000 $1.200 $3.000 $3.350 $1.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 5,110.000 $1.750 $1.000 $1.200 $3.000 $3.350 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 228.000 $1.000 $2.500 $2.300 $1.500 $2.000 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 189.000 $1.000 $2.500 $3.000 $3.250 $2.800 $3.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 1,250.000 $0.500 $1.000 $1.000 $2.000 $1.400 $1.100
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 3,040.000 $0.500 $1.000 $1.000 $2.000 $1.400 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 3,040.000 $0.500 $1.000 $1.000 $2.000 $1.400 $1.000
REFL PAV MRKR TY II-C-R
EA 63.000 $5.000 $6.500 $8.000 $5.000 $5.600 $7.500
ELIM EXT PAV MRK & MRKS (4")
LF 1,250.000 $1.000 $2.000 $2.500 $3.000 $3.350 $2.000
BRIDGE JOINT REPLACEMENT (ARMOR)
LF 548.000 $265.000 $325.000 $320.000 $175.000 $154.000 $360.000
BRIDGE JOINT REPLACEMENT (SEJ)
LF 944.000 $350.000 $375.000 $365.000 $180.000 $184.000 $360.000
TMA (STATIONARY)
EA 2.000 $1,000.000 $15,000.000 $5,000.000 $90,000.000 $18,000.000 $10,000.000
TMA (MOBILE OPERATION)
HR 48.000 $40.000 $100.000 $100.000 $2,300.000 $95.000 $70.000
Totals: $1,703,073.010 $1,693,704.500 $1,864,296.400 $1,949,722.500 $1,974,598.750 $2,007,555.500