WILBARGER US 287 (0043-05-113)

Items: 23

County: WILBARGER
Length: N/A
Highway: US 287
District: WICHITA FALLS
Control Number: 0043-05-113
DBE Goal: N/A
Project: STP 2B23(063)HES
Guaranty: N/A
Time: 270 WORKING DAYS
Engineer's Estimate: $1,840,649.39
Date: 06/27/2023 (2 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
CALLAN COLTHARP
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$1,840,649.39
$1,828,753.26
Over/Under Est: -0.65% -$11,896.13
$1,983,236.15
Over/Under Est: 7.75% $142,586.76
Amt Left: 8.45% $154,482.89
Over/Under Est: 30.22% $556,248.51
Amt Left: 31.07% $568,144.64
Delta: -20.86% -$413,661.75
Over/Under Est: 35.57% $654,636.61
Amt Left: 36.45% $666,532.74
Delta: -4.10% -$98,388.10
$2,536,724.00
Over/Under Est: 37.82% $696,074.61
Amt Left: 38.71% $707,970.74
Delta: -1.66% -$41,438.00

Bid Items & Bid Tabulations

23 Total 0 of 23
WILBARGER  |  US 287  |  WICHITA FALLS  |  0043-05-113  |  06/27/2023  |  $1,840,649.39  |  STP 2B23(063)HES  |  HAZARD ELIM & SAFETY  |  270 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MASSANA CONSTRUCTION INC.
HJC FARMS, INC.
SCR CIVIL CONSTRUCTION, LLC
GARRET SHIELDS INFRASTRUCTURE
FNH CONSTRUCTION, LLC
EXCAVATION (ROADWAY)
CY 2,560.000 $15.000 $50.000 $25.000 $32.000 $40.000 $40.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 4,078.000 $30.000 $51.000 $45.000 $53.000 $80.000 $50.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 57,952.000 $0.150 $0.180 $0.250 $1.000 $0.100 $1.000
BROADCAST SEED (TEMP) (WARM)
SY 28,977.000 $0.150 $0.160 $0.200 $0.050 $0.200 $1.000
BROADCAST SEED (TEMP) (COOL)
SY 28,977.000 $0.150 $0.160 $0.200 $0.050 $0.200 $1.000
VEGETATIVE WATERING
MG 588.000 $25.000 $97.650 $50.000 $72.000 $50.000 $30.000
RIPRAP (MOW STRIP)(4 IN)
CY 1,294.000 $450.000 $425.000 $500.000 $709.000 $500.000 $550.000
MOBILIZATION
LS 1.000 $149,992.490 $219,640.060 $200,000.000 $239,000.000 $200,000.000 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $3,500.000 $6,000.000 $2,500.000 $11,900.000 $5,000.000 $8,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 875.000 $5.000 $6.000 $7.000 $8.000 $6.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 875.000 $1.000 $2.000 $2.500 $4.000 $2.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 800.000 $5.000 $5.000 $6.000 $9.150 $10.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 800.000 $1.500 $1.000 $1.250 $4.600 $5.000 $9.000
MTL W-BEAM GD FEN (TIM POST)
LF 75.000 $27.000 $45.000 $36.000 $55.000 $50.000 $50.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,500.000 $2,300.000 $1,600.000 $2,635.000 $5,000.000 $2,000.000
CABLE BARRIER SYSTEM (TL-4)
LF 33,683.000 $17.000 $11.000 $12.950 $13.400 $20.000 $16.000
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 35.000 $3,000.000 $3,500.000 $3,750.000 $2,600.000 $5,000.000 $4,500.000
REMOVE CABLE BARRIER TERMINAL SECTION
EA 3.000 $1,000.000 $900.000 $1,500.000 $8,000.000 $500.000 $1,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,260.000 $4,000.000 $3,600.000 $4,580.000 $4,000.000 $3,250.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 6.000 $675.000 $400.000 $450.000 $1,250.000 $1,000.000 $1,100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 3.000 $45.000 $125.000 $30.000 $60.000 $50.000 $100.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 8.000 $3,750.000 $1,850.000 $15,000.000 $2,055.000 $100.000 $16,000.000
TMA (STATIONARY)
DAY 510.000 $250.000 $30.000 $150.000 $50.000 $400.000 $250.000
Totals: $1,840,649.390 $1,828,753.260 $1,983,236.150 $2,396,897.900 $2,495,286.000 $2,536,724.000