WICHITA US0287 (6428-44-001)

Items: 53

County: WICHITA
Length: N/A
Highway: US0287
District: WICHITA FALLS
Control Number: 6428-44-001
DBE Goal: N/A
Project: RMC - 642844001
Guaranty: N/A
Time: 366 CALENDAR DAYS
Engineer's Estimate: $1,468,493.00
Date: 06/28/2023 (2 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$1,468,493.00
$1,681,104.00
Over/Under Est: 14.48% $212,611.00
Over/Under Est: 23.06% $338,594.50
Amt Left: 7.49% $125,983.50
$2,198,850.00
Over/Under Est: 49.74% $730,357.00
Amt Left: 30.8% $517,746.00
Delta: -21.68% -$391,762.50

Bid Items & Bid Tabulations

53 Total 0 of 53
WICHITA  |  US0287  |  WICHITA FALLS  |  6428-44-001  |  06/28/2023  |  $1,468,493.00  |  RMC - 642844001  |  METAL BEAM GUARD FENCE REPAIR  |  366 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROSS SA ENTERPRISE LLC
MARCOM'S MOWING SERVICE, LLC
HJC FARMS, INC.
MOBILIZATION (CALLOUT)
EA 24.000 $500.000 $1.000 $1.000 $1,500.000
MOBILIZATION (EMERGENCY)
EA 12.000 $1,500.000 $1,250.000 $4,000.000 $1,500.000
MTL W-BEAM GD FEN (TIM POST)
LF 6,000.000 $30.000 $28.000 $23.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 20.000 $2,300.000 $1,525.000 $1,931.000 $2,000.000
MTL BEAM GD FEN TRANS (T101)
EA 10.000 $1,100.000 $1,000.000 $860.000 $1,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 20.000 $1,100.000 $2,000.000 $1,472.000 $1,500.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 200.000 $26.840 $35.000 $27.380 $30.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 100.000 $80.000 $100.000 $84.000 $60.000
MTL BM GD FEN TRANS (31"-28")
EA 50.000 $700.000 $300.000 $594.000 $1,000.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 10.000 $800.000 $500.000 $639.000 $600.000
REMOVE METAL BEAM GUARD FENCE
LF 6,000.000 $3.000 $3.000 $1.000 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 30.000 $300.000 $500.000 $1.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 120.000 $3,200.000 $3,450.000 $3,650.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 120.000 $300.000 $1.000 $1.000 $500.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,500.000 $500.000 $1,500.000 $2,500.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
EA 2.000 $22,000.000 $15,000.000 $10,000.000 $30,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $25,000.000 $32,000.000 $28,000.000 $34,000.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 2.000 $30,000.000 $25,000.000 $35,000.000 $50,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 150.000 $35.000 $35.000 $30.000 $35.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 100.000 $35.000 $30.000 $30.000 $35.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 5,000.000 $20.000 $25.000 $16.430 $28.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 50.000 $50.000 $30.000 $43.240 $35.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 150.000 $55.000 $30.000 $50.530 $40.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 250.000 $50.000 $100.000 $48.000 $50.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 50.000 $120.000 $100.000 $100.000 $65.000
REALIGN POSTS
EA 300.000 $25.000 $15.000 $20.000 $15.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 250.000 $12.500 $90.000 $20.000 $20.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 200.000 $50.000 $40.000 $54.080 $50.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 20.000 $200.000 $150.000 $200.000 $300.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 10.000 $750.000 $200.000 $1,047.000 $1,200.000
REM & RESET SGT IMPACT HEAD
EA 10.000 $500.000 $1.000 $1.000 $500.000
REPLACE SGT OBJECT MARKER
EA 10.000 $50.000 $10.000 $50.000 $35.000
REPLACE POSTS (TL-3)
EA 1,000.000 $75.000 $170.000 $183.000 $225.000
REPLACE POSTS (TL-4)
EA 1,500.000 $75.000 $200.000 $290.000 $275.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 10.000 $300.000 $200.000 $250.000 $100.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 20.000 $300.000 $200.000 $250.000 $100.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 10.000 $150.000 $350.000 $150.000 $50.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 20.000 $150.000 $50.000 $150.000 $50.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 10.000 $500.000 $500.000 $250.000 $1,250.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 50.000 $500.000 $500.000 $1,150.000 $1,250.000
REPLACE CABLE (TL-3)
LF 250.000 $20.000 $4.000 $5.000 $5.000
REPLACE CABLE (TL-4)
LF 500.000 $20.000 $4.000 $5.000 $5.000
CHECK / RE-TENSION CABLE
EA 100.000 $250.000 $250.000 $100.000 $250.000
REPAIR (TRACC)
EA 5.000 $500.000 $1,000.000 $250.000 $2,500.000
REPAIR (SMTC) (N)
EA 5.000 $500.000 $1,000.000 $2,500.000 $2,500.000
REPAIR (SMTC) (W)
EA 5.000 $500.000 $1,000.000 $2,500.000 $2,500.000
REPAIR (VIA -SAND FILL PLASTIC BARRELS)
EA 5.000 $500.000 $500.000 $500.000 $2,500.000
REPAIR (FASTRACC)
LF 5.000 $500.000 $1,000.000 $500.000 $2,500.000
REPAIR (NARROW REACT 350)
EA 5.000 $500.000 $900.000 $1,000.000 $500.000
REPAIR (QUADGUARD)(MASH)(N)
EA 5.000 $500.000 $1,200.000 $1,000.000 $2,500.000
REPAIR (TAU)(MASH)(N)
EA 5.000 $500.000 $1,200.000 $100.000 $2,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 10.000 $250.000 $150.000 $250.000 $1,000.000
TMA (STATIONARY)
DAY 100.000 $500.000 $1.000 $1.000 $200.000
Totals: $1,468,493.000 $1,681,104.000 $1,807,087.500 $2,198,850.000