Show Job Controls
Bid Cobra

WICHITA IH0044 (6318-41-001)

Items: 35

County: WICHITA
Length: N/A
Highway: IH0044
District: WICHITA FALLS
Control Number: 6318-41-001
DBE Goal: N/A
Project: RMC - 631841001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $998,255.00
Date: 06/06/2017 (9 years ago)
Contract Number: N/A
Type: DW ONCALL GRDRAI/CABLE BARRIER REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$998,255.00
$1,038,100.00
Over/Under Est: 3.99% $39,845.00
$1,147,800.00
Over/Under Est: 14.98% $149,545.00
Amt Left: 10.57% $109,700.00
$1,482,440.00
Over/Under Est: 48.5% $484,185.00
Amt Left: 42.8% $444,340.00
Delta: -29.15% -$334,640.00

Bid Items & Bid Tabulations

35 Total 0 of 35
WICHITA  |  IH0044  |  WICHITA FALLS  |  6318-41-001  |  06/06/2017  |  $998,255.00  |  RMC - 631841001  |  DW ONCALL GRDRAI/CABLE BARRIER REPAI...  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MARCOM'S MOWING SERVICE, LLC
HJC FARMS, INC.
EARTH BUILDERS, L.P.
MOBILIZATION (CALLOUT)
EA 30.000 $800.000 $500.000 $350.000 $2,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,575.000 $800.000 $950.000 $1,400.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 200.000 $20.000 $20.000 $35.000 $50.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 50.000 $20.000 $20.000 $35.000 $30.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 7,000.000 $16.500 $16.100 $15.000 $25.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 200.000 $25.000 $35.000 $30.000 $40.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 350.000 $20.000 $20.000 $20.000 $40.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 650.000 $43.000 $52.000 $50.000 $100.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 100.000 $45.000 $30.000 $85.000 $130.000
REALIGN POSTS
EA 300.000 $20.000 $20.000 $20.000 $50.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 300.000 $10.000 $15.000 $10.000 $25.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,000.000 $20.000 $35.000 $30.000 $24.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 200.000 $44.000 $20.000 $50.000 $100.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 100.000 $3,000.000 $3,300.000 $2,750.000 $3,200.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 20.000 $820.000 $1,000.000 $700.000 $2,000.000
REM & RESET SGT IMPACT HEAD
EA 15.000 $81.000 $150.000 $250.000 $300.000
REPLACE POSTS (TL-3)
EA 3,000.000 $90.000 $80.000 $125.000 $100.000
REPLACE POSTS (TL-4)
EA 100.000 $130.000 $125.000 $125.000 $100.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 20.000 $50.000 $250.000 $250.000 $150.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 10.000 $104.000 $250.000 $250.000 $130.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 50.000 $65.000 $100.000 $50.000 $250.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 10.000 $165.000 $75.000 $50.000 $250.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 30.000 $500.000 $1,500.000 $1,000.000 $1,500.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 10.000 $600.000 $1,000.000 $1,000.000 $1,500.000
REPLACE CABLE (TL-3)
LF 1,000.000 $4.000 $3.000 $2.000 $8.000
REPLACE CABLE (TL-4)
LF 1,000.000 $5.400 $3.000 $2.000 $8.000
REMOVE AND REPLACE (TRACC)
EA 1.000 $18,500.000 $15,000.000 $15,000.000 $19,000.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 2.000 $18,750.000 $21,000.000 $20,000.000 $30,000.000
REPAIR (TRACC)
EA 2.000 $3,000.000 $1,500.000 $5,000.000 $6,000.000
REPAIR (REACT)
EA 1.000 $2,000.000 $3,500.000 $5,000.000 $4,000.000
REMOVE AND REPLACE (FASTRACC)
EA 1.000 $25,000.000 $18,000.000 $18,000.000 $28,000.000
REPAIR (FASTRACC)
LF 15.000 $340.000 $1,000.000 $5,000.000 $7,500.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 300.000 $47.000 $50.000 $25.000 $75.000
REP METAL POST W/ BASE PLATE (T6 RAIL)
EA 40.000 $180.000 $150.000 $100.000 $250.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 12.000 $200.000 $50.000 $150.000 $220.000
Totals: $998,255.000 $1,038,100.000 $1,147,800.000 $1,482,440.000