Show Job Controls
Bid Cobra

WICHITA OLD STATE RD (0903-03-118)

Items: 40

County: WICHITA
Length: 0.0000 MILES
Highway: OLD STATE RD
District: WICHITA FALLS
Control Number: 0903-03-118
DBE Goal: 0.0%
Project: BR 2024(111)
Guaranty: $16,000.00
Time: 91 WORKING DAYS
Engineer's Estimate: $796,551.90
Date: 10/02/2024 (1 year ago)
Contract Number: 10243222
Type: BRIDGE REPLACEMENT
Project ID: A00186188
Project Description: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
CALLAN COLTHARP
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$796,551.90
1
Awarded
$865,563.51
Over/Under Est: 8.66% $69,011.61
$941,993.01
Over/Under Est: 18.26% $145,441.11
Amt Left: 8.83% $76,429.50
$1,057,677.58
Over/Under Est: 32.78% $261,125.68
Amt Left: 22.2% $192,114.07
Delta: -12.28% -$115,684.57
Over/Under Est: 40.85% $325,430.61
Amt Left: 29.62% $256,419.00
Delta: -6.08% -$64,304.93
$1,150,446.03
Over/Under Est: 44.43% $353,894.13
Amt Left: 32.91% $284,882.52
Delta: -2.54% -$28,463.52
Over/Under Est: 85.87% $684,022.16
Amt Left: 71.05% $615,010.55
Delta: -28.70% -$330,128.03
Subcontractor Percentage Amount
BLACKSMITH VENTURES LLC 14.45% $125,073.93
DIIBS SPECIALISTS, LLC 4.39% $37,998.24
Total: 18.84% $163,072.17

Bid Items & Bid Tabulations

40 Total 0 of 40
WICHITA  |  OLD STATE RD  |  WICHITA FALLS  |  0903-03-118  |  10/02/2024  |  $796,551.90  |  BR 2024(111)  |  BRIDGE REPL  |  91 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
STX CIVIL
SKYLINE BRIDGE LLC
EARTH BUILDERS, L.P.
PROJECT ALLIED RESOURCES, LLC
THK CONSTRUCTION LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
PREPARING ROW
STA 2.000 $2,500.000 $3,500.000 $3,250.000 $25,000.000 $7,970.000 $37,500.000 $20,000.000
RMV (6") TRT/UNTRT BASE & ASPH PAV
SY 918.000 $16.000 $8.000 $13.000 $15.000 $10.700 $25.000 $8.000
RMV (8") TRT/UNTRT BASE & ASPH PAV
CY 625.000 $8.000 $10.000 $41.000 $25.000 $46.400 $25.000 $40.000
EXCAV (ROADWAY)
CY 664.000 $24.000 $40.000 $17.000 $25.000 $36.100 $25.000 $40.000
EMBANK (FNL)(DC)(TY C)
CY 711.000 $18.000 $50.000 $37.000 $40.000 $67.000 $25.000 $45.000
BLADING
HR 2.000 $150.000 $120.000 $200.000 $125.000 $216.000 $200.000 $100.000
BROADCAST SEED (PERM_RURAL_SAND)
SY 1,893.000 $0.300 $10.000 $3.000 $1.500 $3.060 $5.500 $4.000
DRILL SEED (TEMP_WARM_COOL)
SY 0.390 $500.000 $9.000 $3.500 $1.500 $16.300 $0.010 $4.000
VEGETATIVE WATERING
TGL 16.000 $35.000 $60.000 $10.000 $50.000 $105.000 $10.000 $1.000
SOIL RET BLKT(SL_MOD_CLAY_SHORT)
SY 870.000 $1.600 $6.000 $2.500 $5.000 $4.640 $2.200 $4.000
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 888.000 $28.000 $45.000 $55.000 $35.000 $34.600 $50.000 $60.000
CEMENT
TON 19.200 $310.000 $460.000 $330.000 $300.000 $394.000 $400.000 $350.000
CEMENT TRT (NEW BASE)(8")
SY 1,335.000 $6.000 $11.000 $20.000 $15.000 $6.700 $25.000 $25.000
PRIME COAT (MC-30)
GAL 334.000 $7.000 $10.000 $13.500 $10.000 $20.300 $17.040 $20.000
D-GR HMA TY-B SAC-B PG70-22
TON 309.540 $175.000 $200.000 $275.000 $250.000 $297.000 $259.560 $250.000
D-GR HMA TY-D SAC-B PG70-22
TON 154.770 $150.000 $200.000 $335.000 $250.000 $310.000 $369.520 $250.000
TACK COAT
GAL 56.000 $3.500 $7.000 $5.000 $30.000 $60.000 $2.200 $8.000
RIPRAP (CONC)(4 IN)
CY 25.000 $700.000 $650.000 $801.000 $600.000 $857.000 $800.000 $900.000
RIPRAP (MOW STRIP)(4 IN)
CY 68.000 $750.000 $700.000 $718.000 $600.000 $843.000 $800.000 $700.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 135.000 $230.000 $215.000 $181.000 $230.000 $321.000 $200.000 $275.000
CONC BOX CULV (8 FT X 5 FT)
LF 82.000 $960.000 $1,000.000 $1,067.000 $1,100.000 $1,480.000 $1,200.000 $1,800.000
CONC BOX CULV (9 FT X 7 FT)
LF 70.400 $1,470.000 $1,400.000 $1,398.000 $1,500.000 $1,860.000 $1,300.000 $2,200.000
WINGWALL (PW - 2) (HW=7 FT)
EA 2.000 $22,000.000 $30,000.000 $30,225.000 $45,000.000 $24,000.000 $70,000.000 $75,000.000
WINGWALL (PW - 2) (HW=9 FT)
EA 1.000 $30,000.000 $40,000.000 $50,245.000 $70,000.000 $30,700.000 $75,000.000 $125,000.000
WINGWALL (PW - 2) (HW=10 FT)
EA 1.000 $70,000.000 $50,000.000 $55,640.000 $70,000.000 $30,700.000 $80,000.000 $125,000.000
REMOV STR (HEADWALL)
EA 2.000 $1,680.000 $2,500.000 $1,500.000 $15,000.000 $3,200.000 $2,500.000 $20,000.000
REMOV STR (PIPE)
LF 104.000 $20.000 $20.000 $87.000 $50.000 $36.400 $25.000 $95.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $13,000.000 $15,000.000 $11,375.000 $35,000.000 $54,000.000 $20,000.000 $20,000.000
MOBILIZATION
LS 1.000 $80,000.000 $75,000.000 $75,000.000 $90,000.000 $112,000.000 $80,000.000 $130,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $7,000.000 $2,500.000 $2,450.000 $2,500.000 $9,760.000 $2,689.500 $10,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 112.000 $125.000 $70.000 $150.000 $100.000 $160.000 $58.930 $95.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 120.000 $4.000 $6.000 $4.000 $8.000 $7.700 $11.000 $1.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 120.000 $1.000 $2.000 $2.000 $1.000 $2.220 $3.850 $1.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 10.000 $6.000 $10.000 $13.000 $20.000 $11.600 $27.500 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 10.000 $1.200 $2.000 $5.000 $1.000 $3.240 $3.300 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 300.000 $28.000 $40.000 $32.000 $26.000 $33.700 $25.030 $25.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 4.000 $1,350.000 $1,500.000 $1,750.000 $1,800.000 $1,640.000 $1,375.000 $1,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,200.000 $3,500.000 $4,200.000 $3,800.000 $3,640.000 $3,437.500 $3,000.000
REMOVE SM RD SN SUP&AM
EA 4.000 $115.000 $150.000 $258.000 $150.000 $304.000 $250.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 20.000 $32.000 $320.000 $35.000 $35.000 $79.000 $27.500 $30.000
Totals: $796,551.900 $865,563.510 $941,993.015 $1,057,677.585 $1,121,982.517 $1,150,446.037 $1,480,574.060