Show Job Controls
Bid Cobra

WICHITA FM 369 (0802-02-078)

Items: 37

County: WICHITA
Length: N/A
Highway: FM 369
District: WICHITA FALLS
Control Number: 0802-02-078
DBE Goal: 0.0%
Project: F 2B24(021)
Guaranty: N/A
Time: 45 WORKING DAYS
Engineer's Estimate: $2,175,200.90
Date: 05/02/2024 (2 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
CALLAN COLTHARP
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,175,200.90
$2,148,058.09
Over/Under Est: -1.25% -$27,142.81
$2,634,032.80
Over/Under Est: 21.09% $458,831.90
Amt Left: 22.62% $485,974.71
$2,710,836.09
Over/Under Est: 24.62% $535,635.19
Amt Left: 26.2% $562,778.00
Delta: -2.92% -$76,803.29
Subcontractor Percentage Amount
DUSTROL, INC. 3.25% $69,811.89
HJC FARMS, INC. 3.11% $66,804.61
TRP CONSTRUCTION GROUP, LLC 2.09% $44,894.41
W. S. CONSTRUCTION COMPANY 1.32% $28,354.37
PENHALL COMPANY 0.52% $11,169.90
BARRICADES UNLIMITED 0.42% $9,021.84
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.07% $1,503.64
Total: 10.78% $231,560.66

Bid Items & Bid Tabulations

37 Total 0 of 37
WICHITA  |  FM 369  |  WICHITA FALLS  |  0802-02-078  |  05/02/2024  |  $2,175,200.90  |  F 2B24(021)  |  SURF/ROADWAY RESTOR  |  45 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ZACK BURKETT CO.
JAGOE-PUBLIC COMPANY
A. L. HELMCAMP, INC.
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 205.000 $40.000 $25.000 $110.000 $110.000
BACKFILL (TY A OR B)
STA 173.000 $225.000 $250.000 $275.000 $310.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 22,733.000 $0.450 $0.210 $0.250 $0.180
VEGETATIVE WATERING
MG 191.000 $75.000 $20.000 $85.000 $40.000
EMULS ASPH (EROSN CONT)(SS-1)
GAL 5,683.000 $4.250 $3.900 $3.000 $6.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 7,000.000 $55.700 $55.000 $55.000 $90.000
PLANE ASPH CONC PAV(0" TO 2")
SY 7,749.000 $7.000 $4.250 $4.000 $10.000
RIPRAP (MOW STRIP)(4 IN)
CY 37.000 $502.000 $1,416.000 $1,300.000 $875.000
MOBILIZATION
LS 1.000 $197,745.540 $214,000.000 $250,000.000 $160,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $4,800.000 $15,247.810 $30,000.000 $12,500.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 200.000 $4.500 $7.080 $10.000 $6.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $2.000 $2.360 $2.000 $2.300
RUMBLE STRIPS (SHOULDER)
LF 15,305.000 $0.220 $0.340 $0.550 $0.500
RUMBLE STRIPS (CENTERLINE)
LF 17,050.000 $0.220 $0.340 $0.250 $0.500
MTL W-BEAM GD FEN (TIM POST)
LF 250.000 $30.000 $53.100 $29.750 $31.000
MTL THRIE-BEAM GD FEN (TIM POST)
EA 4.000 $2,178.000 $2,360.000 $2,600.000 $1,700.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 2.000 $750.000 $1,829.000 $1,200.000 $1,100.000
REMOVE METAL BEAM GUARD FENCE
LF 200.000 $6.000 $5.900 $6.200 $8.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $275.000 $590.000 $460.000 $340.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $485.000 $590.000 $460.000 $340.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,850.000 $4,720.000 $4,000.000 $3,200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $582.500 $2,950.000 $770.000 $2,000.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 1.000 $350.000 $2,950.000 $670.000 $2,000.000
REMOVE SM RD SN SUP&AM
EA 1.000 $183.000 $236.000 $120.000 $500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $50.000 $33.000 $31.000 $45.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 921.000 $2.000 $1.200 $5.000 $0.750
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 1.000 $660.000 $710.360 $740.000 $650.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 31,662.000 $0.720 $0.790 $0.850 $0.700
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 3,346.000 $0.720 $0.890 $0.950 $0.750
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 11,200.000 $0.720 $0.790 $0.850 $0.700
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 108.000 $13.000 $16.820 $17.500 $15.000
PREFAB PAV MRK TY C (W) (WORD)
EA 1.000 $45.000 $398.840 $420.000 $390.000
REFL PAV MRKR TY II-A-A
EA 378.000 $4.000 $5.550 $5.800 $6.000
SP MIXES SP-D SAC-A PG70-28
TON 9,124.000 $140.000 $129.100 $175.000 $165.000
BONDING COURSE
GAL 4,946.000 $3.650 $5.650 $1.000 $7.000
TMA (STATIONARY)
DAY 60.000 $330.000 $275.000 $150.000 $200.000
TMA (MOBILE OPERATION)
DAY 12.000 $541.000 $1.000 $150.000 $200.000
Totals: $2,175,200.900 $2,148,058.090 $2,634,032.800 $2,710,836.090