Show Job Controls
Bid Cobra

WICHITA FM 369 (0802-02-075)

Items: 42

County: WICHITA
Length: N/A
Highway: FM 369
District: WICHITA FALLS
Control Number: 0802-02-075
DBE Goal: N/A
Project: STP 2B20(326)
Guaranty: N/A
Time: 51 WORKING DAYS
Engineer's Estimate: $1,303,272.90
Date: 12/02/2020 (5 years ago)
Contract Number: N/A
Type: PAVEMENT REPAIR AND OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,303,272.90
$976,487.33
Over/Under Est: -25.07% -$326,785.57
$1,000,931.52
Over/Under Est: -23.2% -$302,341.38
Amt Left: 2.5% $24,444.19
Over/Under Est: -9.18% -$119,619.24
Amt Left: 21.22% $207,166.33
Delta: -18.26% -$182,722.14
Over/Under Est: -9.14% -$119,176.56
Amt Left: 21.26% $207,609.01
Delta: -0.04% -$442.68
$1,386,086.35
Over/Under Est: 6.35% $82,813.45
Amt Left: 41.95% $409,599.02
Delta: -17.06% -$201,990.01

Bid Items & Bid Tabulations

42 Total 0 of 42
WICHITA  |  FM 369  |  WICHITA FALLS  |  0802-02-075  |  12/02/2020  |  $1,303,272.90  |  STP 2B20(326)  |  PAVMT REPAIR AND OVERLAY  |  51 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
INTEGRITY SERVICES, LLC
ZACK BURKETT CO.
EUROVIA ATLANTIC COAST LLC
PEACHTREE CONSTRUCTION, LTD.
A. L. HELMCAMP, INC.
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 212.000 $40.000 $20.000 $12.000 $60.000 $63.000 $60.000
BACKFILL (TY A)
STA 78.510 $430.000 $95.000 $145.000 $230.000 $220.000 $400.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 3,600.000 $1.500 $0.830 $0.750 $0.750 $0.250 $0.850
VEGETATIVE WATERING
MG 14.000 $100.000 $65.000 $25.000 $105.000 $25.000 $45.000
EMULS ASPH (EROSN CONT)(SS-1)
GAL 1,742.000 $3.250 $4.000 $3.400 $2.500 $4.000 $7.500
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 4,847.000 $125.000 $113.300 $108.500 $117.000 $126.000 $130.000
FLEX PAVEMENT STRUCTURE REPAIR (2-8")
SY 1,108.000 $82.000 $8.800 $46.000 $45.000 $54.500 $70.000
FLEX PAVEMENT STRUCTURE REPAIR (8"-12")
SY 890.000 $102.000 $22.000 $69.000 $72.000 $85.000 $120.000
PLAN & TEXT ASPH CONC PAV(0" TO 4")
SY 2,078.000 $8.000 $5.500 $4.500 $4.500 $3.700 $9.000
PLANE ASPH CONC PAV(0" TO 2")
SY 3,543.000 $4.500 $3.300 $2.500 $5.700 $3.150 $6.000
RIPRAP (MOW STRIP)(4 IN)
CY 90.000 $650.000 $500.000 $600.000 $665.000 $630.000 $900.000
STR STEEL (MISCELLANEOUS BRIDGE)
LB 17,897.500 $5.000 $3.080 $4.910 $4.150 $4.350 $4.000
MOBILIZATION
LS 1.000 $116,843.000 $130,484.710 $75,875.000 $100,000.000 $95,000.000 $130,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $6,000.000 $1,700.000 $1,467.000 $24,650.000 $14,250.000 $15,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,600.000 $4.000 $2.970 $2.700 $2.700 $6.500 $3.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,600.000 $1.000 $0.720 $0.650 $0.650 $1.050 $1.000
RUMBLE STRIPS (SHOULDER)
LF 15,029.000 $0.350 $0.170 $0.250 $0.400 $0.300 $0.600
RUMBLE STRIPS (CENTERLINE)
LF 7,514.000 $0.500 $0.200 $0.300 $0.580 $0.350 $0.600
MTL W-BEAM GD FEN (TIM POST)
LF 800.000 $22.000 $20.790 $20.000 $19.800 $18.500 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,900.000 $1,431.000 $1,500.000 $1,800.000 $1,000.000 $2,100.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 8.000 $650.000 $702.000 $820.000 $600.000 $630.000 $700.000
REMOVE METAL BEAM GUARD FENCE
LF 1,025.000 $3.000 $2.700 $2.000 $3.000 $2.150 $4.000
REMOVE TERMINAL ANCHOR SECTION
EA 7.000 $280.000 $216.000 $175.000 $300.000 $160.000 $350.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,800.000 $2,754.000 $2,250.000 $2,700.000 $2,100.000 $3,100.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $400.000 $216.000 $175.000 $300.000 $157.000 $350.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 16.000 $35.000 $21.600 $11.000 $30.000 $19.500 $40.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 24.000 $35.000 $37.800 $14.000 $30.000 $41.000 $40.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 119.000 $3.000 $1.000 $1.000 $1.400 $2.250 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 846.000 $1.500 $1.000 $1.000 $1.400 $2.250 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 501.000 $2.800 $1.080 $0.800 $0.850 $0.900 $1.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 313.000 $2.000 $1.080 $0.450 $0.550 $0.480 $0.650
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 16,764.000 $0.850 $0.540 $0.450 $0.380 $0.480 $0.450
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 992.000 $0.750 $1.080 $0.450 $0.550 $0.480 $0.650
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 12,550.000 $0.650 $0.540 $0.450 $0.380 $0.480 $0.450
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 48.000 $16.000 $16.200 $18.000 $13.000 $19.500 $15.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $250.000 $243.000 $224.000 $275.000 $240.000 $210.000
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $350.000 $324.000 $298.000 $375.000 $315.000 $430.000
REFL PAV MRKR TY I-C
EA 41.000 $6.000 $5.400 $5.000 $7.000 $5.250 $8.000
REFL PAV MRKR TY II-A-A
EA 201.000 $5.000 $5.400 $5.000 $5.000 $5.250 $6.000
BONDING COURSE
GAL 2,643.000 $3.750 $4.000 $3.750 $4.000 $3.950 $4.000
TMA (STATIONARY)
DAY 45.000 $275.000 $180.000 $25.000 $275.000 $100.000 $250.000
TMA (MOBILE OPERATION)
DAY 10.000 $750.000 $366.000 $150.000 $565.000 $250.000 $450.000
Totals: $1,303,272.900 $976,487.330 $1,000,931.525 $1,183,653.665 $1,184,096.345 $1,386,086.350