Show Job Controls
Bid Cobra

WICHITA US 281 (0249-01-047)

Items: 78

County: WICHITA
Length: N/A
Highway: US 281
District: WICHITA FALLS
Control Number: 0249-01-047
DBE Goal: N/A
Project: STP 2020(228)
Guaranty: N/A
Time: 90 WORKING DAYS
Engineer's Estimate: $2,900,317.18
Date: 11/05/2019 (6 years ago)
Contract Number: N/A
Type: WIDEN PAVEMENT AND OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (1)
E
Engineer's Estimate
$2,900,317.18
$3,928,716.03
Over/Under Est: 35.46% $1,028,398.85

Bid Items & Bid Tabulations

78 Total 0 of 78
WICHITA  |  US 281  |  WICHITA FALLS  |  0249-01-047  |  11/05/2019  |  $2,900,317.18  |  STP 2020(228)  |  WIDEN PAVMT AND OVERLAY  |  90 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
REMOVING CONC (MISC)
SY 2.500 $50.000 $600.000
EXCAVATION (ROADWAY)
CY 1,764.000 $20.000 $33.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 2,911.000 $18.000 $32.000
SPOT SODDING
SY 4,900.000 $7.000 $7.500
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 3.900 $650.000 $685.000
DRILL SEEDING (TEMP) (WARM)
AC 1.950 $450.000 $540.000
DRILL SEEDING (TEMP) (COOL)
AC 1.950 $450.000 $485.000
VEGETATIVE WATERING
MG 205.000 $35.000 $20.000
CEMENT
TON 194.700 $160.000 $190.000
CEMENT TREAT (SUBGRADE) (8")
SY 19,674.000 $4.000 $5.500
PRIME COAT (MC-30)
GAL 4,919.000 $4.000 $7.000
D-GR HMA TY-B PG64-22
TON 6,195.000 $100.000 $139.000
SUPERPAVE MIXTURES SP-C PG64-22(LEV-UP)
TON 1,040.000 $110.000 $165.000
TACK COAT
GAL 878.000 $4.000 $5.500
STONE-MTRX-ASPH SMA-D SAC-B PG76-22
TON 9,554.000 $115.000 $165.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 1,867.000 $35.000 $78.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 3,875.000 $2.000 $6.500
RIPRAP (CONC)(5 IN)
CY 1.400 $600.000 $1,300.000
RIPRAP (MOW STRIP)(4 IN)
CY 27.000 $500.000 $700.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 10.000 $900.000 $540.000
RC PIPE (CL III)(18 IN)
LF 14.000 $70.000 $190.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 1.000 $9,000.000 $6,400.000
SET (TY I)(S= 8 FT)(HW= 3 FT)(4:1) (C)
EA 1.000 $12,000.000 $9,600.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 1.000 $1,000.000 $1,300.000
REMOV STR (SET)
EA 1.000 $800.000 $550.000
MOBILIZATION
LS 1.000 $256,318.230 $264,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $7,000.000 $6,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 120.000 $35.000 $57.000
ROCK FILTER DAMS (REMOVE)
LF 120.000 $9.000 $21.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,101.000 $3.400 $2.300
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,101.000 $1.000 $0.800
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 330.000 $3.500 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 330.000 $1.200 $0.800
DRIVEWAYS (CONC)
SY 266.000 $100.000 $95.000
DRIVEWAYS (ACP)
SY 649.000 $35.000 $50.000
DRIVEWAYS (BASE)
SY 4,008.000 $24.000 $22.000
RUMBLE STRIPS (CENTERLINE)
LF 11,477.000 $0.500 $0.600
MTL W-BEAM GD FEN (TIM POST)
LF 400.000 $35.000 $37.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,200.000 $700.000
REMOVE METAL BEAM GUARD FENCE
LF 375.000 $5.000 $5.500
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $250.000 $270.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,500.000 $2,700.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $600.000 $550.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 15.000 $280.000 $330.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 7.000 $300.000 $370.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 13.000 $380.000 $770.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 1.000 $730.000 $800.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 13.000 $550.000 $790.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $800.000 $870.000
IN SM RD SN SUP&AM TYS80(1)SB(P-BM)
EA 2.000 $780.000 $890.000
IN SM RD SN SUP&AM TYTWT(1)UB(T)
EA 2.000 $780.000 $650.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 11.000 $270.000 $550.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 16.000 $500.000 $610.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $700.000 $710.000
REMOVE SM RD SN SUP&AM
EA 40.000 $175.000 $110.000
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
EA 7.000 $150.000 $87.000
INSTL DEL ASSM (D-DY)SZ 1(FLX)SRF
EA 2.000 $160.000 $110.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 4.000 $180.000 $90.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 12.000 $30.000 $40.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,315.000 $1.400 $0.600
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,741.000 $1.300 $0.600
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 468.000 $0.500 $1.200
REFL PAV MRK TY II (W) 4" (BRK)
LF 2,775.000 $0.120 $0.330
REFL PAV MRK TY II (Y) 4" (SLD)
LF 23,591.000 $0.150 $0.330
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 6,430.000 $0.400 $0.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 25,634.000 $0.500 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 27,069.000 $0.400 $0.500
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 30.000 $20.000 $14.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 1.000 $250.000 $250.000
PREFAB PAV MRK TY C (W) (WORD)
EA 1.000 $500.000 $280.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 16.000 $50.000 $70.000
REFL PAV MRKR TY I-C
EA 327.000 $10.000 $4.500
REFL PAV MRKR TY II-A-A
EA 623.000 $6.000 $4.500
ELIM EXT PAV MRK & MRKS (4")
LF 29,141.000 $0.500 $0.600
BONDING COURSE
GAL 13,803.000 $3.000 $2.800
PORTABLE CHANGEABLE MESSAGE SIGN
EA 1.000 $9,000.000 $25,000.000
TMA (STATIONARY)
DAY 83.000 $300.000 $350.000
TMA (MOBILE OPERATION)
DAY 11.000 $800.000 $900.000
Totals: $2,900,317.180 $3,928,716.030