Show Job Controls
Bid Cobra

WICHITA SS 447 (0156-12-020)

Items: 55

County: WICHITA
Length: N/A
Highway: SS 447
District: WICHITA FALLS
Control Number: 0156-12-020
DBE Goal: N/A
Project: F 2024(665)
Guaranty: N/A
Time: 100 WORKING DAYS
Engineer's Estimate: $2,188,623.44
Date: 01/05/2024 (2 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
CALLAN COLTHARP
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$2,188,623.44
$2,981,834.52
Over/Under Est: 36.24% $793,211.08

Bid Items & Bid Tabulations

55 Total 0 of 55
WICHITA  |  SS 447  |  WICHITA FALLS  |  0156-12-020  |  01/05/2024  |  $2,188,623.44  |  F 2024(665)  |  SURF/ROADWAY RESTOR  |  100 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ZACK BURKETT CO.
REMOVING CONC (CURB AND GUTTER)
LF 45.000 $12.000 $59.000
BACKFILL (TY B)
STA 25.000 $150.000 $1,000.000
BROADCAST SEED (PERM) (URBAN) (SANDY)
SY 3,150.000 $0.500 $1.000
VEGETATIVE WATERING
MG 26.500 $22.500 $100.000
EMULS ASPH (EROSN CONT)(MULTI)
GAL 788.000 $4.000 $6.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 2,300.000 $80.000 $122.000
PLAN & TEXT ASPH CONC PAV(0" TO 4")
SY 34,327.000 $4.000 $4.500
FULL - DEPTH REPAIR CRCP (8")
SY 280.000 $300.000 $719.800
RIPRAP (MOW STRIP)(4 IN)
CY 118.000 $550.000 $796.500
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 2,474.000 $60.000 $112.100
MOBILIZATION
LS 1.000 $194,602.130 $260,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $8,000.000 $30,000.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 2,650.000 $4.000 $3.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,650.000 $1.000 $1.000
CONC CURB & GUTTER (TY II)
LF 195.000 $60.000 $88.500
INTERSECTIONS (ACP)
SY 1,964.000 $200.000 $75.000
MTL W-BEAM GD FEN (TIM POST)
LF 2,356.000 $25.000 $30.680
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 13.000 $1,800.000 $2,773.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,200.000 $1,740.500
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 13.000 $300.000 $767.000
REMOVE METAL BEAM GUARD FENCE
LF 2,308.000 $3.000 $2.360
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $200.000 $236.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $2,700.000 $3,953.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $250.000 $236.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 6.000 $650.000 $1,180.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 60.000 $20.000 $29.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 38.000 $25.000 $59.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,100.000 $1.000 $1.200
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 48.000 $1.100 $1.200
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 2,925.000 $0.300 $1.180
REFL PAV MRK TY I (Y)8"(SLD)(090MIL)
LF 90.000 $0.900 $1.180
REFL PAV MRK TY II (W) 4" (BRK)
LF 3,230.000 $0.250 $1.180
PAVEMENT SEALER 6"
LF 9,348.000 $0.250 $0.240
PAVEMENT SEALER 8"
LF 1,643.000 $0.320 $0.370
PAVEMENT SEALER 24"
LF 198.000 $3.500 $2.360
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 4,290.000 $0.600 $0.830
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 15,266.000 $0.600 $0.830
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 14,820.000 $0.400 $0.830
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 183.000 $10.000 $9.440
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 608.000 $5.000 $17.700
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $220.000 $324.500
PREFAB PAV MRK TY C (W) (WORD)
EA 4.000 $255.000 $413.000
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 16.000 $30.000 $88.500
REFL PAV MRKR TY II-A-A
EA 10.000 $3.300 $5.900
REFL PAV MRKR TY II-C-R
EA 441.000 $3.600 $5.900
ELIM EXT PAV MRK & MRKS (4")
LF 9,348.000 $1.000 $0.410
ELIM EXT PAV MRK & MRKS (8")
LF 1,643.000 $1.000 $0.830
ELIM EXT PAV MRK & MRKS (24")
LF 198.000 $4.250 $2.360
ELIM EXT PAV MRK & MRKS (ARROW)
EA 2.000 $100.000 $59.000
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
LF 598.000 $1.500 $10.000
VEH LP DETECT (SAWCUT)(14 AWG)(BLK)
LF 110.000 $4.000 $50.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 3,682.000 $190.000 $275.000
BONDING COURSE
GAL 2,144.000 $4.200 $6.000
TMA (STATIONARY)
DAY 100.000 $225.000 $500.000
TMA (MOBILE OPERATION)
DAY 11.000 $275.000 $250.000
Totals: $2,188,623.440 $2,981,834.520