REMOVING CONC (CURB AND GUTTER)
|
LF
|
45.000
|
$12.000
|
$59.000
|
|
|
BACKFILL (TY B)
|
STA
|
25.000
|
$150.000
|
$1,000.000
|
|
|
BROADCAST SEED (PERM) (URBAN) (SANDY)
|
SY
|
3,150.000
|
$0.500
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
26.500
|
$22.500
|
$100.000
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
788.000
|
$4.000
|
$6.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
2,300.000
|
$80.000
|
$122.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 4")
|
SY
|
34,327.000
|
$4.000
|
$4.500
|
|
|
FULL - DEPTH REPAIR CRCP (8")
|
SY
|
280.000
|
$300.000
|
$719.800
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
118.000
|
$550.000
|
$796.500
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
2,474.000
|
$60.000
|
$112.100
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$194,602.130
|
$260,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$8,000.000
|
$30,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
2,650.000
|
$4.000
|
$3.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,650.000
|
$1.000
|
$1.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
195.000
|
$60.000
|
$88.500
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,964.000
|
$200.000
|
$75.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,356.000
|
$25.000
|
$30.680
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
13.000
|
$1,800.000
|
$2,773.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,200.000
|
$1,740.500
|
|
|
MTL BM GD FEN TRANS (ANCHOR PLATE)
|
EA
|
13.000
|
$300.000
|
$767.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,308.000
|
$3.000
|
$2.360
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$200.000
|
$236.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$2,700.000
|
$3,953.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
5.000
|
$250.000
|
$236.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
6.000
|
$650.000
|
$1,180.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
60.000
|
$20.000
|
$29.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
38.000
|
$25.000
|
$59.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,100.000
|
$1.000
|
$1.200
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
48.000
|
$1.100
|
$1.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
2,925.000
|
$0.300
|
$1.180
|
|
REFL PAV MRK TY I (Y)8"(SLD)(090MIL)
|
LF
|
90.000
|
$0.900
|
$1.180
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
3,230.000
|
$0.250
|
$1.180
|
|
|
PAVEMENT SEALER 6"
|
LF
|
9,348.000
|
$0.250
|
$0.240
|
|
|
PAVEMENT SEALER 8"
|
LF
|
1,643.000
|
$0.320
|
$0.370
|
|
|
PAVEMENT SEALER 24"
|
LF
|
198.000
|
$3.500
|
$2.360
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
4,290.000
|
$0.600
|
$0.830
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
15,266.000
|
$0.600
|
$0.830
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
14,820.000
|
$0.400
|
$0.830
|
|
PREFAB PAV MRK TY C (W) (12") (SLD)
|
LF
|
183.000
|
$10.000
|
$9.440
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
608.000
|
$5.000
|
$17.700
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
4.000
|
$220.000
|
$324.500
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
4.000
|
$255.000
|
$413.000
|
|
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
|
EA
|
16.000
|
$30.000
|
$88.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
10.000
|
$3.300
|
$5.900
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
441.000
|
$3.600
|
$5.900
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
9,348.000
|
$1.000
|
$0.410
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,643.000
|
$1.000
|
$0.830
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
198.000
|
$4.250
|
$2.360
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
2.000
|
$100.000
|
$59.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
|
LF
|
598.000
|
$1.500
|
$10.000
|
|
|
VEH LP DETECT (SAWCUT)(14 AWG)(BLK)
|
LF
|
110.000
|
$4.000
|
$50.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
3,682.000
|
$190.000
|
$275.000
|
|
|
BONDING COURSE
|
GAL
|
2,144.000
|
$4.200
|
$6.000
|
|
|
TMA (STATIONARY)
|
DAY
|
100.000
|
$225.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
11.000
|
$275.000
|
$250.000
|
|
Totals: |
$2,188,623.440
|
$2,981,834.520
|