WICHITA US 82 (0156-04-125)

Items: 41

County: WICHITA
Length: N/A
Highway: US 82
District: WICHITA FALLS
Control Number: 0156-04-125
DBE Goal: N/A
Project: F 2021(418)
Guaranty: N/A
Time: 102 WORKING DAYS
Engineer's Estimate: $7,762,754.09
Date: 03/05/2021 (5 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (6)
E
Engineer's Estimate
$7,762,754.09
$7,059,433.85
Over/Under Est: -9.06% -$703,320.24
$7,605,736.61
Over/Under Est: -2.02% -$157,017.48
Amt Left: 7.74% $546,302.76
$7,769,229.60
Over/Under Est: 0.08% $6,475.51
Amt Left: 10.05% $709,795.75
Delta: -2.15% -$163,492.99
Over/Under Est: 5.52% $428,678.21
Amt Left: 16.04% $1,131,998.45
Delta: -5.43% -$422,202.70
Over/Under Est: 7.21% $559,534.12
Amt Left: 17.89% $1,262,854.36
Delta: -1.60% -$130,855.91
$9,280,465.81
Over/Under Est: 19.55% $1,517,711.72
Amt Left: 31.46% $2,221,031.96
Delta: -11.51% -$958,177.60

Bid Items & Bid Tabulations

41 Total 0 of 41
WICHITA  |  US 82  |  WICHITA FALLS  |  0156-04-125  |  03/05/2021  |  $7,762,754.09  |  F 2021(418)  |  RESURF ROADWAY  |  102 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
ZACK BURKETT CO.
DUININCK, INC.
ANGEL BROTHERS HOLDINGS CORP.
EUROVIA ATLANTIC COAST LLC
RK HALL, LLC
REMOVING CONCRETE(MOW STRIP)
LF 5,650.000 $7.500 $8.000 $9.360 $7.750 $5.500 $8.000 $8.600
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 217.000 $30.000 $28.000 $20.000 $23.000 $55.000 $90.000 $38.530
BACKFILL (TY B)
STA 1,090.000 $150.000 $180.000 $275.000 $200.000 $295.000 $185.000 $225.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 36,435.000 $105.000 $96.000 $112.500 $103.000 $111.000 $116.000 $131.880
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 8,231.000 $45.000 $59.000 $48.800 $63.500 $47.000 $45.000 $58.360
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 18,203.000 $4.000 $1.900 $2.000 $2.400 $2.600 $2.250 $2.950
RIPRAP (MOW STRIP)(4 IN)
CY 272.000 $450.000 $525.000 $597.000 $560.000 $650.000 $530.000 $715.000
MOBILIZATION
LS 1.000 $703,205.840 $437,000.000 $180,000.000 $480,000.000 $760,000.000 $800,000.000 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $6,000.000 $7,000.000 $4,960.000 $18,000.000 $7,300.000 $14,500.000 $14,844.910
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 5,675.000 $3.000 $3.200 $3.800 $3.400 $3.800 $3.450 $3.800
BIODEG EROSN CONT LOGS (REMOVE)
LF 5,675.000 $0.500 $0.750 $0.880 $0.770 $1.000 $0.700 $0.770
RUMBLE STRIPS (SHOULDER)
LF 184,050.000 $0.150 $0.100 $0.160 $0.110 $0.140 $0.170 $0.150
MTL W-BEAM GD FEN (TIM POST)
LF 4,875.000 $20.000 $19.000 $23.400 $19.000 $20.000 $20.000 $23.100
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $1,800.000 $1,400.000 $2,223.000 $1,700.000 $1,900.000 $1,900.000 $1,705.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 9.000 $1,150.000 $1,100.000 $1,872.000 $1,000.000 $1,000.000 $1,600.000 $1,402.500
REMOVE METAL BEAM GUARD FENCE
LF 4,400.000 $2.500 $2.100 $1.760 $2.050 $1.000 $1.500 $3.300
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $200.000 $210.000 $234.000 $205.000 $100.000 $200.000 $137.500
GUARDRAIL END TREATMENT (INSTALL)
EA 13.000 $2,500.000 $2,700.000 $2,750.000 $2,700.000 $2,300.000 $2,350.000 $2,667.500
GUARDRAIL END TREATMENT (REMOVE)
EA 13.000 $100.000 $210.000 $263.000 $205.000 $130.000 $225.000 $275.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 16.000 $20.000 $25.000 $35.000 $24.500 $16.000 $30.000 $30.800
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 16.000 $20.000 $25.000 $35.000 $24.500 $16.000 $30.000 $30.800
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 49.000 $25.000 $35.000 $47.000 $34.500 $20.000 $40.000 $49.500
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 18.000 $25.000 $35.000 $47.000 $34.500 $20.000 $40.000 $49.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 8,176.000 $1.000 $0.850 $1.000 $1.200 $0.600 $1.250 $1.830
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 24,885.000 $0.850 $0.700 $0.760 $0.690 $0.700 $0.650 $0.750
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 800.000 $0.850 $0.700 $1.170 $0.690 $0.700 $1.000 $0.750
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 180.000 $3.500 $11.000 $4.680 $10.000 $10.000 $4.000 $11.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 27,229.000 $0.500 $0.350 $0.510 $0.350 $0.350 $0.440 $0.370
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 108,910.000 $0.500 $0.350 $0.440 $0.350 $0.350 $0.380 $0.370
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 108,525.000 $0.500 $0.350 $0.440 $0.350 $0.350 $0.380 $0.370
PREFAB PAV MRK TY C (W) (ARROW)
EA 39.000 $300.000 $260.000 $210.600 $255.000 $250.000 $180.000 $275.000
PREFAB PAV MRK TY C (W) (WORD)
EA 39.000 $500.000 $364.000 $257.400 $355.000 $350.000 $220.000 $385.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 144.000 $60.000 $32.000 $39.200 $30.500 $30.000 $33.500 $33.000
REFL PAV MRKR TY I-C
EA 20.000 $5.000 $3.100 $4.680 $3.050 $3.000 $4.000 $3.300
REFL PAV MRKR TY II-A-A
EA 68.000 $5.000 $3.100 $4.680 $3.050 $3.000 $4.000 $3.300
REFL PAV MRKR TY II-C-R
EA 1,372.000 $4.000 $3.100 $3.740 $3.050 $3.000 $3.200 $3.300
D-GR HMA TY-D PG70-22
TON 20,576.000 $90.000 $82.000 $87.450 $94.500 $92.000 $89.000 $106.490
BONDING COURSE
GAL 31,648.000 $3.500 $3.300 $3.250 $2.800 $3.000 $3.750 $5.510
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $100.000 $200.000 $25.000 $76.500 $150.000 $100.000 $98.090
TMA (STATIONARY)
DAY 113.000 $200.000 $150.000 $25.000 $190.000 $90.000 $325.000 $400.100
TMA (MOBILE OPERATION)
DAY 27.000 $300.000 $20.000 $1.000 $810.000 $90.000 $575.000 $855.190
Totals: $7,762,754.090 $7,059,433.850 $7,605,736.610 $7,769,229.600 $8,191,432.300 $8,322,288.210 $9,280,465.810