Show Job Controls
Bid Cobra

WICHITA US 287 (0043-09-137)

Items: 46

County: WICHITA
Length: N/A
Highway: US 287
District: WICHITA FALLS
Control Number: 0043-09-137
DBE Goal: N/A
Project: NH 2019(331)
Guaranty: N/A
Time: 128 WORKING DAYS
Engineer's Estimate: $6,566,972.49
Date: 01/08/2019 (7 years ago)
Contract Number: N/A
Type: MILL AND OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$6,566,972.49
$6,221,093.62
Over/Under Est: -5.27% -$345,878.87
$7,358,390.00
Over/Under Est: 12.05% $791,417.51
Amt Left: 18.28% $1,137,296.38

Bid Items & Bid Tabulations

46 Total 0 of 46
WICHITA  |  US 287  |  WICHITA FALLS  |  0043-09-137  |  01/08/2019  |  $6,566,972.49  |  NH 2019(331)  |  MILL AND OVERLAY  |  128 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ZACK BURKETT CO.
DUININCK, INC.
REMOVING CONC (RIPRAP)
SY 20.000 $35.000 $236.000 $215.000
REMOVING CONC (CTB)
LF 50.000 $25.000 $118.000 $105.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 49.000 $75.000 $29.500 $46.500
BACKFILL (TY B)
STA 282.000 $250.000 $225.000 $130.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 1,340.000 $2.000 $1.950 $1.750
VEGETATIVE WATERING
MG 10.000 $90.000 $35.000 $28.000
D-GR HMA TY-D SAC-B PG70-28
TON 28,189.000 $92.000 $87.500 $105.000
PFC (ASPHALT) PG76-22
TON 1,389.000 $565.000 $650.000 $640.000
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
TON 21,767.000 $72.000 $64.000 $80.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 100.000 $175.000 $54.000 $125.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 6,325.000 $25.000 $20.700 $32.000
PLANE ASPH CONC PAV(0" TO 2")
SY 18,273.000 $2.250 $4.900 $2.650
PLANE ASPH CONC PAV(0" TO 6")
SY 4,391.000 $5.750 $8.000 $6.000
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 10,096.000 $3.900 $4.130 $2.300
PLANE ASPH CONC PAV (3/4")
SY 56,643.000 $0.750 $1.480 $1.300
RIPRAP CONC (8 IN)
CY 5.000 $750.000 $885.000 $800.000
RIPRAP (MOW STRIP)(4 IN)
CY 51.000 $450.000 $826.000 $640.000
MOBILIZATION
LS 1.000 $591,979.000 $220,060.000 $470,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $6,900.000 $3,900.000 $21,000.000
PERM CTB (F-SHAPE) (TY 1)
LF 50.000 $175.000 $413.000 $370.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 144,440.000 $0.120 $0.210 $0.110
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 24,672.000 $0.120 $0.250 $0.190
MTL W-BEAM GD FEN (TIM POST)
LF 575.000 $25.000 $28.320 $22.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $1,850.000 $2,478.000 $1,900.000
REMOVE METAL BEAM GUARD FENCE
LF 675.000 $3.000 $4.720 $4.250
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $2,400.000 $3,658.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $250.000 $472.000 $425.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 41.000 $650.000 $1,386.500 $885.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 136.000 $625.000 $1,062.000 $595.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 18.000 $27.500 $41.300 $25.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,695.000 $1.500 $1.000 $1.050
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,529.000 $1.500 $1.000 $1.050
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 11,674.000 $1.050 $1.040 $0.940
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 36.000 $15.000 $7.900 $7.150
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 122.000 $65.000 $70.000 $64.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 22,803.000 $0.470 $0.530 $0.480
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 131,854.000 $0.330 $0.510 $0.460
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 6,100.000 $0.400 $0.530 $0.480
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 102,548.000 $0.290 $0.510 $0.460
REFL PAV MRKR TY I-C
EA 128.000 $4.900 $11.800 $10.500
REFL PAV MRKR TY II-A-A
EA 430.000 $3.500 $4.720 $4.250
REFL PAV MRKR TY II-C-R
EA 1,034.000 $3.900 $4.720 $4.250
MEMBRANE UNDERSEAL
GAL 83,245.000 $2.300 $2.360 $2.650
BONDING COURSE
GAL 1,265.000 $4.750 $3.790 $4.250
TMA (STATIONARY)
DAY 76.000 $225.000 $177.000 $255.000
TMA (MOBILE OPERATION)
DAY 66.000 $475.000 $29.500 $905.000
Totals: $6,566,972.490 $6,221,093.620 $7,358,390.000