Show Job Controls
Bid Cobra

WICHITA US 287 (0043-08-088)

Items: 90

County: WICHITA
Length: N/A
Highway: US 287
District: WICHITA FALLS
Control Number: 0043-08-088
DBE Goal: 0.0%
Project: STP 2024(778)TP
Guaranty: N/A
Time: 136 WORKING DAYS
Engineer's Estimate: $4,812,414.44
Date: 03/05/2024 (2 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
CALLAN COLTHARP
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$4,812,414.44
$5,428,567.96
Over/Under Est: 12.8% $616,153.52
Over/Under Est: 21.25% $1,022,762.53
Amt Left: 7.49% $406,609.01
Subcontractor Percentage Amount
W. S. CONSTRUCTION COMPANY 37.48% $2,034,627.27
MICA CORPORATION 10.12% $549,371.08
LANCO TURF & SEEDING, INC. 0.66% $35,828.55
KING GEORGE TRAFFIC SOLUTIONS LLC 0.65% $35,285.69
TRP CONSTRUCTION GROUP, LLC 0.64% $34,742.83
MARCOM'S MOWING SERVICE, LLC 0.39% $21,171.42
BARRICADES UNLIMITED 0.37% $20,085.70
MCCAULEY LANDSCAPES, LLC 0.11% $5,971.42
Total: 50.42% $2,737,083.96

Bid Items & Bid Tabulations

90 Total 0 of 90
WICHITA  |  US 287  |  WICHITA FALLS  |  0043-08-088  |  03/05/2024  |  $4,812,414.44  |  STP 2024(778)TP  |  HWY IMPRV  |  136 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
O. TREVINO CONSTRUCTION, LLC
PREP ROW (TREE)(LESS THAN 24" DIA)
EA 7.000 $1,450.000 $2,000.000 $1,500.000
REMOVING CONC (SIDEWALKS)
SY 83.000 $70.000 $16.000 $20.000
REMOVING CONC (CURB)
LF 2,357.000 $23.000 $12.000 $20.000
REMOVE STAB BASE & ASPH PAV (13"-18")
SY 7,350.000 $30.000 $35.500 $25.000
EXCAVATION (ROADWAY)
CY 6,722.000 $20.000 $42.000 $35.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 2,336.000 $25.000 $32.000 $25.000
FURNISHING AND PLACING TOPSOIL (4")
SY 11,287.000 $4.000 $6.000 $3.000
BLOCK SODDING
SY 1,331.000 $10.000 $4.500 $7.650
BROADCAST SEED (TEMP) (WARM)
SY 5,644.000 $1.400 $0.190 $0.500
BROADCAST SEED (TEMP) (COOL)
SY 5,644.000 $1.500 $0.200 $0.500
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 9,956.000 $0.440 $0.250 $0.420
FERTILIZER
AC 1.460 $4,200.000 $610.000 $355.000
VEGETATIVE WATERING
MG 139.560 $75.000 $40.000 $380.000
PLANT MATERIAL (3-GAL)
EA 1.000 $30.000 $75.000 $4,400.000
PLANT MATERIAL (30-GAL)
EA 4.000 $425.000 $1,700.000 $4,750.000
PLANT MATERIAL (45-GAL)
EA 2.000 $625.000 $2,000.000 $9,700.000
CEMENT
TON 188.000 $485.000 $340.000 $500.000
CEMENT TREAT (SUBGRADE) (8")
SY 4,046.000 $6.000 $13.000 $18.000
CEMENT TREAT (SUBGRADE)(6")
SY 17,390.000 $6.000 $12.500 $18.000
CONC PVMT (CONT REINF - CRCP) (10")
SY 16,658.000 $120.000 $125.000 $130.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 264.000 $450.000 $370.000 $400.000
CL C CONC (MISC)
CY 1.140 $11,250.000 $2,000.000 $3,000.000
RIPRAP (CONC)(4 IN)
CY 83.000 $750.000 $850.000 $575.000
GRATE & FRAME
EA 3.000 $1,800.000 $3,200.000 $6,200.000
MOBILIZATION
LS 1.000 $440,000.000 $520,000.000 $580,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $10,000.000 $19,000.000 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 60.000 $68.000 $65.000 $41.000
ROCK FILTER DAMS (REMOVE)
LF 60.000 $22.000 $31.000 $26.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 224.000 $44.000 $30.000 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 224.000 $15.000 $12.000 $18.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 360.000 $8.000 $8.000 $7.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 360.000 $3.000 $2.300 $2.300
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 480.000 $9.300 $7.000 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 480.000 $3.500 $1.200 $1.100
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 2,100.000 $78.000 $108.000 $105.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 2,100.000 $16.000 $36.000 $30.000
CONC CURB (MONO) (TY II)
LF 4,860.000 $10.000 $20.000 $13.000
CONC SIDEWALKS (4")
SY 330.000 $90.000 $120.000 $100.000
CURB RAMPS (TY 2)
EA 3.000 $3,060.000 $2,000.000 $4,200.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,950.000 $1,100.000 $500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $11,700.000 $12,000.000 $10,000.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 4.000 $3,940.000 $4,000.000 $10,000.000
CONDT (PVC) (SCH 40) (2")
LF 4,180.000 $22.500 $25.000 $34.000
ELEC CONDR (NO.6) INSULATED
LF 11,665.000 $3.300 $3.600 $3.700
GROUND BOX TY A (122311)W/APRON
EA 5.000 $1,765.000 $2,600.000 $3,250.000
REMOVE GROUND BOX
EA 7.000 $41.000 $550.000 $785.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $1,135.000 $800.000 $840.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 18.000 $750.000 $530.000 $560.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 13.000 $740.000 $630.000 $665.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $820.000 $620.000 $650.000
RELOCATE SM RD SN SUP&AM TY TWT
EA 4.000 $770.000 $560.000 $650.000
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 1.000 $305.000 $330.000 $345.000
REMOVE SM RD SN SUP&AM
EA 9.000 $185.000 $120.000 $123.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 17.000 $102.000 $60.000 $62.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 94.000 $5.750 $4.000 $9.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 3,746.000 $1.050 $0.650 $1.600
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 331.000 $2.200 $2.300 $6.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,065.000 $2.000 $2.500 $6.700
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 681.000 $5.450 $3.000 $8.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 9.000 $75.000 $55.000 $128.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 2,825.000 $1.000 $0.700 $1.800
REFL PAV MRK TY II (W) 8" (SLD)
LF 1,065.000 $1.100 $0.900 $2.150
REFL PAV MRK TY II (W) 12" (SLD)
LF 681.000 $3.600 $1.000 $2.300
PAVEMENT SEALER 6"
LF 455.000 $1.100 $0.800 $2.100
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 2,825.000 $1.450 $1.200 $3.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 455.000 $1.250 $1.300 $3.700
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 1,908.000 $1.300 $1.200 $3.300
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 77.000 $1.350 $1.200 $3.300
REFL PAV MRKR TY II-C-R
EA 79.000 $7.700 $6.000 $14.500
ELIM EXT PAV MRK & MRKS (4")
LF 3,738.000 $1.000 $0.500 $1.100
PAV SURF PREP FOR MRK (4")
LF 2,825.000 $0.550 $0.400 $1.200
PAV SURF PREP FOR MRK (8")
LF 848.000 $0.500 $0.450 $1.250
PAV SURF PREP FOR MRK (12")
LF 799.000 $1.000 $0.500 $1.250
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 9.000 $23.000 $11.000 $21.000
TREE PROTECTION
EA 5.000 $350.000 $1,400.000 $875.000
D-GR HMA TY-B PG70-22
TON 2,142.000 $215.000 $163.000 $240.000
D-GR HMA TY-D PG70-28
TON 410.000 $215.000 $187.000 $260.000
BONDING COURSE
GAL 308.000 $14.000 $7.500 $7.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $210.000 $300.000 $200.000
FIBER OPTIC CBL (MULTI-MODE)(6 FIBER)
LF 290.000 $4.750 $25.000 $14.000
FIBER OPTIC SPLICE ENCLOSURE
EA 1.000 $2,260.000 $1,500.000 $3,800.000
MODIFY EXISTING ELECTRICAL SERVICE
EA 2.000 $1,680.000 $1,500.000 $4,800.000
REMOVE EXISTING CABLES (FIBER)
LF 755.000 $0.650 $2.500 $21.000
REMOVE EXISTING CABLES (POWER)
LF 4,335.000 $3.600 $1.500 $1.200
TMA (STATIONARY)
DAY 28.000 $395.000 $250.000 $300.000
TMA (MOBILE OPERATION)
DAY 28.000 $430.000 $250.000 $600.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 4.000 $5,705.000 $9,000.000 $6,800.000
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
EA 1.000 $9,100.000 $12,000.000 $8,000.000
AESTHETIC LIGHTING FIXTURE & POLE
EA 33.000 $3,018.000 $5,000.000 $5,300.000
AESTHTIC LGHT FIXTURE & POLE (LUM ONLY)
EA 1.000 $1,210.000 $2,500.000 $2,500.000
Totals: $4,812,414.440 $5,428,567.960 $5,835,176.970