WICHITA US 287 (0043-08-085)

Items: 48

County: WICHITA
Length: N/A
Highway: US 287
District: WICHITA FALLS
Control Number: 0043-08-085
DBE Goal: N/A
Project: F 2021(514)
Guaranty: N/A
Time: 85 WORKING DAYS
Engineer's Estimate: $3,319,373.69
Date: 05/06/2021 (5 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (2)
E
Engineer's Estimate
$3,319,373.69
$3,141,097.74
Over/Under Est: -5.37% -$178,275.95
$3,371,480.18
Over/Under Est: 1.57% $52,106.49
Amt Left: 7.33% $230,382.44

Bid Items & Bid Tabulations

48 Total 0 of 48
WICHITA  |  US 287  |  WICHITA FALLS  |  0043-08-085  |  05/06/2021  |  $3,319,373.69  |  F 2021(514)  |  REHAB EXIST ROADWAY  |  85 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ZACK BURKETT CO.
A. L. HELMCAMP, INC.
REMOVING CONC (RIPRAP)
SY 167.000 $22.000 $20.000 $20.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 87.000 $29.000 $40.000 $30.000
BACKFILL (TY A OR B)
STA 522.000 $150.000 $105.000 $50.000
ASPH (AC-20-5TR)
GAL 83,721.000 $3.000 $3.070 $3.100
AGGR(TY-PB GR-4 SAC-B)
CY 1,695.000 $100.000 $121.000 $125.000
PFC (ASPHALT) PG76-22
TON 758.000 $110.000 $707.000 $760.000
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
TON 11,864.000 $110.000 $62.500 $69.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 5,334.000 $65.000 $65.000 $68.000
FLEX PAVEMENT STRUCTURE REPAIR (2"-6")
SY 210.000 $50.000 $48.000 $60.000
PLANE ASPH CONC PAV(0" TO 2")
SY 150,837.000 $2.000 $1.290 $2.700
RIPRAP (MOW STRIP)(4 IN)
CY 87.000 $375.000 $826.000 $682.500
MOBILIZATION
LS 1.000 $300,000.000 $168,880.000 $125,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $6,000.000 $1,975.000 $5,000.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,910.000 $3.440 $3.250 $2.300
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,910.000 $0.830 $0.890 $0.680
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 2,360.000 $40.000 $88.500 $80.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 2,360.000 $7.250 $14.160 $10.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 2,360.000 $12.000 $17.700 $15.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 30.000 $110.000 $649.000 $577.500
RUMBLE STRIPS (SHOULDER)
LF 99,215.000 $0.250 $0.130 $0.110
MTL W-BEAM GD FEN (TIM POST)
LF 1,025.000 $23.000 $33.000 $24.680
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $1,840.000 $2,360.000 $1,957.200
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 6.000 $1,218.000 $1,770.000 $1,239.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 1.000 $1,200.000 $1,888.000 $913.500
REMOVE METAL BEAM GUARD FENCE
LF 502.000 $3.000 $3.540 $2.630
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $254.000 $354.000 $157.500
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $2,700.000 $3,717.000 $3,040.800
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $300.000 $354.000 $210.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1,906.000 $2,950.000 $320.250
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,195.000 $1,770.000 $183.750
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $9,160.000 $8,850.000 $9,607.500
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 63.000 $24.000 $23.600 $26.250
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 63.000 $17.500 $23.600 $26.250
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 14.000 $35.000 $47.200 $31.500
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 6.000 $35.000 $47.200 $31.500
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 26,522.000 $0.260 $0.300 $0.150
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 2,000.000 $0.220 $0.300 $0.150
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,293.000 $1.500 $1.000 $0.470
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 6,263.000 $1.250 $1.000 $0.890
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 13,261.000 $0.610 $0.420 $0.400
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 53,041.000 $0.620 $0.400 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 53,041.000 $0.630 $0.400 $0.400
REFL PAV MRKR TY II-C-R
EA 978.000 $4.070 $4.130 $3.680
CONCRETE RAIL REPAIR (IN-KIND)
LF 3.000 $300.000 $737.500 $656.250
BONDING COURSE
GAL 10,629.000 $3.650 $3.250 $3.500
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 44.000 $119.000 $100.000 $150.000
TMA (STATIONARY)
DAY 27.000 $300.000 $150.000 $400.000
TMA (MOBILE OPERATION)
DAY 7.000 $450.000 $125.000 $850.000
Totals: $3,319,373.690 $3,141,097.740 $3,371,480.180