WHEELER IH 40 (0275-12-085)

Items: 46

County: WHEELER
Length: N/A
Highway: IH 40
District: CHILDRESS
Control Number: 0275-12-085
DBE Goal: 300.0%
Project: F 2024(846)
Guaranty: N/A
Time: 193 WORKING DAYS
Engineer's Estimate: $3,795,407.50
Date: 04/04/2024 (2 years ago)
Contract Number: N/A
Type: REPLACE GUARDRAIL
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$3,795,407.50
1
$3,449,940.40
Over/Under Est: -9.1% -$345,467.10
$3,911,868.32
Over/Under Est: 3.07% $116,460.82
Amt Left: 13.39% $461,927.92
Over/Under Est: 9.05% $343,658.50
Amt Left: 19.98% $689,125.60
Delta: -5.81% -$227,197.68
Over/Under Est: 25.35% $962,232.60
Amt Left: 37.9% $1,307,699.70
Delta: -14.94% -$618,574.10
Subcontractor Percentage Amount
JB PINNACLE GROUP, LLC 13.30% $469,415.57
STRUCTURAL INTEGRITY GROUP LLC 12.44% $439,062.39
MACIAS SPECIALTY CONTRACTING LLC 6.37% $224,825.35
KING GEORGE TRAFFIC SOLUTIONS LLC 1.40% $49,412.17
BARRICADES UNLIMITED 0.84% $29,647.30
TRP CONSTRUCTION GROUP, LLC 0.35% $12,353.04
Total: 34.70% $1,224,715.82

Bid Items & Bid Tabulations

46 Total 0 of 46
WHEELER  |  IH 40  |  CHILDRESS  |  0275-12-085  |  04/04/2024  |  $3,795,407.50  |  F 2024(846)  |  REPLACE GUARDRAIL  |  193 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
3LW CIVIL LLC
HJC FARMS, INC.
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
GIBSON & ASSOCIATES, INC.
REMOVING CONC (RIPRAP)
SY 243.000 $45.000 $40.000 $95.000 $100.000 $95.000
FLOWABLE BACKFILL
CY 30.000 $500.000 $750.000 $900.000 $350.000 $800.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 1,643.000 $35.000 $11.000 $12.400 $20.000 $11.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 127.000 $220.000 $247.500 $260.000 $300.000 $231.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 175.000 $190.000 $247.500 $161.000 $335.000 $143.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 201.000 $250.000 $247.500 $266.000 $325.000 $236.500
RIPRAP (CONC)(4 IN)
CY 5.000 $1,200.000 $750.000 $562.500 $1,000.000 $1,500.000
RIPRAP (MOW STRIP)(4 IN)
CY 822.000 $560.000 $550.000 $562.500 $700.000 $950.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 948.000 $70.000 $47.300 $48.000 $60.000 $65.000
CLEANING AND SEALING JOINTS (CL 3)
LF 701.000 $35.000 $47.300 $65.000 $60.000 $47.000
MULTI-LAYER POLYMER OVERLAY
SY 3,709.000 $60.000 $43.750 $57.000 $65.000 $55.000
RETROFIT RAIL (TY SSTR)
LF 1,998.000 $270.000 $242.000 $325.000 $300.000 $325.000
HEADER TYPE EXPANSION JOINT
LF 7.000 $200.000 $577.500 $282.000 $600.000 $250.000
SHOT BLASTING
SY 3,709.000 $6.000 $6.600 $5.630 $8.000 $10.000
MOBILIZATION
LS 1.000 $345,000.000 $338,980.000 $450,000.000 $400,000.000 $650,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $10,000.000 $8,500.000 $3,000.000 $3,000.000 $12,900.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 150.000 $5.000 $0.100 $7.000 $5.000 $6.600
TEMP SEDMT CONT FENCE (REMOVE)
LF 150.000 $5.000 $0.100 $1.000 $1.000 $1.650
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 750.000 $10.000 $0.100 $9.000 $15.000 $11.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 3,200.000 $100.000 $55.000 $105.000 $110.000 $110.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 6,400.000 $12.000 $22.000 $18.000 $15.000 $24.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 3,200.000 $10.000 $35.000 $25.000 $20.000 $38.500
MTL W-BEAM GD FEN (STEEL POST)
LF 15,275.000 $20.000 $30.000 $28.250 $38.000 $32.480
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 15.000 $2,500.000 $2,420.000 $2,500.000 $3,000.000 $2,688.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 26.000 $1,600.000 $1,350.000 $1,450.000 $1,700.000 $1,680.000
REMOVE METAL BEAM GUARD FENCE
LF 15,625.000 $4.500 $1.250 $3.000 $4.000 $3.360
REMOVE TERMINAL ANCHOR SECTION
EA 30.000 $300.000 $250.000 $300.000 $300.000 $336.000
GUARDRAIL END TREATMENT (INSTALL)
EA 42.000 $3,900.000 $3,400.000 $3,325.000 $4,000.000 $3,354.400
GUARDRAIL END TREATMENT (REMOVE)
EA 32.000 $350.000 $250.000 $300.000 $300.000 $336.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $3,500.000 $1,500.000 $2,500.000 $2,200.000 $5,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $2,500.000 $1,250.000 $1,500.000 $1,500.000 $5,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $11,000.000 $9,000.000 $8,000.000 $11,000.000 $15,000.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 11,160.000 $1.500 $0.830 $0.900 $1.000 $0.830
REFL PAV MRK TY II (Y) 4" (SLD)
LF 11,160.000 $1.500 $0.830 $0.900 $1.000 $0.830
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 990.000 $1.200 $1.210 $1.320 $1.200 $2.200
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 3,600.000 $1.200 $1.210 $1.320 $1.200 $1.210
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 3,600.000 $1.200 $1.210 $1.320 $1.200 $1.210
TRAFFIC BUTTON TY W
EA 144.000 $10.000 $4.400 $4.800 $5.000 $4.400
TRAFFIC BUTTON TY Y
EA 144.000 $10.000 $4.400 $4.800 $5.000 $4.400
ELIM EXT PAV MRK & MRKS (4")
LF 14,835.000 $1.800 $0.500 $0.550 $0.600 $0.500
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 533.000 $65.000 $99.000 $140.500 $130.000 $125.000
CARBON FIBER REINF POLYMER PROTECTION
SF 1,131.000 $150.000 $92.400 $50.750 $80.000 $45.000
POLYESTER POLYMER CONC OVERLAY (3/4")
SY 1,787.000 $170.000 $122.100 $165.000 $100.000 $175.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $17,000.000 $8,500.000 $15,000.000 $10,200.000 $18,000.000
TMA (STATIONARY)
DAY 193.000 $290.000 $150.000 $100.000 $200.000 $50.000
TMA (MOBILE OPERATION)
HR 40.000 $100.000 $115.000 $100.000 $75.000 $100.000
Totals: $3,795,407.500 $3,449,940.400 $3,911,868.320 $4,139,066.000 $4,757,640.100