WHEELER IH 40 (0275-12-074)

Items: 52

County: WHEELER
Length: N/A
Highway: IH 40
District: CHILDRESS
Control Number: 0275-12-074
DBE Goal: N/A
Project: BR 2019(644)
Guaranty: N/A
Time: 208 WORKING DAYS
Engineer's Estimate: $4,723,031.60
Date: 03/05/2019 (7 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$4,723,031.60
$5,409,042.32
Over/Under Est: 14.52% $686,010.72
$5,764,905.66
Over/Under Est: 22.06% $1,041,874.06
Amt Left: 6.58% $355,863.34
Over/Under Est: 22.24% $1,050,562.00
Amt Left: 6.74% $364,551.28
Delta: -0.15% -$8,687.94

Bid Items & Bid Tabulations

52 Total 0 of 52
WHEELER  |  IH 40  |  CHILDRESS  |  0275-12-074  |  03/05/2019  |  $4,723,031.60  |  BR 2019(644)  |  BRIDGE MAINT  |  208 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GILVIN-TERRILL, LTD.
DCI CONTRACTING, INC.
SCR CIVIL CONSTRUCTION, LLC
REMOVING CONC (RIPRAP)
SY 1,140.000 $13.500 $25.000 $58.370 $30.000
REMOVE CONC (WINGWALL)
CY 1.600 $500.000 $1,200.000 $4,270.000 $4,800.000
REMOVE CONC (ABUTMENT BACKWALL)
CY 3.000 $1,000.000 $1,200.000 $2,684.030 $4,800.000
PLANE ASPH CONC PAV(0" TO 2")
SY 102.000 $4.500 $20.000 $73.200 $124.000
PAV JT UNDERSEAL (12")
LF 27.000 $55.000 $120.000 $90.380 $82.000
STRUCT EXCAV
CY 181.200 $12.000 $170.000 $67.350 $110.000
FLOWABLE BACKFILL
CY 194.500 $200.000 $280.000 $368.570 $425.000
TEMPORARY SPL SHORING
SF 262.000 $50.000 $40.000 $96.910 $75.000
CL B CONC (FLUME)
CY 30.000 $650.000 $1,300.000 $866.230 $1,914.000
CL C CONC (VEH DEFL WALL)(HPC)
CY 293.400 $1,900.000 $1,500.000 $1,737.820 $2,420.000
APPROACH SLAB (HPC)
CY 64.200 $800.000 $2,000.000 $967.700 $1,000.000
SILICONE RESIN PAINT FINISH
SF 8,970.000 $13.000 $5.300 $5.840 $8.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 344.000 $125.000 $165.000 $152.540 $135.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 14.000 $250.000 $140.000 $435.730 $160.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 1,620.000 $140.000 $180.000 $167.990 $125.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 1,818.000 $180.000 $110.000 $151.100 $135.000
RIPRAP (CONC)(4 IN)
CY 4.400 $800.000 $1,000.000 $976.000 $1,000.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 2,263.000 $100.000 $85.000 $168.240 $163.000
RIPRAP (MOW STRIP)(4 IN)
CY 251.000 $600.000 $550.000 $760.240 $854.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 530.000 $38.000 $40.000 $46.050 $31.000
MULTI-LAYER POLYMER OVERLAY
SY 4,801.000 $65.000 $31.000 $43.990 $39.000
RETROFIT RAIL (TY T221)(HPC)
LF 1,748.000 $225.000 $200.000 $258.990 $215.000
SHOT BLASTING
SY 4,801.000 $20.000 $3.000 $5.490 $7.000
REMOVE STR (CONC)
EA 2.000 $3,000.000 $2,000.000 $3,294.000 $3,300.000
MOBILIZATION
LS 1.000 $383,850.000 $500,000.000 $536,312.000 $265,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $5,000.000 $12,500.000 $17,527.990 $17,230.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 1,420.000 $18.000 $15.000 $20.200 $30.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 2,520.000 $10.000 $9.000 $17.340 $21.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 1,420.000 $13.000 $12.000 $20.200 $27.000
MTL W-BEAM GD FEN (STEEL POST)
LF 4,300.000 $28.000 $22.500 $35.320 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 20.000 $2,200.000 $2,175.000 $2,592.500 $2,500.000
REMOVE METAL BEAM GUARD FENCE
LF 4,300.000 $2.950 $4.000 $3.710 $4.400
GUARDRAIL END TREATMENT (INSTALL)
EA 20.000 $2,800.000 $2,675.000 $3,635.600 $2,950.000
GUARDRAIL END TREATMENT (REMOVE)
EA 28.000 $275.000 $400.000 $435.730 $440.000
CRASH CUSH ATTEN (INSTL)
EA 41.000 $11,500.000 $32,700.000 $25,284.980 $27,700.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 17.000 $1,200.000 $1,300.000 $2,152.950 $2,800.000
CRASH CUSH ATTEN (STKPL)
EA 9.000 $2,000.000 $700.000 $677.790 $1,115.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 2,540.000 $0.400 $2.500 $2.440 $2.200
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 2,820.000 $3.800 $3.550 $6.710 $6.100
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 2,820.000 $3.800 $4.800 $7.020 $6.300
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 3,918.000 $0.400 $3.750 $6.100 $5.500
ELIM EXT PAV MRK & MRKS (4")
LF 6,458.000 $1.000 $2.290 $2.760 $2.450
PAV SURF PREP FOR MRK (4")
LF 3,600.000 $1.000 $1.000 $3.050 $2.750
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 120.000 $85.000 $100.000 $103.700 $52.000
BRIDGE JOINT REPAIR (FULL DEPTH)
LF 1,402.000 $260.000 $300.000 $206.140 $320.000
BRIDGE JOINT REPLACEMENT (SEJ)
LF 78.000 $350.000 $400.000 $378.200 $286.000
CARBON FIBER REINF POLYMER PROTECTION
SF 3,575.000 $50.000 $65.000 $58.040 $46.400
REPLACE ELASTOMERIC BEARING PADS
EA 10.000 $3,500.000 $875.000 $2,770.620 $7,000.000
EMBEDDED GALVANIC ANODES
EA 1,984.000 $65.000 $30.000 $22.770 $20.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,000.000 $12,000.000 $18,300.000 $27,000.000
TMA (STATIONARY)
DAY 45.000 $350.000 $725.000 $542.230 $480.000
TMA (MOBILE OPERATION)
DAY 10.000 $1,000.000 $950.000 $976.000 $1,000.000
Totals: $4,723,031.600 $5,409,042.320 $5,764,905.673 $5,773,593.600