WHEELER US 83 (0031-01-022)

Items: 41

County: WHEELER
Length: N/A
Highway: US 83
District: CHILDRESS
Control Number: 0031-01-022
DBE Goal: N/A
Project: F 2023(283)
Guaranty: N/A
Time: 237 WORKING DAYS
Engineer's Estimate: $11,978,090.48
Date: 12/02/2022 (3 years ago)
Contract Number: N/A
Type: SUPER 2
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$11,978,090.48
$12,191,889.22
Over/Under Est: 1.78% $213,798.74
$12,542,620.35
Over/Under Est: 4.71% $564,529.87
Amt Left: 2.88% $350,731.13
$13,099,913.77
Over/Under Est: 9.37% $1,121,823.29
Amt Left: 7.45% $908,024.55
Delta: -4.44% -$557,293.42
$13,151,126.81
Over/Under Est: 9.79% $1,173,036.33
Amt Left: 7.87% $959,237.59
Delta: -0.39% -$51,213.04
Subcontractor Percentage Amount
HJC FARMS, INC. 1.87% $227,988.33
TEXAS PANHANDLE CONSTRUCTION, INC. 1.06% $129,234.03
TEXOP CONSTRUCTION 0.56% $68,274.58
H & F TRUCKING 0.41% $49,986.75
JENNINGS TRUCKING SERVICE, INC. 0.41% $49,986.75
FC TRAFFIC CONTROL, INC. 0.40% $48,767.56
RILEY INDUSTRIAL SERVICES, INC. 0.40% $48,767.56
WEST INFRASTRUCTURE CONSTRUCTION, LLC 0.24% $29,260.53
SURFACE PREPARATION TECHNOLOGIES, LLC 0.22% $26,822.16
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.21% $25,602.97
MOBILE ENTERPRISES, INC. 0.11% $13,411.08
Total: 5.89% $718,102.30

Bid Items & Bid Tabulations

41 Total 0 of 41
WHEELER  |  US 83  |  CHILDRESS  |  0031-01-022  |  12/02/2022  |  $11,978,090.48  |  F 2023(283)  |  SUPER 2  |  237 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DUININCK, INC.
J. LEE MILLIGAN, INC.
GILVIN-TERRILL, LTD.
RK HALL, LLC
EXCAVATION (ROADWAY)
CY 9,377.000 $10.000 $17.000 $18.150 $25.000 $15.170
SUBGRADE WIDENING (DENS CONT)
STA 437.000 $750.000 $520.000 $680.000 $550.000 $1,205.030
EMBANKMENT (FINAL)(ORD COMP)(TY D)
CY 15,925.000 $19.000 $28.500 $19.900 $25.000 $19.570
BACKFILL (TY A OR B)
STA 647.000 $150.000 $335.000 $130.000 $140.000 $251.130
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 25.170 $700.000 $495.000 $485.000 $460.000 $515.200
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 25.170 $700.000 $505.000 $495.000 $470.000 $526.400
VEGETATIVE WATERING
MG 2,048.100 $18.500 $26.500 $20.000 $28.000 $23.710
PROOF ROLLING
HR 30.000 $100.000 $165.000 $265.000 $55.000 $238.800
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 76,025.000 $2.000 $2.500 $4.750 $3.850 $4.510
PLANE ASPH CONC PAV(0" TO 2")
SY 7,245.000 $3.770 $5.000 $4.700 $7.500 $3.750
PLANE ASPH CONC PAV (2")
SY 3,660.000 $5.000 $8.050 $6.100 $7.500 $4.560
RIPRAP (MOW STRIP)(4 IN)
CY 132.000 $800.000 $700.000 $685.000 $650.000 $728.000
CLEAN EXIST CULVERTS
EA 20.000 $3,000.000 $3,800.000 $1,800.000 $1,000.000 $2,900.780
MOBILIZATION
LS 1.000 $1,100,000.000 $970,000.000 $1,250,000.000 $1,300,000.000 $526,045.070
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $10,000.000 $17,000.000 $40,000.000 $30,000.000 $14,054.550
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 299.000 $7.000 $9.350 $8.700 $8.700 $9.740
RUMBLE STRIPS (SHOULDER)
LF 130,964.000 $0.150 $0.100 $0.250 $0.280 $0.100
RUMBLE STRIPS (CENTERLINE)
LF 65,482.000 $0.150 $0.200 $0.250 $0.280 $0.100
MTL W-BEAM GD FEN (STEEL POST)
LF 1,950.000 $35.000 $35.500 $35.000 $33.000 $36.960
REMOVE METAL BEAM GUARD FENCE
LF 1,950.000 $4.000 $2.950 $3.000 $2.750 $3.080
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,500.000 $3,600.000 $3,560.000 $3,375.000 $3,780.000
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $400.000 $295.000 $290.000 $275.000 $308.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $900.000 $915.000 $900.000 $850.000 $952.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $900.000 $1,000.000 $1,030.000 $975.000 $1,092.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $900.000 $1,400.000 $1,375.000 $1,300.000 $1,456.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 8.000 $800.000 $805.000 $790.000 $750.000 $840.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,296.000 $1.000 $1.150 $1.600 $3.500 $1.980
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,739.000 $1.000 $1.150 $1.650 $3.500 $1.980
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 4,575.000 $0.900 $1.100 $0.600 $0.570 $1.120
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 10.000 $480.000 $1,000.000 $370.000 $350.000 $1,064.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 13,613.000 $0.450 $0.430 $0.510 $0.480 $0.450
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 126,435.000 $0.350 $0.430 $0.510 $0.480 $0.450
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 7,388.000 $0.450 $0.420 $0.600 $0.570 $0.440
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 119,751.000 $0.350 $0.420 $0.520 $0.490 $0.440
REFL PAV MRKR TY I-C
EA 633.000 $4.250 $3.750 $4.250 $4.000 $3.920
REFL PAV MRKR TY II-A-A
EA 1,694.000 $3.750 $3.750 $4.250 $4.000 $3.920
D-GR HMA TY-B PG70-28
TON 22,406.000 $135.000 $130.000 $130.000 $140.000 $152.210
D-GR HMA TY-D SAC-A PG70-28
TON 42,043.000 $140.000 $139.450 $131.000 $142.000 $155.070
TACK COAT
GAL 50,751.000 $4.500 $4.750 $6.650 $5.000 $5.440
TMA (STATIONARY)
DAY 230.000 $157.000 $270.000 $480.000 $480.000 $466.750
TMA (MOBILE OPERATION)
HR 210.000 $35.000 $97.000 $85.000 $95.000 $83.930
Totals: $11,978,126.700 $12,191,889.220 $12,542,620.350 $13,099,913.770 $13,151,126.823