Show Job Controls
Bid Cobra

WHEELER US 83 (0030-08-038)

Items: 63

County: WHEELER
Length: N/A
Highway: US 83
District: CHILDRESS
Control Number: 0030-08-038
DBE Goal: N/A
Project: BR 2023(936)
Guaranty: N/A
Time: 354 WORKING DAYS
Engineer's Estimate: $11,343,321.24
Date: 06/28/2023 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$11,343,321.24
$14,263,414.50
Over/Under Est: 25.74% $2,920,093.26
Subcontractor Percentage Amount
M & D FOUNDATION DRILLING INDUSTRIES, INC. 7.68% $1,107,171.42
JB PINNACLE GROUP, LLC 1.75% $252,285.15
TRP CONSTRUCTION GROUP, LLC 0.76% $109,563.84
RK HALL, LLC 0.69% $99,472.43
TORO BRAVO CONSTRUCTION, LLC 0.62% $89,381.03
MORRIS COUNTY CONTRACTORS, L.L.C. 0.60% $86,497.77
TORO BRAVO CONSTRUCTION, LLC 0.32% $46,132.14
FC TRAFFIC CONTROL, INC. 0.19% $27,390.96
JVH4 SERVICES, LLC 0.19% $27,390.96
PRIMATE CONSTRUCTION, LP 0.14% $20,182.81
LANCO TURF & SEEDING, INC. 0.03% $4,324.89
Total: 12.97% $1,869,793.40

Bid Items & Bid Tabulations

63 Total 0 of 63
WHEELER  |  US 83  |  CHILDRESS  |  0030-08-038  |  06/28/2023  |  $11,343,321.24  |  BR 2023(936)  |  BRIDGE REPL  |  354 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
EARTH BUILDERS, L.P.
PREPARING ROW
STA 5.000 $8,500.000 $25,000.000
REMOVING CONC (RIPRAP)
SY 381.000 $47.500 $20.000
REMOVING STAB BASE & ASPH PAV(14")
SY 3,292.000 $16.500 $25.000
EXCAVATION (ROADWAY)
CY 5,120.000 $35.000 $25.000
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 6,652.000 $25.000 $40.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 5,892.000 $0.400 $1.000
FL BS (CMP IN PLC)(TY B GR 3)(FNAL POS)
CY 1,118.000 $125.000 $125.000
PRIME COAT (MC-30)
GAL 1,208.000 $9.000 $14.000
ASPH (AC-20-5TR)
GAL 2,011.000 $8.000 $14.000
AGGR(TY-L GR-4S SAC-A)
CY 36.000 $200.000 $300.000
PLANE ASPH CONC PAV (1.5")
SY 83.000 $20.000 $25.000
CEM STABIL BKFL
CY 321.900 $320.000 $380.000
DRILL SHAFT (18 IN)
LF 190.000 $150.000 $140.000
DRILL SHAFT (36 IN)
LF 4,980.000 $320.000 $380.000
CL C CONC (ABUT)
CY 104.200 $1,400.000 $2,500.000
CL C CONC (CAP)
CY 271.500 $1,300.000 $2,500.000
CL C CONC (COLUMN)
CY 173.800 $1,600.000 $2,500.000
REINF CONC SLAB
SF 57,520.000 $28.000 $45.000
APPROACH SLAB
CY 159.300 $850.000 $1,800.000
PRESTR CONC GIRDER (TX40)
LF 6,749.500 $280.000 $325.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 1,995.600 $170.000 $250.000
RIPRAP (MOW STRIP)(4 IN)
CY 68.000 $670.000 $750.000
RAIL (TY SSTR)
LF 3,320.000 $180.000 $140.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 330.000 $210.000 $300.000
RC PIPE (CL III)(24 IN)
LF 50.000 $200.000 $150.000
SET (TY I) (24 IN) (4: 1) (C)
EA 4.000 $11,340.000 $2,000.000
REMOV STR (SET)
EA 2.000 $650.000 $1,000.000
REMOV STR (PIPE)
LF 25.000 $30.000 $30.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $160,000.000 $375,000.000
REMOV STR (BRIDGE 1000 FT OR GREATER)
EA 1.000 $950,000.000 $750,000.000
REMOV STR (SMALL FENCE)
LF 834.000 $22.000 $2.000
MOBILIZATION
LS 1.000 $1,094,962.740 $1,500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 17.000 $6,000.000 $4,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 561.000 $38.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 561.000 $11.000 $15.000
CONSTRUCTING DETOURS
SY 4,338.000 $150.000 $100.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 1.000 $11,000.000 $12,000.000
DRIVEWAYS (BASE)
SY 163.000 $65.000 $50.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,550.000 $40.000 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $3,000.000 $2,600.000
REMOVE METAL BEAM GUARD FENCE
LF 880.000 $3.100 $3.500
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $300.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,800.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $320.000 $250.000
GATE (INSTALL) (DOUBLE) (6' X 14')
EA 1.000 $1,500.000 $1,800.000
WIRE FENCE (TY A)
LF 4,529.000 $20.000 $30.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $890.000 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $1,000.000 $1,100.000
REMOVE SM RD SN SUP&AM
EA 7.000 $135.000 $300.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 7,860.000 $1.500 $3.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 8,255.000 $1.500 $3.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 20.000 $0.550 $4.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 8,240.000 $0.550 $4.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 8,240.000 $0.550 $4.000
REFL PAV MRKR TY II-A-A
EA 105.000 $3.500 $24.000
ELIM EXT PAV MRK & MRKS (4")
LF 2,695.000 $0.400 $4.000
ELIM EXT PAV MRK & MRKS (24")
LF 24.000 $3.750 $25.000
PAV SURF PREP FOR MRK (6")
LF 6,808.000 $0.400 $3.000
D-GR HMA TY-D SAC-A PG70-28 (EXEMPT)
TON 444.000 $240.000 $280.000
UNDERSEAL COURSE
GAL 1,208.000 $3.750 $20.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 4.000 $315.000 $2,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $12,200.000 $20,000.000
TMA (STATIONARY)
DAY 49.000 $260.000 $150.000
Totals: $11,343,321.240 $14,263,414.500