WHARTON COUNTY ROAD 289 (0913-09-141)

Items: 62

County: WHARTON
Length: 0.2480 MILES
Highway: COUNTY ROAD 289
District: YOAKUM
Control Number: 0913-09-141
DBE Goal: 0.0%
Project: BR 2025(478)
Guaranty: $57,000.00
Time: 233 WORKING DAYS
Engineer's Estimate: $2,852,923.25
Date: 11/05/2025 (7 months ago)
Contract Number: 11253018
Type: BRIDGE REPLACEMENT
Project ID: A00211424
Contract Type: Federal
Project Description: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
RYAN SIMPER
PAUL RODRIGUEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$2,852,923.25
1
$2,711,061.66
Over/Under Est: -4.97% -$141,861.59
Over/Under Est: 2.45% $69,811.48
Amt Left: 7.81% $211,673.07
$2,991,628.35
Over/Under Est: 4.86% $138,705.10
Amt Left: 10.35% $280,566.69
Delta: -2.36% -$68,893.62
Over/Under Est: 18.34% $523,307.65
Amt Left: 24.54% $665,169.24
Delta: -12.86% -$384,602.55
Over/Under Est: 27.6% $787,478.60
Amt Left: 34.28% $929,340.19
Delta: -7.82% -$264,170.95

Bid Items & Bid Tabulations

62 Total 0 of 62
WHARTON  |  COUNTY ROAD 289  |  YOAKUM  |  0913-09-141  |  11/05/2025  |  $2,852,923.25  |  BR 2025(478)  |  BRIDGE REPL  |  233 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TREVWAY, INC.
TEXAS STEEL INDUSTRIAL PLACING, LLC
STX CIVIL
E-Z BEL CONSTRUCTION, LLC
R CONSTRUCTION CIVIL, LLC
PREPARING ROW
STA 13.200 $3,000.000 $1,100.000 $2,000.000 $1,800.000 $3,600.000 $7,400.000
EXCAV (ROADWAY)
CY 960.000 $20.000 $9.000 $20.000 $30.000 $23.000 $62.000
EXCAV (CHANNEL)
CY 1,076.000 $25.000 $9.000 $20.000 $33.000 $39.000 $60.000
EMBANK (FNL)(OC)(TY C)
CY 1,004.000 $20.000 $12.000 $30.000 $48.000 $59.000 $100.000
BLADING
HR 32.000 $125.000 $10.000 $75.000 $100.000 $72.000 $120.000
BROADCAST SEED (PERM_RURAL_CLAY)
SY 4,583.000 $1.250 $0.700 $1.000 $1.420 $1.000 $0.750
BROADCAST SEED (TEMP_WARM)
SY 1,146.000 $0.750 $0.200 $1.000 $1.420 $2.000 $2.000
BROADCAST SEED (TEMP_COOL)
SY 1,146.000 $0.750 $0.200 $1.000 $1.420 $2.000 $2.000
VEGETATIVE WATERING
TGL 39.400 $75.000 $50.000 $1.000 $70.000 $100.000 $250.000
FL BS (CMP IN PLC)(TY E GR 5)(FNAL POS)
CY 825.000 $115.000 $200.000 $90.000 $69.000 $210.000 $140.000
ASPH (RC-250)
GAL 690.000 $20.000 $27.350 $10.000 $25.000 $22.000 $14.000
AGGR (TY-E, GR-5)(SAC-B)
CY 27.000 $800.000 $1,629.470 $1,100.000 $1,000.000 $1,290.000 $1,800.000
AGGR (TY-PE, GR-4)(SAC-B)
CY 27.000 $800.000 $1,806.320 $1,100.000 $1,100.000 $1,430.000 $1,800.000
ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)
GAL 1,174.000 $20.000 $24.130 $10.000 $15.000 $19.100 $11.000
CEM STABIL BKFL
CY 204.000 $200.000 $155.900 $200.000 $230.000 $300.000 $110.000
TEMPORARY SPL SHORING
SF 470.000 $25.000 $25.000 $35.000 $21.000 $53.000 $72.000
DRILL SHAFT (24 IN)
LF 396.000 $275.000 $273.800 $365.000 $345.000 $350.000 $350.000
DRILL SHAFT (30 IN)
LF 618.000 $325.000 $307.730 $365.000 $330.000 $360.000 $350.000
CL C CONC (ABUT)
CY 76.100 $1,200.000 $900.000 $1,800.000 $1,200.000 $1,475.000 $2,200.000
CL C CONC (CAP)
CY 16.000 $1,350.000 $900.000 $2,500.000 $2,225.000 $1,600.000 $3,300.000
CL C CONC (COLUMN)
CY 9.100 $1,800.000 $900.000 $2,750.000 $2,250.000 $1,500.000 $2,700.000
REINF CONC SLAB (BOX BEAM)
SF 1,832.000 $25.000 $19.000 $22.000 $33.000 $28.000 $55.000
REINF CONC SLAB (SLAB BEAM)
SF 4,833.000 $30.000 $18.000 $22.000 $26.000 $31.000 $18.000
PRESTR CONC SLAB BEAM (4SB12)
LF 868.000 $225.000 $191.000 $220.000 $208.000 $238.000 $180.000
PRESTR CONC SLAB BEAM (5SB15)
LF 247.410 $250.000 $281.140 $320.000 $285.000 $300.000 $210.000
PRESTR CONC BOX BEAM (4B28)
LF 278.000 $225.000 $344.000 $320.000 $400.000 $425.000 $330.000
PRESTR CONC BOX BEAM (5B28)
LF 139.000 $275.000 $385.000 $350.000 $480.000 $425.000 $370.000
RIPRAP (CONC)(4 IN)
CY 6.000 $800.000 $400.000 $700.000 $600.000 $1,000.000 $440.000
RIPRAP (CONC)(5 IN)
CY 17.000 $900.000 $400.000 $700.000 $800.000 $750.000 $650.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 2,144.000 $175.000 $190.000 $182.000 $190.000 $281.000 $255.000
RAIL (TY T223)
LF 548.000 $150.000 $110.000 $145.000 $180.000 $328.000 $150.000
ARMOR JOINT (SEALED)
LF 154.000 $150.000 $85.000 $145.000 $160.000 $23.000 $70.000
CONC BOX CULV (10 FT X 5 FT)
LF 138.000 $1,500.000 $1,600.000 $1,300.000 $1,740.000 $1,550.000 $1,700.000
SET (TY I)(S= 10 FT)(HW= 6 FT)(3:1)(C)
EA 6.000 $10,000.000 $6,076.670 $17,500.000 $20,000.000 $11,000.000 $6,200.000
SET (TY II) (18 IN) (TP) (6: 1) (P)
EA 4.000 $1,380.000 $1,397.000 $2,200.000 $2,200.000 $1,402.000 $2,100.000
SET (TY II) (24 IN) (TP) (6: 1) (P)
EA 1.000 $2,125.000 $4,000.000 $3,000.000 $2,800.000 $3,750.000 $2,700.000
SET (TY II) (42 IN) (TP) (6: 1) (P)
EA 2.000 $5,000.000 $6,300.000 $5,500.000 $3,900.000 $3,750.000 $14,000.000
THERMOPLASTIC PIPE (PP) (18")
LF 381.000 $80.000 $47.000 $70.000 $75.000 $28.000 $95.000
THERMOPLASTIC PIPE (PP) (24")
LF 186.000 $65.000 $82.000 $90.000 $98.000 $28.000 $105.000
THERMOPLASTIC PIPE (PP) (42")
LF 146.000 $200.000 $182.000 $150.000 $177.000 $28.000 $160.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 4.000 $30,000.000 $25,000.000 $25,000.000 $22,500.000 $15,410.000 $50,000.000
REMOV STR (SMALL)
EA 4.000 $1,100.000 $400.000 $2,000.000 $750.000 $1,467.000 $1,200.000
MOBILIZATION
LS 1.000 $266,000.000 $270,000.000 $292,310.130 $208,000.000 $250,000.000 $350,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $4,000.000 $1,100.000 $1,000.000 $2,000.000 $1,300.000 $3,500.000
SANDBAGS FOR EROSION CONTROL
EA 120.000 $12.000 $6.000 $5.000 $15.000 $12.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,429.000 $4.000 $3.000 $4.000 $4.000 $7.000 $8.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,429.000 $1.000 $0.500 $1.000 $1.000 $2.000 $1.500
DRIVEWAYS (SURF TREAT)
SY 300.000 $30.000 $44.210 $30.000 $45.000 $35.000 $60.000
MTL W-BEAM GD FEN (TIM POST)
LF 175.000 $40.000 $34.680 $29.000 $33.000 $28.000 $33.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,200.000 $3,257.000 $2,200.000 $2,320.000 $19.000 $875.000
MTL BEAM GD FEN TRANS (TL2)
EA 1.000 $2,500.000 $2,497.000 $1,850.000 $1,515.000 $1,250.000 $1,750.000
GUARDRAIL END TREATMENT (INSTALL)
EA 9.000 $3,400.000 $3,381.000 $3,000.000 $4,220.000 $3,500.000 $3,600.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 3.000 $35,000.000 $30,774.000 $27,500.000 $30,000.000 $28,900.000 $34,000.000
WIRE FENCE (TY A)
LF 380.000 $20.000 $14.410 $22.000 $12.000 $30.000 $30.000
WIRE FENCE (WATER GAP)
LF 160.000 $40.000 $22.000 $40.000 $30.000 $88.000 $42.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 2.000 $500.000 $300.000 $225.000 $500.000 $500.000 $600.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 2.000 $560.000 $800.000 $525.000 $1,000.000 $1,200.000 $550.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 18.000 $30.000 $11.000 $30.000 $30.000 $59.000 $27.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 11.000 $60.000 $11.000 $30.000 $60.000 $75.000 $35.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $140.000 $44.000 $90.000 $250.000 $200.000 $72.000
AMPHIBIAN/REPTILE EXCLUSION FENCE INST
LF 1,248.000 $5.000 $7.000 $10.000 $5.000 $4.000 $4.500
AMPHIBIAN/REPTILE EXCLUSION FENCE REM
LF 1,248.000 $1.000 $0.500 $2.000 $1.000 $2.000 $2.000
Totals: $2,852,923.250 $2,711,061.657 $2,922,734.730 $2,991,628.350 $3,376,230.900 $3,640,401.850