WHARTON CR (0913-09-109)

Items: 44

County: WHARTON
Length: N/A
Highway: CR
District: YOAKUM
Control Number: 0913-09-109
DBE Goal: N/A
Project: BR 2020(604)
Guaranty: N/A
Time: 184 WORKING DAYS
Engineer's Estimate: $1,380,359.25
Date: 04/06/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (5)
E
Engineer's Estimate
$1,380,359.25
Over/Under Est: 17.86% $246,503.25
$1,646,466.32
Over/Under Est: 19.28% $266,107.07
Amt Left: 1.21% $19,603.82
$1,899,961.38
Over/Under Est: 37.64% $519,602.13
Amt Left: 16.79% $273,098.88
Delta: -15.40% -$253,495.06
$1,923,908.45
Over/Under Est: 39.38% $543,549.20
Amt Left: 18.26% $297,045.95
Delta: -1.26% -$23,947.07
Over/Under Est: 40.68% $561,589.55
Amt Left: 19.37% $315,086.30
Delta: -0.94% -$18,040.35

Bid Items & Bid Tabulations

44 Total 0 of 44
WHARTON  |  CR  |  YOAKUM  |  0913-09-109  |  04/06/2022  |  $1,380,359.25  |  BR 2020(604)  |  BRIDGE REPL  |  184 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS STEEL INDUSTRIAL PLACING, LLC
TREVWAY, INC.
SB CONTRACTORS LLC
3LW CIVIL LLC
JOHN REED AND COMPANY, LLC
PREPARING ROW
STA 9.010 $3,500.000 $2,000.000 $2,500.000 $5,000.000 $1,100.000 $8,000.000
EXCAVATION (ROADWAY)
CY 276.000 $20.000 $20.000 $16.430 $52.100 $30.000 $80.000
EXCAVATION (CHANNEL)
CY 682.000 $20.000 $25.000 $13.300 $30.850 $30.000 $60.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 1,051.000 $25.000 $25.000 $25.000 $43.190 $40.000 $80.000
BLADING
HR 48.000 $120.000 $125.000 $100.000 $101.950 $150.000 $120.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 5,039.000 $1.500 $1.500 $1.540 $1.770 $1.000 $2.000
BROADCAST SEED (TEMP) (WARM)
SY 1,261.000 $1.500 $5.000 $1.280 $5.960 $1.000 $2.000
BROADCAST SEED (TEMP) (COOL)
SY 1,261.000 $1.500 $5.000 $1.280 $5.960 $1.000 $2.000
VEGETATIVE WATERING
MG 51.500 $25.000 $50.000 $46.290 $85.230 $25.000 $95.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 544.000 $110.000 $115.000 $180.000 $119.560 $85.000 $120.000
REWORK BS MTL (TY C) (6") (ORD COMP)
STA 298.000 $2.250 $65.000 $25.000 $53.610 $95.000 $200.000
ASPH (RC-250)
GAL 218.000 $15.000 $20.000 $21.960 $21.850 $40.000 $8.000
AGGR(TY-E GR-5 SAC-B)
CY 8.000 $120.000 $1,200.000 $1,282.000 $1,267.570 $700.000 $500.000
AGGR(TY-PE GR-4 SAC-B)
CY 8.000 $120.000 $1,200.000 $1,282.000 $1,267.570 $600.000 $600.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 369.000 $20.000 $20.000 $16.440 $16.360 $20.000 $25.000
CEM STABIL BKFL
CY 265.000 $125.000 $150.000 $100.000 $225.240 $190.000 $90.000
PRESTR CONC PIL (18 IN SQ)
LF 1,420.000 $150.000 $245.000 $171.000 $157.540 $175.000 $195.000
CL C CONC (ABUT)
CY 68.600 $1,200.000 $1,050.000 $993.000 $1,533.150 $1,400.000 $1,800.000
REINF CONC SLAB (BOX BEAM)
SF 1,701.000 $21.000 $20.000 $25.000 $43.340 $19.000 $40.000
REINF CONC SLAB (SLAB BEAM)
SF 2,600.000 $25.000 $20.000 $25.000 $50.890 $24.000 $40.000
SHEAR KEY
CY 8.600 $400.000 $1,850.000 $394.000 $1,078.400 $400.000 $160.000
PRESTR CONC BOX BEAM (4B20)
LF 258.000 $215.000 $325.000 $298.000 $356.010 $255.000 $230.000
PRESTR CONC BOX BEAM (5B20)
LF 129.000 $220.000 $350.000 $332.000 $341.390 $260.000 $230.000
PRESTR CONC SLAB BEAM (5SB15)
LF 494.910 $225.000 $325.000 $275.000 $361.120 $245.000 $230.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 920.000 $200.000 $210.000 $295.000 $209.660 $205.000 $150.000
RAIL (TY T223)
LF 410.000 $100.000 $125.000 $100.000 $170.480 $155.000 $150.000
ARMOR JOINT (SEALED)
LF 133.600 $85.000 $100.000 $88.000 $264.630 $85.000 $140.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 3.000 $25,000.000 $20,000.000 $25,000.000 $15,764.910 $14,000.000 $30,000.000
MOBILIZATION
LS 1.000 $125,000.000 $100,000.000 $160,000.000 $169,000.000 $310,000.000 $140,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $2,000.000 $1,150.000 $1,200.000 $1,500.000 $20,000.000 $6,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,367.000 $3.000 $3.500 $3.000 $9.910 $1.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,367.000 $1.000 $1.250 $1.000 $2.250 $1.000 $3.000
DRIVEWAYS (BASE)
SY 134.000 $35.000 $30.000 $65.000 $98.370 $33.000 $70.000
MTL W-BEAM GD FEN (TIM POST)
LF 125.000 $25.000 $39.000 $47.000 $47.530 $26.000 $80.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 9.000 $2,000.000 $2,430.000 $2,022.000 $2,461.330 $2,100.000 $3,500.000
MTL BEAM GD FEN TRANS (TL2)
EA 3.000 $1,500.000 $1,800.000 $1,818.000 $1,519.970 $1,300.000 $3,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,500.000 $1,700.000 $2,474.000 $1,757.550 $1,450.000 $3,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $3,000.000 $3,750.000 $3,298.000 $4,074.540 $2,950.000 $4,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 14.000 $35.000 $50.000 $55.000 $25.540 $30.000 $80.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 25.000 $40.000 $50.000 $55.000 $38.320 $35.000 $80.000
1
RC PIPE (CL III)(36 IN)
LF 282.000 $140.000 $130.000 $146.000 $0.000 $190.000 $320.000
1
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 3.000 $4,000.000 $4,000.000 $8,427.000 $0.000 $5,500.000 $3,000.000
1A
SET (TY II) (36 IN) (HDPE) (6: 1) (P)
EA 3.000 $4,000.000 $0.000 $0.000 $11,796.770 $0.000 $0.000
1A
THERMO PIPE(36")(PP)(TY S)(TY II)
LF 282.000 $140.000 $0.000 $0.000 $116.740 $0.000 $0.000
Totals: $1,431,839.250 $1,626,862.500 $1,646,466.325 $1,899,961.402 $1,923,908.450 $1,941,948.800