WHARTON CR (0913-09-106)

Items: 45

County: WHARTON
Length: N/A
Highway: CR
District: YOAKUM
Control Number: 0913-09-106
DBE Goal: N/A
Project: BR 2020(911)
Guaranty: N/A
Time: 120 WORKING DAYS
Engineer's Estimate: $835,410.70
Date: 06/01/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
RYAN SIMPER
JEFFREY KALINA
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$835,410.70
Over/Under Est: 14.75% $123,248.30
Over/Under Est: 15.1% $126,117.10
Amt Left: 0.3% $2,868.80
Over/Under Est: 113.13% $945,127.63
Amt Left: 85.73% $821,879.33
Delta: -85.18% -$819,010.53
Subcontractor Percentage Amount
WEBER-BALKE FOUNDATION COMPANY, INC 6.23% $59,724.46
A K FUQUAY CONSTRUCTION 1.16% $11,120.44
HOUSTON SAWING & DRILLING 0.38% $3,642.90
Total: 7.77% $74,487.80

Bid Items & Bid Tabulations

45 Total 0 of 45
WHARTON  |  CR  |  YOAKUM  |  0913-09-106  |  06/01/2022  |  $835,410.70  |  BR 2020(911)  |  BRIDGE REPL  |  120 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS STEEL INDUSTRIAL PLACING, LLC
CONSTAR CONSTRUCTION
MB WESTERN INDUSTRIAL CONTRACTING COMPANY
PREPARING ROW
STA 5.350 $3,000.000 $1,150.000 $2,500.000 $7,282.000
EXCAVATION (ROADWAY)
CY 263.000 $22.000 $20.000 $30.000 $111.330
EXCAVATION (CHANNEL)
CY 117.000 $20.000 $25.000 $35.000 $125.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 218.000 $25.000 $25.000 $30.000 $148.000
BLADING
HR 30.000 $150.000 $125.000 $110.000 $189.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 4,975.000 $2.000 $1.500 $1.000 $1.250
BROADCAST SEED (TEMP) (WARM)
SY 1,245.000 $1.000 $4.000 $1.000 $3.650
BROADCAST SEED (TEMP) (COOL)
SY 1,245.000 $1.000 $4.000 $1.000 $3.650
VEGETATIVE WATERING
MG 53.600 $50.000 $75.000 $100.000 $25.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 371.000 $90.000 $100.000 $130.000 $122.500
CEM STABIL BKFL
CY 90.000 $140.000 $150.000 $120.000 $125.000
TEMPORARY SPL SHORING
SF 540.000 $25.000 $45.000 $25.000 $90.000
PRESTR CONC PIL (18 IN SQ)
LF 615.000 $160.000 $200.000 $170.000 $146.650
CL C CONC (ABUT)
CY 27.000 $1,200.000 $1,050.000 $1,100.000 $1,300.000
CL C CONC (CAP)
CY 9.300 $1,350.000 $1,150.000 $1,300.000 $1,357.000
REINF CONC SLAB (SLAB BEAM)
SF 2,248.000 $25.000 $20.000 $25.000 $190.000
PRESTR CONC SLAB BEAM (4SB12)
LF 551.380 $165.000 $200.000 $210.000 $182.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 332.000 $175.000 $195.000 $210.000 $235.750
RAIL (TY T223)
LF 168.000 $120.000 $125.000 $145.000 $112.120
RAIL (TY T631LS)
LF 125.000 $100.000 $75.000 $90.000 $85.000
ARMOR JOINT (SEALED)
LF 66.000 $80.000 $150.000 $80.000 $180.000
CONC BOX CULV (8 FT X 5 FT)
LF 93.000 $635.000 $875.000 $1,500.000 $1,177.250
WINGWALL (PW - 1) (HW=6 FT)
EA 2.000 $16,000.000 $22,500.000 $20,000.000 $6,860.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $20,000.000 $20,000.000 $20,000.000 $11,601.500
REMOV STR (PIPE)
EA 1.000 $400.000 $850.000 $1,300.000 $2,950.000
MOBILIZATION
LS 1.000 $75,000.000 $73,000.000 $80,000.000 $168,090.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $3,000.000 $1,150.000 $2,000.000 $1,100.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 768.000 $3.000 $3.500 $5.000 $10.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 768.000 $1.000 $1.250 $1.000 $2.430
CONSTRUCTING DETOURS
SY 871.000 $60.000 $110.000 $25.000 $183.100
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 160.000 $35.000 $80.000 $50.000 $723.330
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 80.000 $40.000 $80.000 $50.000 $723.330
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 160.000 $20.000 $15.000 $10.000 $54.230
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 80.000 $17.000 $15.000 $10.000 $54.230
MTL W-BEAM GD FEN (TIM POST)
LF 50.000 $27.000 $39.000 $60.000 $39.500
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,700.000 $1,250.000 $2,000.000 $1,527.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,500.000 $1,700.000 $1,300.000 $1,861.200
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000 $3,000.000 $3,250.000 $3,500.000 $3,961.890
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $22.000 $47.500 $30.000 $30.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 16.000 $27.000 $47.500 $30.000 $30.500
DITCH CLEANING AND RESHAPING (FOOT)
LF 75.000 $15.000 $40.000 $50.000 $115.680
1
RC PIPE (CL III)(18 IN)
LF 108.000 $70.000 $0.000 $100.000 $185.000
1
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 1.000 $1,100.000 $0.000 $2,500.000 $3,973.500
1A
SET (TY II) (18 IN) (HDPE) (6: 1) (P)
EA 1.000 $1,100.000 $1,350.000 $0.000 $0.000
1A
THERMO PIPE(18")(PP)(TY S)(TY II)
LF 108.000 $70.000 $75.000 $0.000 $0.000
Totals: $844,070.700 $958,659.000 $961,527.800 $1,780,538.330