Show Job Controls
Bid Cobra

WHARTON CR (0913-09-088)

Items: 49

County: WHARTON
Length: N/A
Highway: CR
District: YOAKUM
Control Number: 0913-09-088
DBE Goal: N/A
Project: BR 1702(586)
Guaranty: N/A
Time: 120 WORKING DAYS
Engineer's Estimate: $1,254,157.90
Date: 06/05/2019 (7 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$1,254,157.90
$1,639,006.44
Over/Under Est: 30.69% $384,848.54
$1,683,785.60
Over/Under Est: 34.26% $429,627.70
Amt Left: 2.73% $44,779.16
$1,829,312.30
Over/Under Est: 45.86% $575,154.40
Amt Left: 11.61% $190,305.86
Delta: -8.64% -$145,526.70

Bid Items & Bid Tabulations

49 Total 0 of 49
WHARTON  |  CR  |  YOAKUM  |  0913-09-088  |  06/05/2019  |  $1,254,157.90  |  BR 1702(586)  |  REPLACE BRIDGE AND APPROACHES  |  120 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
REXCO CONSTRUCTION SERVICES, INC.
SB CONTRACTORS LLC
CONSTAR CONSTRUCTION
PREPARING ROW
STA 6.550 $1,500.000 $9,320.000 $8,500.000 $2,000.000
EXCAVATION (ROADWAY)
CY 431.000 $20.000 $20.000 $12.000 $20.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 2,086.000 $30.000 $34.800 $35.000 $45.000
BLADING
HR 40.000 $100.000 $125.000 $55.000 $130.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 397.000 $1.000 $3.040 $3.000 $3.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 2,310.000 $1.000 $1.110 $1.100 $2.000
BROADCAST SEED (TEMP) (WARM)
SY 577.000 $1.000 $2.070 $2.000 $2.000
BROADCAST SEED (TEMP) (COOL)
SY 180.000 $1.000 $6.480 $6.250 $2.000
VEGETATIVE WATERING
MG 23.940 $60.000 $100.000 $65.000 $120.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 566.000 $110.000 $147.630 $125.000 $150.000
ASPH (RC-250)
GAL 323.000 $15.000 $14.260 $12.000 $25.000
AGGR(TY-E GR-5 SAC-B)
CY 11.000 $300.000 $894.420 $270.000 $500.000
AGGR(TY-PE GR-4 SAC-B)
CY 12.000 $300.000 $856.870 $425.000 $500.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 549.000 $10.000 $17.390 $12.000 $24.000
CEM STABIL BKFL
CY 301.000 $90.000 $83.160 $180.000 $100.000
TRENCH EXCAVATION PROTECTION
LF 35.000 $15.000 $200.000 $55.000 $20.000
TEMPORARY SPL SHORING
SF 599.000 $25.000 $30.000 $25.000 $30.000
PRESTR CONC PIL (18 IN SQ)
LF 1,660.000 $120.000 $188.530 $230.000 $200.000
CL C CONC (ABUT)
CY 19.600 $1,000.000 $2,210.540 $3,500.000 $1,200.000
CL C CONC (CAP)
CY 13.200 $1,000.000 $5,829.830 $3,200.000 $1,500.000
REINF CONC SLAB (SLAB BEAM)
SF 2,860.000 $20.000 $22.490 $26.000 $24.000
PRESTR CONC SLAB BEAM (5SB12)
LF 542.500 $175.000 $203.150 $225.000 $240.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 11.500 $125.000 $458.640 $225.000 $230.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 165.000 $127.000 $246.550 $230.000 $230.000
RAIL (TY T631)
LF 244.000 $85.000 $81.330 $85.000 $110.000
ARMOR JOINT (SEALED)
LF 44.000 $85.000 $77.280 $85.000 $80.000
CONC BOX CULV (7 FT X 3 FT)
LF 192.000 $350.000 $575.880 $500.000 $600.000
CONC BOX CULV (8 FT X 5 FT)
LF 204.000 $500.000 $667.510 $525.000 $700.000
WINGWALL (SPL)
EA 4.000 $32,000.000 $19,956.700 $21,000.000 $49,000.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 3.000 $20,000.000 $14,400.000 $12,000.000 $56,000.000
REMOV STR (PIPE)
EA 1.000 $2,000.000 $6,300.000 $2,000.000 $8,000.000
MOBILIZATION
LS 1.000 $150,000.000 $153,000.000 $168,000.000 $130,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $2,500.000 $1,645.280 $5,500.000 $2,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 130.000 $30.000 $58.080 $60.000 $40.000
ROCK FILTER DAMS (REMOVE)
LF 130.000 $10.000 $20.800 $20.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,315.000 $3.000 $4.160 $6.000 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,315.000 $1.000 $1.040 $1.000 $2.000
MTL W-BEAM GD FEN (TIM POST)
LF 275.000 $30.000 $31.930 $32.000 $30.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,500.000 $988.000 $1,000.000 $1,400.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 87.500 $65.000 $62.870 $65.000 $75.000
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000 $2,500.000 $3,114.800 $3,200.000 $3,400.000
WIRE FENCE (TY A)
LF 729.000 $15.000 $26.520 $15.000 $24.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 1.000 $130.000 $260.000 $300.000 $70.000
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 2.000 $350.000 $260.000 $300.000 $70.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 3.000 $60.000 $260.000 $300.000 $70.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 2.000 $60.000 $58.760 $65.000 $80.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 19.000 $25.000 $38.480 $40.000 $20.000
CATTLE GUARD (24')
EA 1.000 $10,000.000 $15,600.000 $3,500.000 $20,000.000
TMA (STATIONARY)
EA 2.000 $8,000.000 $2,340.000 $7,000.000 $7,000.000
Totals: $1,254,157.900 $1,639,006.460 $1,683,785.600 $1,829,312.300