Show Job Controls
Bid Cobra

WHARTON CR (0913-09-070)

Items: 44

County: WHARTON
Length: N/A
Highway: CR
District: YOAKUM
Control Number: 0913-09-070
DBE Goal: N/A
Project: BR 2014(680)
Guaranty: N/A
Time: 210 WORKING DAYS
Engineer's Estimate: $1,358,189.20
Date: 06/05/2020 (6 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,358,189.20
1
$1,496,610.96
Over/Under Est: 10.19% $138,421.76
Over/Under Est: 14.13% $191,917.77
Amt Left: 3.57% $53,496.01
Over/Under Est: 21.3% $289,351.56
Amt Left: 10.08% $150,929.80
Delta: -6.29% -$97,433.79
$1,672,529.80
Over/Under Est: 23.14% $314,340.60
Amt Left: 11.75% $175,918.84
Delta: -1.52% -$24,989.04
Subcontractor Percentage Amount
HEMPHILL WBE PILE DRIVING CO. 7.69% $115,089.38
LONE STAR PAVING COMPANY 3.54% $52,980.03
LONESTAR TRAFFIC SAFETY, LLC 0.56% $8,381.02
Total: 11.79% $176,450.43

Bid Items & Bid Tabulations

44 Total 0 of 44
WHARTON  |  CR  |  YOAKUM  |  0913-09-070  |  06/05/2020  |  $1,358,189.20  |  BR 2014(680)  |  REPLACE BRIDGE AND APPROACHES  |  210 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TREVWAY, INC.
REXCO CONSTRUCTION SERVICES, INC.
FUQUA CONSTRUCTION CO., INC.
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 8.400 $3,000.000 $2,500.000 $4,300.000 $1,851.000 $10,000.000
EXCAVATION (ROADWAY)
CY 316.000 $20.000 $18.000 $35.000 $14.000 $20.000
EXCAVATION (CHANNEL)
CY 1,500.000 $20.000 $9.000 $30.000 $12.000 $20.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 919.000 $25.000 $12.000 $30.010 $17.000 $30.000
BLADING
HR 35.000 $100.000 $50.000 $125.000 $151.000 $150.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 2,937.000 $2.000 $1.000 $1.220 $1.000 $1.000
BROADCAST SEED (TEMP) (WARM)
SY 735.000 $2.000 $1.000 $4.590 $1.000 $1.000
BROADCAST SEED (TEMP) (COOL)
SY 735.000 $2.000 $1.000 $4.590 $1.000 $1.000
VEGETATIVE WATERING
MG 25.000 $30.000 $50.000 $204.000 $10.000 $50.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 608.000 $110.000 $128.090 $152.320 $68.000 $60.000
ASPH (RC-250)
GAL 196.000 $25.000 $186.320 $16.020 $16.000 $10.000
AGGR(TY-E GR-5 SAC-B)
CY 10.000 $400.000 $1,136.840 $1,101.000 $744.000 $300.000
AGGR(TY-PE GR-4 SAC-B)
CY 10.000 $400.000 $1,263.160 $1,125.000 $744.000 $300.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 334.000 $20.000 $18.950 $14.440 $14.000 $10.000
CEM STABIL BKFL
CY 111.000 $100.000 $100.000 $101.300 $125.000 $350.000
PRESTR CONC PIL (18 IN SQ)
LF 1,450.000 $100.000 $156.860 $129.130 $213.000 $145.000
CL C CONC (ABUT)
CY 76.000 $1,100.000 $1,113.720 $1,453.280 $1,040.000 $1,000.000
CL C CONC (CAP)
CY 24.800 $1,300.000 $965.840 $3,288.150 $1,229.000 $1,000.000
REINF CONC SLAB (SLAB BEAM)
SF 7,615.000 $20.000 $19.000 $24.630 $27.000 $16.000
PRESTR CONC SLAB BEAM (5SB12)
LF 443.540 $160.000 $176.580 $147.790 $202.000 $185.000
PRESTR CONC SLAB BEAM (4SB15)
LF 348.000 $165.000 $185.180 $152.890 $202.000 $185.000
PRESTR CONC SLAB BEAM (5SB15)
LF 296.540 $170.000 $192.110 $157.230 $202.000 $185.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 623.000 $140.000 $201.210 $124.150 $136.000 $185.000
RAIL (TY T223)
LF 570.000 $100.000 $91.820 $174.000 $115.000 $150.000
ARMOR JOINT (SEALED)
LF 176.000 $75.000 $70.160 $85.560 $107.000 $100.000
RC PIPE (CL III)(18 IN)
LF 24.000 $75.000 $115.010 $65.630 $77.000 $85.000
RC PIPE (CL III)(24 IN)
LF 545.000 $100.000 $84.980 $45.240 $114.000 $105.000
RC PIPE (CL III)(42 IN)
LF 160.000 $185.000 $162.090 $123.870 $193.000 $450.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,600.000 $1,893.690 $2,034.760 $944.000 $1,850.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $2,200.000 $1,893.680 $2,561.900 $1,097.000 $2,850.000
SET (TY II) (42 IN) (RCP) (6: 1) (P)
EA 1.000 $7,000.000 $14,763.160 $7,717.800 $2,614.000 $5,000.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 3.000 $25,000.000 $25,000.000 $18,000.000 $20,779.000 $35,000.000
REMOV STR (SMALL)
EA 3.000 $500.000 $1,500.000 $900.000 $1,931.000 $2,500.000
MOBILIZATION
LS 1.000 $120,000.000 $150,000.000 $144,498.000 $212,990.000 $160,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $3,000.000 $1,010.530 $907.800 $1,252.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 90.000 $30.000 $45.600 $45.290 $78.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 90.000 $10.000 $42.070 $16.630 $26.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,908.000 $3.000 $3.000 $3.620 $4.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,908.000 $1.000 $1.000 $0.990 $1.000 $2.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $1,800.000 $1,551.650 $1,657.500 $2,113.000 $1,850.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $2,800.000 $2,613.970 $2,830.500 $3,608.000 $2,850.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 14.000 $20.000 $6.320 $28.560 $36.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 8.000 $25.000 $11.370 $45.900 $59.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 16.000 $25.000 $11.370 $51.000 $65.000 $100.000
Totals: $1,358,189.200 $1,496,610.965 $1,550,106.971 $1,647,540.760 $1,672,529.800