WHARTON CR (0913-09-069)

Items: 42

County: WHARTON
Length: N/A
Highway: CR
District: YOAKUM
Control Number: 0913-09-069
DBE Goal: N/A
Project: BR 2014(679)
Guaranty: N/A
Time: 75 WORKING DAYS
Engineer's Estimate: $435,085.00
Date: 09/07/2017 (8 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$435,085.00
1
$425,246.70
Over/Under Est: -2.26% -$9,838.30
Over/Under Est: 3.78% $16,450.75
Amt Left: 6.18% $26,289.05
$476,674.00
Over/Under Est: 9.56% $41,589.00
Amt Left: 12.09% $51,427.30
Delta: -5.57% -$25,138.25
Over/Under Est: 36.86% $160,382.00
Amt Left: 40.03% $170,220.30
Delta: -24.92% -$118,793.00

Bid Items & Bid Tabulations

42 Total 0 of 42
WHARTON  |  CR  |  YOAKUM  |  0913-09-069  |  09/07/2017  |  $435,085.00  |  BR 2014(679)  |  REPLACE BRIDGE AND APPROACHES  |  75 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TREVWAY, INC.
JOHN REED AND COMPANY, LLC
SB CONTRACTORS LLC
ISI CONTRACTING, INC.
PREPARING ROW
STA 3.600 $3,000.000 $2,000.000 $5,000.000 $2,000.000 $500.000
EXCAVATION (ROADWAY)
CY 165.000 $20.000 $9.000 $30.000 $16.000 $60.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 210.000 $25.000 $15.000 $30.000 $20.000 $50.000
BLADING
HR 10.000 $100.000 $150.000 $20.000 $55.000 $100.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 1,040.000 $2.000 $1.580 $0.200 $2.000 $2.000
CELL FBR MLCH SEED(TEMP)(WARM)
SY 260.000 $3.000 $5.000 $0.200 $5.000 $5.000
CELL FBR MLCH SEED(TEMP)(COOL)
SY 260.000 $3.000 $5.000 $0.200 $5.000 $5.000
VEGETATIVE WATERING
MG 3.600 $100.000 $100.000 $20.000 $55.000 $40.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 220.000 $100.000 $77.000 $90.000 $115.000 $160.000
PRIME COAT (MC-30)
GAL 200.000 $5.000 $55.000 $7.000 $12.000 $6.000
ASPH (MULTI OPTION)
GAL 980.000 $3.000 $16.000 $6.000 $13.000 $4.000
AGGR(TY-PB GR-3 SAC-B)
CY 12.000 $110.000 $500.000 $90.000 $1,000.000 $600.000
CEM STABIL BKFL
CY 29.000 $90.000 $100.000 $52.000 $190.000 $65.000
PRESTR CONC PIL (18 IN SQ)
LF 735.000 $120.000 $88.000 $130.000 $100.000 $130.000
CL C CONC (ABUT)
CY 24.000 $900.000 $1,700.000 $1,300.000 $875.000 $1,200.000
CL C CONC (CAP)
CY 8.000 $1,000.000 $1,000.000 $1,300.000 $1,000.000 $1,200.000
REINF CONC SLAB
SF 2,249.000 $15.000 $19.000 $8.750 $17.000 $23.000
PRESTR CONC SLAB BEAM (4SB12)
LF 552.000 $130.000 $112.000 $180.000 $150.000 $160.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 235.000 $125.000 $100.000 $70.000 $155.000 $275.000
RAIL (TY T223)
LF 164.000 $100.000 $70.000 $40.000 $120.000 $90.000
ARMOR JOINT
LF 56.000 $75.000 $55.000 $25.000 $85.000 $55.000
RC PIPE (CL III)(24 IN)
LF 22.000 $80.000 $50.000 $70.000 $105.000 $145.000
RC PIPE (CL III)(48 IN)
LF 26.000 $150.000 $88.000 $85.000 $201.000 $220.000
SET (TY II) (24 IN) (RCP) (3: 1) (P)
EA 1.000 $1,200.000 $1,404.000 $1,000.000 $1,400.000 $1,200.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $1,500.000 $1,800.000 $2,000.000 $1,400.000 $1,600.000
SET (TY II) (48 IN) (RCP) (3: 1) (P)
EA 1.000 $3,700.000 $3,000.000 $3,000.000 $5,500.000 $4,000.000
SET (TY II) (48 IN) (RCP) (6: 1) (P)
EA 1.000 $4,800.000 $3,000.000 $4,000.000 $7,500.000 $7,300.000
REMOV STR (WINGWALL)
EA 1.000 $1,360.000 $500.000 $1,000.000 $1,500.000 $2,500.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $15,000.000 $25,000.000 $30,000.000 $15,000.000 $35,000.000
REMOV STR (DRIVEWAY CULVERT)
EA 2.000 $500.000 $200.000 $500.000 $500.000 $1,200.000
MOBILIZATION
LS 1.000 $40,000.000 $42,000.000 $40,000.000 $47,630.000 $59,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $2,500.000 $600.000 $500.000 $1,200.000 $1,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 765.000 $3.500 $2.000 $3.000 $3.500 $2.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 765.000 $1.500 $0.500 $1.000 $0.500 $2.000
DRIVEWAYS (BASE)
SY 155.000 $25.000 $10.000 $35.000 $25.000 $90.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,000.000 $200.000 $900.000 $818.000 $1,100.000
SHORT RADIUS
LF 100.000 $30.000 $30.310 $40.000 $43.750 $55.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 3.000 $650.000 $941.000 $900.000 $525.000 $1,100.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $2,200.000 $3,144.000 $2,100.000 $2,430.000 $2,700.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $25.000 $5.000 $10.000 $15.000 $6.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 9.000 $25.000 $5.000 $10.000 $20.000 $6.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 3.000 $50.000 $22.000 $50.000 $45.000 $22.000
Totals: $435,085.000 $425,246.700 $451,535.750 $476,674.000 $595,467.000