Show Job Controls
Bid Cobra

WHARTON SH 71 (0266-06-050)

Items: 40

County: WHARTON
Length: N/A
Highway: SH 71
District: YOAKUM
Control Number: 0266-06-050
DBE Goal: N/A
Project: F 2B23(080)
Guaranty: N/A
Time: 180 WORKING DAYS
Engineer's Estimate: $3,361,293.50
Date: 08/03/2023 (2 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
RYAN SIMPER
PAUL RODRIGUEZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$3,361,293.50
$3,057,574.82
Over/Under Est: -9.04% -$303,718.68
$3,377,740.00
Over/Under Est: 0.49% $16,446.50
Amt Left: 10.47% $320,165.18
$4,014,115.00
Over/Under Est: 19.42% $652,821.50
Amt Left: 31.28% $956,540.18
Delta: -18.84% -$636,375.00
Subcontractor Percentage Amount
PBJ CONSTRUCTION 5.13% $156,853.59
ROBIN STEEL LLC 0.89% $27,212.42
AWP SAFETY 0.65% $19,874.24
HIGHWAY BARRICADES AND SERVICES, LLC 0.63% $19,262.72
ASPHALT MAINTENANCE, INC. 0.41% $12,536.06
Total: 7.71% $235,739.03

Bid Items & Bid Tabulations

40 Total 0 of 40
WHARTON  |  SH 71  |  YOAKUM  |  0266-06-050  |  08/03/2023  |  $3,361,293.50  |  F 2B23(080)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TI-ZACK CONCRETE, INC.
ENCINO LANDSCAPE, INC.
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 10.000 $1,700.000 $550.000 $1,000.000 $33,000.000
REMOVING CONC (RIPRAP)
SY 30.000 $20.000 $23.560 $30.000 $50.000
REMOVING CONC (SIDEWALKS)
SY 3,245.000 $22.000 $10.890 $30.000 $20.000
REMOVING CONC (DRIVEWAYS)
SY 7,712.000 $23.000 $20.160 $30.000 $30.000
REMOVING CONC (CURB AND GUTTER)
LF 1,891.000 $23.000 $7.480 $15.000 $20.000
REMOVING STAB BASE & ASPH PAV (0-6")
SY 982.000 $7.500 $14.400 $20.000 $20.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 360.000 $39.000 $19.630 $30.000 $50.000
BLOCK SODDING
SY 1,624.000 $6.000 $7.700 $5.000 $10.000
VEGETATIVE WATERING
MG 6.600 $150.000 $1.100 $100.000 $1,000.000
RIPRAP (CONC)(5 IN)
CY 1.000 $500.000 $1,248.350 $1,000.000 $1,500.000
RAIL (HANDRAIL)(TY B)
LF 454.000 $200.000 $88.000 $150.000 $250.000
MOBILIZATION
LS 1.000 $300,000.000 $246,987.630 $300,000.000 $400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $4,000.000 $2,750.000 $5,000.000 $8,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 300.000 $5.000 $0.110 $4.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 300.000 $1.000 $0.110 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 300.000 $8.000 $0.110 $10.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 300.000 $2.000 $0.110 $1.000 $9.000
CONC CURB & GUTTER (TY II)
LF 342.000 $55.000 $65.530 $40.000 $65.000
CONC CURB (SLOTTED)
LF 435.000 $40.000 $65.530 $60.000 $125.000
DRIVEWAYS (CONC)
SY 7,468.000 $105.000 $110.550 $100.000 $110.000
DRIVEWAYS (ACP)
SY 1,756.000 $85.000 $93.500 $100.000 $50.000
CONC SIDEWALKS (5")
SY 12,886.000 $96.000 $94.960 $100.000 $80.000
CURB RAMPS (TY 1)
SY 76.000 $175.000 $125.610 $140.000 $325.000
CURB RAMPS (TY 2)
SY 13.000 $175.000 $125.610 $140.000 $325.000
CURB RAMPS (TY 3)
SY 5.000 $175.000 $125.610 $140.000 $325.000
CURB RAMPS (TY 5)
SY 277.000 $175.000 $125.610 $140.000 $325.000
CURB RAMPS (TY 6)
SY 29.000 $125.000 $125.610 $140.000 $325.000
CURB RAMPS (TY 7)
SY 661.000 $200.000 $125.610 $140.000 $325.000
CURB RAMPS (TY 10)
SY 459.000 $175.000 $125.610 $140.000 $325.000
CURB RAMPS (TY 22)
SY 12.000 $450.000 $125.610 $140.000 $325.000
CONC SIDEWALKS (SPECIAL) (TYPE A)
SY 1.000 $320.000 $552.840 $500.000 $1,000.000
CONC SIDEWALK (SPECIAL)(RETAINING WALL)
SF 5.000 $100.000 $229.120 $100.000 $150.000
CONC MEDIAN
SY 35.000 $95.000 $155.780 $150.000 $500.000
RELOCATE EXISTING MAILBOX
EA 2.000 $200.000 $550.000 $500.000 $850.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 40.000 $500.000 $165.000 $500.000 $1,150.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 705.000 $19.000 $11.000 $20.000 $20.000
ELIM EXT PAV MRK & MRKS (24")
LF 547.000 $3.500 $1.100 $5.000 $20.000
D-GR HMA TY-D PG70-22 (EXEMPT)
TON 31.000 $200.000 $363.000 $300.000 $500.000
TMA (STATIONARY)
DAY 90.000 $300.000 $1.100 $150.000 $250.000
TMA (MOBILE OPERATION)
DAY 30.000 $300.000 $1.100 $150.000 $550.000
Totals: $3,361,293.500 $3,057,574.820 $3,377,740.000 $4,014,115.000