WHARTON SH 60 (0240-02-032)

Items: 85

County: WHARTON
Length: N/A
Highway: SH 60
District: YOAKUM
Control Number: 0240-02-032
DBE Goal: N/A
Project: BR 2022(718)
Guaranty: N/A
Time: 236 WORKING DAYS
Engineer's Estimate: $5,322,493.15
Date: 06/29/2022 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (5)
E
Engineer's Estimate
$5,322,493.15
$5,657,394.78
Over/Under Est: 6.29% $334,901.63
Over/Under Est: 7.14% $379,820.14
Amt Left: 0.79% $44,918.51
Over/Under Est: 17.87% $951,386.35
Amt Left: 10.9% $616,484.72
Delta: -10.02% -$571,566.21
Over/Under Est: 18.96% $1,009,040.19
Amt Left: 11.92% $674,138.56
Delta: -0.92% -$57,653.84
Over/Under Est: 32.23% $1,715,350.53
Amt Left: 24.4% $1,380,448.90
Delta: -11.16% -$706,310.34
Subcontractor Percentage Amount
JAMES CONSTRUCTION GROUP, LLC 15.78% $892,736.90
JB PINNACLE GROUP, LLC 1.70% $96,175.71
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC 1.61% $91,084.06
CRAIG & HEIDT, INC. 1.61% $91,084.06
JMHP, INC. 1.39% $78,637.79
FARR FOUNDATION, INC. 1.25% $70,717.43
TRAFFIC SIGNS & LINES, LLC 0.93% $52,613.77
CEN TEX HYDROSEED, INC. 0.34% $19,235.14
PENHALL COMPANY 0.17% $9,617.57
HOUSTON SAWING & DRILLING 0.17% $9,617.57
PINNACLE GRINDING AND GROOVING LLC 0.14% $7,920.35
Total: 25.09% $1,419,440.35

Bid Items & Bid Tabulations

85 Total 0 of 85
WHARTON  |  SH 60  |  YOAKUM  |  0240-02-032  |  06/29/2022  |  $5,322,493.15  |  BR 2022(718)  |  BRIDGE REPL  |  236 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
JOHN REED AND COMPANY, LLC
JAMES CONSTRUCTION GROUP, LLC
TEXAS STEEL INDUSTRIAL PLACING, LLC
RAGLE CONSTRUCTION, INC.
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 31.000 $4,000.000 $10,000.000 $17,150.000 $1,850.000 $18,000.000 $11,425.000
EXCAVATION (ROADWAY)
CY 15,688.000 $15.000 $12.000 $6.940 $11.000 $25.000 $19.000
EXCAVATION (CHANNEL)
CY 5,316.000 $15.000 $12.000 $3.610 $11.000 $15.000 $19.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 26,306.000 $20.000 $10.000 $8.820 $12.000 $19.300 $30.000
BLADING
HR 56.000 $125.000 $40.000 $141.330 $125.000 $143.000 $100.000
FURNISHING AND PLACING TOPSOIL
CY 1,596.000 $20.000 $15.000 $4.520 $50.000 $35.000 $12.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 38,198.000 $0.500 $0.150 $0.240 $0.500 $0.290 $0.240
BROADCAST SEED (TEMP) (WARM)
SY 9,550.000 $0.500 $0.150 $0.240 $0.500 $0.290 $0.180
BROADCAST SEED (TEMP) (COOL)
SY 9,550.000 $0.500 $0.150 $0.240 $0.500 $0.290 $0.180
VEGETATIVE WATERING
MG 108.000 $35.000 $30.000 $35.790 $100.000 $28.800 $35.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 5,194.000 $1.250 $1.500 $1.890 $2.750 $1.450 $1.250
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 2,963.400 $88.000 $130.000 $116.290 $110.000 $105.000 $182.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 108.300 $210.000 $285.000 $303.240 $300.000 $281.000 $225.000
LIME TRT (EXST MATL)(8")
SY 6,825.000 $4.000 $2.000 $4.980 $5.000 $3.000 $7.000
CEMENT
TON 65.200 $200.000 $150.000 $323.750 $300.000 $260.000 $255.000
CEMENT TREAT(EXIST MATL)(8")
SY 6,825.000 $4.000 $2.000 $3.620 $5.000 $2.200 $7.000
PRIME COAT (MC-30)
GAL 2,584.000 $5.500 $5.700 $5.830 $10.000 $10.000 $9.000
AGGR(TY-PE GR-3 SAC-B)
CY 152.000 $180.000 $405.000 $420.870 $550.000 $300.000 $320.000
AGGR(TY-PE GR-4 SAC-B)
CY 56.000 $180.000 $380.000 $393.890 $550.000 $300.000 $380.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 7,642.000 $5.000 $5.000 $5.290 $10.000 $5.000 $6.000
CEM STABIL BKFL
CY 167.000 $150.000 $150.000 $100.690 $225.000 $140.000 $240.000
TEMPORARY SPL SHORING
SF 1,886.000 $40.000 $50.000 $37.650 $50.000 $42.000 $55.000
DRILL SHAFT (36 IN)
LF 1,952.000 $275.000 $300.000 $233.010 $360.000 $237.000 $275.000
CL C CONC (ABUT)
CY 49.600 $1,300.000 $1,500.000 $1,500.000 $1,250.000 $1,025.000 $1,600.000
CL C CONC (CAP)
CY 81.200 $1,250.000 $1,500.000 $1,500.000 $1,450.000 $1,190.000 $1,600.000
CL C CONC (COLUMN)
CY 52.400 $1,100.000 $1,500.000 $1,500.000 $1,600.000 $1,038.000 $1,400.000
REINF CONC SLAB
SF 20,700.000 $25.000 $20.000 $30.000 $23.000 $23.000 $24.000
PRESTR CONC GIRDER (TX34)
LF 3,132.500 $165.000 $234.000 $164.000 $225.000 $160.500 $175.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,494.000 $175.000 $115.000 $185.260 $165.000 $144.000 $278.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 936.000 $90.000 $90.000 $104.170 $100.000 $67.000 $100.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 136.000 $150.000 $150.000 $205.680 $200.000 $196.000 $220.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $60,000.000 $160,000.000 $109,000.000 $105,000.000 $86,000.000 $75,000.000
REMOV STR (SMALL)
EA 4.000 $1,200.000 $500.000 $854.090 $1,000.000 $2,900.000 $1,300.000
MOBILIZATION
LS 1.000 $500,000.000 $503,000.000 $570,000.000 $440,000.000 $630,000.000 $635,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $3,500.000 $2,000.000 $2,100.000 $2,500.000 $10,000.000 $2,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,098.000 $3.000 $3.000 $3.750 $3.000 $1.500 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,098.000 $1.000 $1.000 $1.000 $1.500 $1.000 $1.500
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 990.000 $35.000 $90.000 $64.780 $75.000 $60.000 $23.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 300.000 $12.000 $5.000 $3.570 $15.000 $7.000 $34.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 990.000 $8.000 $8.000 $8.450 $15.000 $10.000 $21.000
DRIVEWAYS (SURF TREAT)
SY 680.000 $50.000 $54.000 $82.180 $95.000 $57.000 $50.000
RUMBLE STRIPS (SHOULDER)
LF 8,053.000 $0.500 $0.500 $0.350 $1.000 $2.000 $0.850
RUMBLE STRIPS (CENTERLINE)
LF 4,064.000 $0.500 $0.500 $0.350 $1.000 $2.000 $1.100
MTL W-BEAM GD FEN (TIM POST)
LF 300.000 $28.000 $31.330 $27.800 $30.000 $28.000 $24.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,200.000 $2,100.000 $1,900.000 $2,500.000 $2,105.000 $2,600.000
REMOVE METAL BEAM GUARD FENCE
LF 560.000 $2.000 $3.000 $0.500 $5.000 $2.000 $2.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $250.000 $300.000 $200.000 $300.000 $250.000 $300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,080.000 $3,200.000 $3,245.000 $3,700.000 $3,200.000 $3,100.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $350.000 $300.000 $225.000 $400.000 $150.000 $300.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,800.000 $3,000.000 $1,500.000 $1,000.000 $2,850.000 $1,000.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,000.000 $1,200.000 $600.000 $500.000 $900.000 $500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $10,500.000 $9,900.000 $8,400.000 $9,000.000 $9,500.000 $7,500.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 1.000 $275.000 $600.000 $200.000 $400.000 $285.000 $300.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $750.000 $1,074.410 $1,050.000 $1,250.000 $1,062.500 $1,100.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 2.000 $600.000 $627.110 $565.000 $1,250.000 $575.000 $600.000
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 1.000 $250.000 $295.740 $150.000 $350.000 $150.000 $165.000
REMOVE SM RD SN SUP&AM
EA 3.000 $100.000 $100.000 $50.000 $150.000 $80.000 $80.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 78.000 $22.000 $50.000 $18.000 $50.000 $25.000 $25.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 15.000 $44.000 $15.000 $12.000 $25.000 $25.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 26.000 $30.000 $30.000 $30.000 $50.000 $32.000 $32.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 15,378.000 $1.100 $1.350 $1.350 $1.500 $1.220 $1.400
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 16,010.000 $1.100 $1.350 $1.350 $1.500 $1.220 $1.400
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 862.000 $2.200 $2.000 $1.670 $2.250 $6.000 $2.000
REFL PAV MRKR TY II-A-A
EA 69.000 $6.750 $10.000 $10.000 $15.000 $0.280 $10.000
ELIM EXT PAV MRK & MRKS (4")
LF 2,120.000 $1.000 $0.700 $0.700 $1.000 $0.830 $0.750
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 3,492.000 $2.000 $1.000 $2.030 $2.000 $0.950 $10.000
D-GR HMA TY-B PG76-22
TON 2,109.400 $110.000 $122.000 $128.420 $220.000 $150.000 $157.000
D-GR HMA TY-D SAC-B PG70-22
TON 1,577.800 $115.000 $123.000 $129.500 $220.000 $150.000 $180.000
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 1,541.700 $115.000 $128.000 $135.970 $220.000 $150.000 $180.000
TACK COAT
GAL 2,821.000 $5.000 $2.500 $2.430 $5.000 $10.000 $4.400
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $10,000.000 $8,093.660 $11,000.000 $20,000.000 $10,000.000
TMA (STATIONARY)
DAY 20.000 $300.000 $400.000 $631.300 $320.000 $370.000 $350.000
TMA (MOBILE OPERATION)
DAY 20.000 $300.000 $600.000 $883.510 $250.000 $72.000 $350.000
HPPM-RIB W/RET REQ TYI(W)4"(SLD)100MIL
LF 8,953.000 $1.000 $2.250 $2.250 $2.500 $0.990 $2.300
HPPM-RIB W/RET REQ TYI(Y)4"(BRK)100MIL
LF 1,129.000 $1.000 $2.250 $2.250 $2.500 $4.000 $2.300
HPPM-RIB W/RET REQ TYI(Y)4"(SLD)100MIL
LF 914.000 $1.000 $2.250 $2.250 $2.500 $0.990 $2.300
PAVEMENT SEALER 4"
LF 1,013.000 $1.000 $0.170 $0.170 $1.000 $0.320 $0.170
1
CMP (GAL STL 24 IN)
LF 40.000 $100.000 $82.870 $106.040 $0.000 $117.000 $0.000
1
CMP (GAL STL 36 IN)
LF 326.000 $135.000 $94.300 $118.760 $0.000 $126.000 $0.000
1
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 2.000 $1,600.000 $1,468.500 $1,450.820 $0.000 $4,900.000 $0.000
1
SET (TY II) (36 IN) (CMP) (6: 1) (P)
EA 12.000 $2,500.000 $4,219.500 $1,862.600 $0.000 $4,900.000 $0.000
1A
SET (TY II) (24 IN) (HDPE) (6: 1) (P)
EA 2.000 $1,600.000 $0.000 $0.000 $2,000.000 $4,900.000 $3,000.000
1A
SET (TY II) (36 IN) (HDPE) (6: 1) (P)
EA 12.000 $2,500.000 $0.000 $0.000 $3,750.000 $4,900.000 $5,000.000
1A
THERMO PIPE(24")(PP)(TY S)(TY II)
LF 40.000 $100.000 $0.000 $0.000 $60.000 $157.000 $91.000
1A
THERMO PIPE(36")(PP)(TY S)(TY II)
LF 326.000 $135.000 $0.000 $0.000 $90.000 $140.000 $120.000
Totals: $5,403,703.150 $5,657,394.780 $5,702,313.315 $6,273,879.500 $6,452,053.340 $7,037,843.680