Show Job Controls
Bid Cobra

WHARTON US 59 (0089-06-093)

Items: 62

County: WHARTON
Length: N/A
Highway: US 59
District: YOAKUM
Control Number: 0089-06-093
DBE Goal: N/A
Project: C 89-6-93
Guaranty: N/A
Time: 72 WORKING DAYS
Engineer's Estimate: $1,837,208.95
Date: 06/01/2023 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
RYAN SIMPER
PAUL RODRIGUEZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$1,837,208.95
$2,182,905.02
Over/Under Est: 18.82% $345,696.07
Over/Under Est: 30.3% $556,754.41
Amt Left: 9.67% $211,058.34
Over/Under Est: 48.75% $895,632.68
Amt Left: 25.19% $549,936.61
Delta: -14.16% -$338,878.27
Subcontractor Percentage Amount
TRAFFIC SIGNS & LINES, LLC 4.62% $100,850.21
CEN TEX HYDROSEED, INC. 1.20% $26,194.86
PROFESSIONAL TRAFFIC CONTROL LLC 0.32% $6,985.30
Total: 6.14% $134,030.37

Bid Items & Bid Tabulations

62 Total 0 of 62
WHARTON  |  US 59  |  YOAKUM  |  0089-06-093  |  06/01/2023  |  $1,837,208.95  |  C 89-6-93  |  HAZARD ELIM & SAFETY  |  72 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
JAMES CONSTRUCTION GROUP, LLC
MB WESTERN INDUSTRIAL CONTRACTING COMPANY
SUBGRADE WIDENING (ORD COMP)
STA 67.300 $1,500.000 $861.000 $1,500.000 $550.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 942.000 $23.000 $52.500 $45.500 $50.000
BLADING
HR 50.000 $120.000 $132.000 $117.000 $185.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 29,018.000 $0.500 $0.420 $0.300 $0.400
BROADCAST SEED (TEMP) (WARM)
SY 7,255.000 $0.500 $0.390 $0.240 $0.450
BROADCAST SEED (TEMP) (COOL)
SY 7,255.000 $0.500 $0.390 $0.240 $0.450
VEGETATIVE WATERING
MG 244.600 $60.000 $49.000 $28.000 $50.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 169.000 $250.000 $237.000 $360.000 $400.000
LIME TRT (SUBGRADE)(6")
SY 14,138.000 $4.750 $6.000 $11.000 $10.000
AGGR(TY-PE GR-4 SAC-B)
CY 97.000 $200.000 $491.000 $575.000 $450.020
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 4,299.000 $5.750 $3.850 $4.000 $7.820
MOBILIZATION
LS 1.000 $164,000.000 $211,000.000 $235,000.000 $225,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $6,000.000 $1,250.000 $11,300.000 $7,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 100.000 $50.000 $49.000 $30.000 $66.380
ROCK FILTER DAMS (REMOVE)
LF 100.000 $15.000 $16.500 $15.000 $15.980
TEMP SEDMT CONT FENCE (INSTALL)
LF 520.000 $4.000 $7.000 $3.500 $7.220
TEMP SEDMT CONT FENCE (REMOVE)
LF 520.000 $1.000 $1.650 $1.000 $1.820
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 3,690.000 $65.000 $91.500 $50.000 $90.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 4,110.000 $10.000 $8.650 $16.000 $25.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 3,690.000 $15.000 $11.650 $16.000 $25.000
RUMBLE STRIPS (SHOULDER)
LF 6,650.000 $0.250 $0.430 $1.750 $2.500
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,000.000 $3,260.000 $2,981.000 $3,577.220
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,200.000 $1,630.000 $1,491.000 $1,789.220
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $9,500.000 $16,700.000 $15,231.000 $18,277.220
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $600.000 $865.000 $791.000 $949.220
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 2.000 $700.000 $1,156.000 $1,057.000 $1,268.420
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 2.000 $800.000 $1,283.000 $1,173.000 $1,407.620
REMOVE SM RD SN SUP&AM
EA 6.000 $200.000 $164.000 $150.000 $180.020
INSTL OM ASSM (OM-2Y)(WC)GND
EA 6.000 $150.000 $137.000 $125.000 $150.020
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 1,683.000 $0.600 $1.100 $1.770 $1.220
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
LF 448.000 $0.600 $1.100 $1.770 $1.220
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 6,730.000 $0.600 $0.770 $1.240 $0.860
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 1,092.000 $0.800 $1.530 $2.480 $1.700
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,680.000 $0.700 $1.530 $2.480 $1.700
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 6,730.000 $0.600 $0.820 $2.480 $0.920
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 1,920.000 $0.600 $0.710 $1.330 $0.800
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 6,650.000 $0.600 $0.670 $1.150 $0.750
WK ZN PAV MRK REMOV (W)8"(DOT)
LF 132.000 $1.000 $5.470 $1.080 $2.420
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 1,465.000 $0.800 $1.530 $2.480 $1.700
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 12,345.000 $0.600 $0.770 $1.240 $0.860
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
LF 448.000 $1.000 $1.640 $2.660 $1.820
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 1,092.000 $1.500 $1.920 $3.120 $2.130
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,680.000 $1.250 $1.920 $3.120 $2.130
PREFAB PAV MRK TY C (W) (ARROW)
EA 8.000 $250.000 $310.000 $501.370 $339.620
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 2.000 $250.000 $634.000 $1,027.550 $696.020
PREFAB PAV MRK TY C (W) (WORD)
EA 8.000 $275.000 $432.000 $699.800 $474.020
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 10.000 $50.000 $34.000 $54.920 $37.220
REFL PAV MRKR TY II-C-R
EA 302.000 $6.000 $7.650 $12.400 $8.420
ELIM EXT PAV MRK & MRKS (6")
LF 2,830.000 $0.500 $0.550 $0.890 $0.620
ELIM EXT PAV MRK & MRKS (8")
LF 380.000 $0.750 $0.820 $1.330 $0.920
D-GR HMA TY-B PG64-22
TON 5,892.000 $95.000 $110.000 $121.000 $150.020
D-GR HMA TY-D SAC-B PG70-22
TON 1,350.000 $110.000 $145.750 $150.500 $174.020
TACK COAT
GAL 1,339.000 $4.500 $3.000 $2.450 $8.120
PFC-C (PG76 MIX) SAC-A
TON 771.000 $145.000 $204.000 $237.000 $270.020
TACK COAT
GAL 1,166.000 $4.500 $3.000 $2.500 $8.120
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $7,500.000 $9,255.000 $5,500.000 $5,000.000
TMSP RADAR SPEED CONTROL MONITOR
EA 4.000 $8,000.000 $11,000.000 $7,700.000 $5,000.000
TMA (STATIONARY)
DAY 15.000 $250.000 $207.000 $295.000 $250.000
TMA (MOBILE OPERATION)
DAY 15.000 $450.000 $680.000 $670.000 $250.000
HPPM-RIB W/RET REQ TYI(W)6"(BRK)100MIL
LF 1,683.000 $1.000 $0.850 $1.380 $0.950
HPPM-RIB W/RET REQ TYI(W)6"(SLD)100MIL
LF 6,730.000 $1.000 $0.850 $1.380 $0.950
HPPM-RIB W/RET REQ TYI(Y)6"(SLD)100MIL
LF 6,790.000 $1.000 $0.850 $1.380 $0.950
Totals: $1,837,208.950 $2,182,905.020 $2,393,963.360 $2,732,841.630