PREPARING ROW
|
STA
|
96.000
|
$2,500.000
|
$500.000
|
$1,000.000
|
$1,000.000
|
|
|
REMOV CONC (MOWSTRIP)
|
SY
|
20.000
|
$27.500
|
$50.000
|
$70.000
|
$42.000
|
|
|
REMOV CONC (CURB & GUTTER)
|
LF
|
5,880.000
|
$14.000
|
$7.000
|
$4.000
|
$8.300
|
|
|
RMV (20") TRT/UNTRT BASE & ASPH PAV
|
CY
|
2,481.000
|
$55.000
|
$20.000
|
$16.000
|
$28.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
8,982.400
|
$17.000
|
$10.000
|
$20.000
|
$20.550
|
|
|
EMBANK (FNL)(OC)(TY C)
|
CY
|
10,026.500
|
$23.330
|
$17.000
|
$14.000
|
$27.000
|
|
|
BACKFILL (TY B)
|
STA
|
96.000
|
$115.000
|
$500.000
|
$220.000
|
$150.000
|
|
|
DRILL SEED (PERM_RURAL_CLAY)
|
AC
|
82.300
|
$567.500
|
$550.000
|
$1,400.000
|
$1,200.000
|
|
|
DRILL SEED (TEMP_WARM)
|
AC
|
82.300
|
$567.500
|
$550.000
|
$500.000
|
$400.000
|
|
|
FL BS (RDWY DEL)(TY E GR 1-2)(FNL POS)
|
CY
|
3,889.000
|
$120.000
|
$70.000
|
$64.000
|
$72.000
|
|
|
CEMENT
|
TON
|
130.000
|
$293.000
|
$200.000
|
$265.000
|
$230.000
|
|
|
CEMENT TRT (NEW BASE)(6")
|
SY
|
24,414.000
|
$6.500
|
$1.500
|
$3.500
|
$2.450
|
|
|
CEMENT
|
TON
|
1,392.000
|
$300.000
|
$200.000
|
$262.000
|
$230.000
|
|
|
ASPHALT BINDER (PG 64-22)
|
TON
|
3,479.000
|
$600.000
|
$550.000
|
$620.000
|
$689.000
|
|
|
FOAM ASPH TRT (EXIST MATL) (12")
|
SY
|
241,153.000
|
$6.500
|
$3.000
|
$5.000
|
$5.850
|
|
|
PRIME COAT (RC-250)
|
GAL
|
50,440.000
|
$6.000
|
$4.250
|
$6.000
|
$4.550
|
|
|
AGGR (TY-PB, GR-5)(SAC-B)
|
CY
|
1,802.000
|
$110.000
|
$115.000
|
$180.000
|
$189.000
|
|
|
D-GR HMA TY-B SAC-B PG70-22
|
TON
|
71,079.000
|
$120.000
|
$105.000
|
$104.000
|
$110.000
|
|
|
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
|
TON
|
35,344.000
|
$150.000
|
$135.000
|
$168.000
|
$169.000
|
|
|
PLANE ASPH CONC PAV(4")
|
SY
|
233,897.000
|
$4.500
|
$1.250
|
$2.400
|
$2.150
|
|
|
PLAN ASPH CONC PAV (4"-7.5")
|
SY
|
3,912.000
|
$5.000
|
$4.500
|
$5.000
|
$6.300
|
|
|
CONC PVMT (CRCP) (12")
|
SY
|
24,735.000
|
$110.000
|
$125.000
|
$120.000
|
$116.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
209.200
|
$265.000
|
$350.000
|
$150.000
|
$145.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
4,644.000
|
$25.000
|
$20.000
|
$14.000
|
$13.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
52.800
|
$482.000
|
$425.000
|
$440.000
|
$400.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
10.000
|
$358.000
|
$300.000
|
$270.000
|
$300.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
412.000
|
$707.000
|
$500.000
|
$520.000
|
$485.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
141.000
|
$650.000
|
$550.000
|
$620.000
|
$515.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
92.000
|
$800.000
|
$700.000
|
$680.000
|
$495.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
100.000
|
$117.500
|
$100.000
|
$110.000
|
$100.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
100.000
|
$102.000
|
$125.000
|
$144.000
|
$132.000
|
|
|
INLET (COMPL)(POD)(SFG)(3FTX3FT)
|
EA
|
6.000
|
$5,500.000
|
$7,000.000
|
$4,000.000
|
$3,750.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 5 FT)(4:1)(C)
|
EA
|
16.000
|
$12,000.000
|
$12,000.000
|
$15,000.000
|
$14,750.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 6 FT)(4:1)(C)
|
EA
|
26.000
|
$16,000.000
|
$8,000.000
|
$18,000.000
|
$16,750.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,155.000
|
$4,000.000
|
$1,500.000
|
$1,381.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,560.000
|
$5,000.000
|
$1,600.000
|
$1,392.000
|
|
|
ADJUSTING INLETS
|
EA
|
6.000
|
$500.000
|
$2,500.000
|
$1,000.000
|
$1,000.000
|
|
|
ADJUSTING MANHOLES (CAP)
|
EA
|
2.000
|
$3,000.000
|
$3,000.000
|
$2,500.000
|
$2,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
10.000
|
$1,500.000
|
$3,000.000
|
$4,000.000
|
$3,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
12.000
|
$1,095.000
|
$1,500.000
|
$2,000.000
|
$1,850.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
13.000
|
$3,500.000
|
$2,000.000
|
$2,500.000
|
$2,250.000
|
|
|
REMOV STR (PIPE)
|
LF
|
20.000
|
$30.000
|
$50.000
|
$46.000
|
$43.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,674,908.400
|
$2,500,000.000
|
$1,380,000.000
|
$2,100,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
24.000
|
$4,000.000
|
$10,000.000
|
$2,500.000
|
$8,200.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$11,000.000
|
$25,000.000
|
$34,000.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
453.000
|
$270.000
|
$100.000
|
$280.000
|
$165.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
136.000
|
$205.000
|
$100.000
|
$70.000
|
$60.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
873.000
|
$50.000
|
$120.000
|
$160.000
|
$150.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
873.000
|
$25.000
|
$22.000
|
$16.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$20.000
|
$20.000
|
$50.000
|
$45.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$20.000
|
$10.000
|
$17.000
|
$15.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
56.000
|
$100.000
|
$75.000
|
$170.000
|
$146.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,242.000
|
$3.000
|
$7.000
|
$5.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,242.000
|
$3.000
|
$2.000
|
$2.000
|
$1.500
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
944.000
|
$105.000
|
$150.000
|
$180.000
|
$153.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
7.000
|
$6,504.000
|
$3,500.000
|
$7,000.000
|
$5,100.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
9,120.000
|
$60.000
|
$35.000
|
$28.000
|
$37.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
5,160.000
|
$15.000
|
$18.000
|
$26.000
|
$24.500
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
9,120.000
|
$12.500
|
$28.000
|
$17.000
|
$24.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
3,787.000
|
$40.000
|
$35.000
|
$46.000
|
$42.500
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,383.000
|
$66.000
|
$80.000
|
$115.000
|
$108.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
114,189.000
|
$0.150
|
$0.100
|
$0.150
|
$0.090
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
13,200.000
|
$0.450
|
$0.250
|
$0.150
|
$0.170
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
925.000
|
$30.000
|
$24.000
|
$25.000
|
$26.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
16.000
|
$2,500.000
|
$1,900.000
|
$3,160.000
|
$2,200.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$1,750.000
|
$1,400.000
|
$1,500.000
|
$1,250.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
850.000
|
$3.500
|
$3.000
|
$3.300
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
$250.000
|
$275.000
|
$300.000
|
$220.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
19.000
|
$2,650.000
|
$3,300.000
|
$3,610.000
|
$3,050.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
19.000
|
$325.000
|
$300.000
|
$320.000
|
$335.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
60.000
|
$1,400.000
|
$700.000
|
$1,020.000
|
$1,100.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$1,000.000
|
$600.000
|
$820.000
|
$700.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$14,000.000
|
$10,000.000
|
$7,080.000
|
$8,300.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
1.000
|
$3,085.000
|
$4,500.000
|
$4,940.000
|
$4,500.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
357.000
|
$22.000
|
$21.000
|
$20.000
|
$21.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
245.000
|
$25.000
|
$50.000
|
$6.500
|
$50.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
122.000
|
$2.630
|
$2.000
|
$2.200
|
$1.850
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
244.000
|
$2.630
|
$2.250
|
$3.000
|
$2.200
|
|
|
TRAY CABLE (3 CONDR) (12 AWG)
|
LF
|
1,040.000
|
$5.750
|
$2.750
|
$3.300
|
$2.650
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
4.000
|
$2,005.000
|
$1,400.000
|
$1,400.000
|
$1,300.000
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
3.000
|
$2,166.000
|
$1,600.000
|
$1,460.000
|
$1,500.000
|
|
|
REMOVE GROUND BOX
|
EA
|
3.000
|
$692.000
|
$450.000
|
$550.000
|
$450.000
|
|
|
RELOCATE ELECTRICAL SERVICES
|
EA
|
1.000
|
$3,800.000
|
$3,000.000
|
$2,760.000
|
$2,800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
110.000
|
$600.000
|
$700.000
|
$845.000
|
$675.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
15.000
|
$950.000
|
$775.000
|
$1,030.000
|
$775.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
118.000
|
$118.000
|
$100.000
|
$98.000
|
$100.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
2.000
|
$9,148.000
|
$7,500.000
|
$8,170.000
|
$13,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
43.000
|
$22.000
|
$32.000
|
$49.000
|
$32.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
24.000
|
$45.000
|
$75.000
|
$98.000
|
$75.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
43.000
|
$15.500
|
$15.000
|
$27.000
|
$15.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
8,448.000
|
$1.200
|
$1.000
|
$1.000
|
$0.800
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
5,606.000
|
$0.500
|
$1.000
|
$2.000
|
$1.600
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
4,138.000
|
$2.250
|
$1.000
|
$2.000
|
$1.600
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
1,382.000
|
$2.000
|
$1.000
|
$1.000
|
$0.960
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,692.000
|
$2.500
|
$1.000
|
$1.000
|
$0.960
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
144.000
|
$9.500
|
$16.000
|
$18.000
|
$16.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
14.000
|
$198.000
|
$175.000
|
$190.000
|
$175.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
6.000
|
$215.000
|
$325.000
|
$350.000
|
$325.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
20.000
|
$291.000
|
$250.000
|
$270.000
|
$250.000
|
|
|
PAVEMENT SLER 6"
|
LF
|
204,614.000
|
$0.750
|
$0.250
|
$0.300
|
$0.260
|
|
|
PAVEMENT SLER 24"
|
LF
|
144.000
|
$1.650
|
$1.100
|
$1.200
|
$1.100
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
9,241.000
|
$0.650
|
$0.900
|
$1.000
|
$0.880
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
84,727.000
|
$0.500
|
$0.650
|
$0.700
|
$0.630
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
83,580.000
|
$0.500
|
$0.650
|
$0.700
|
$0.630
|
|
REFL PAV MRKR TY I-C
|
EA
|
762.000
|
$5.500
|
$7.500
|
$8.000
|
$7.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,630.000
|
$4.700
|
$5.500
|
$6.000
|
$5.500
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
12,444.000
|
$0.600
|
$1.000
|
$0.300
|
$0.250
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
5.000
|
$92.000
|
$35.000
|
$38.000
|
$35.000
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
4.000
|
$150.000
|
$35.000
|
$38.000
|
$35.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$5,200.000
|
$6,000.000
|
$7,030.000
|
$7,200.000
|
|
|
INS HY TRF SIG (DPT SUP CNT & CAB)(FLA)
|
EA
|
1.000
|
$8,920.000
|
$12,500.000
|
$3,600.000
|
$12,600.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
534.000
|
$2.670
|
$2.500
|
$3.000
|
$2.450
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
1.140
|
$14,000.000
|
$25,000.000
|
$22,000.000
|
$20,176.000
|
|
|
BONDING COURSE
|
GAL
|
49,175.000
|
$5.000
|
$4.000
|
$4.700
|
$0.100
|
|
|
CONTINUOUS GRINDING-CONCRETE PAVEMENT
|
SY
|
18,967.000
|
$12.000
|
$5.500
|
$6.500
|
$8.830
|
|
|
ITS RADIO(SNGL)(5 GHZ)-I-U
|
EA
|
1.000
|
$10,800.000
|
$6,000.000
|
$5,400.000
|
$5,800.000
|
|
|
REMOVE ITS RADIO
|
EA
|
2.000
|
$3,127.000
|
$600.000
|
$1,050.000
|
$580.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$9,500.000
|
$5,000.000
|
$18,000.000
|
$9,200.000
|
|
Totals: |
$30,716,266.505
|
$26,042,349.500
|
$27,693,592.150
|
$28,988,807.250
|