REMOVING CONC (RIPRAP)
|
CY
|
2.000
|
$150.000
|
$800.000
|
$84.000
|
$100.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
98.080
|
$15.000
|
$30.000
|
$12.600
|
$20.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
89.000
|
$8.000
|
$25.000
|
$8.400
|
$12.000
|
|
|
BACKFILL (TY A)
|
STA
|
22.000
|
$145.000
|
$2,000.000
|
$197.400
|
$600.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,782.000
|
$25.000
|
$47.500
|
$18.900
|
$30.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
7.440
|
$450.000
|
$1,250.000
|
$529.200
|
$700.000
|
|
|
CL C CONC (RAC-R)
|
CY
|
29.330
|
$1,500.000
|
$950.000
|
$1,102.500
|
$1,500.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
35.000
|
$400.000
|
$575.000
|
$425.250
|
$600.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
190.300
|
$450.000
|
$500.000
|
$439.530
|
$600.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
265.000
|
$450.000
|
$600.000
|
$446.250
|
$700.000
|
|
|
RAIL (TY C221)
|
LF
|
185.500
|
$80.000
|
$300.000
|
$71.930
|
$220.000
|
|
|
RETROFIT RAIL (TY T223)
|
LF
|
264.000
|
$210.000
|
$275.000
|
$225.750
|
$220.000
|
|
|
CONC BOX CULV (7 FT X 4 FT)(EXTEND)
|
LF
|
19.000
|
$550.000
|
$1,450.000
|
$740.250
|
$800.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
7.000
|
$8,000.000
|
$5,850.000
|
$13,721.900
|
$6,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
20.000
|
$8,500.000
|
$5,200.000
|
$12,650.550
|
$7,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(4:1) (C)
|
EA
|
15.000
|
$11,000.000
|
$6,105.000
|
$13,286.830
|
$8,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
4.000
|
$12,000.000
|
$8,000.000
|
$9,987.950
|
$9,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
8.000
|
$8,000.000
|
$7,250.000
|
$11,278.290
|
$9,000.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
11.000
|
$13,000.000
|
$8,250.000
|
$14,217.150
|
$12,000.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 7 FT)(4:1) (C)
|
EA
|
6.000
|
$15,000.000
|
$7,950.000
|
$14,963.420
|
$13,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
22.000
|
$1,450.000
|
$2,500.000
|
$1,982.400
|
$1,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
12.000
|
$1,250.000
|
$315.000
|
$1,312.500
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$178,906.160
|
$170,000.000
|
$137,914.190
|
$300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$5,500.000
|
$9,000.000
|
$10,000.000
|
$5,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
975.000
|
$48.000
|
$91.840
|
$23.100
|
$18.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
975.000
|
$12.500
|
$34.030
|
$8.660
|
$8.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,092.000
|
$24.500
|
$19.610
|
$23.100
|
$14.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,092.000
|
$9.000
|
$7.370
|
$8.660
|
$6.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
14.000
|
$70.000
|
$70.000
|
$68.250
|
$90.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
560.000
|
$2.250
|
$10.160
|
$2.630
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
560.000
|
$0.650
|
$2.670
|
$0.530
|
$1.000
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
160.000
|
$60.000
|
$150.000
|
$186.590
|
$200.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
8.000
|
$5,000.000
|
$4,000.000
|
$3,675.000
|
$6,000.000
|
|
|
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
660.000
|
$25.000
|
$73.540
|
$46.040
|
$60.000
|
|
|
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
2,100.000
|
$12.000
|
$14.750
|
$30.380
|
$25.000
|
|
|
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
840.000
|
$15.000
|
$16.000
|
$46.040
|
$25.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
35.000
|
$22.000
|
$85.000
|
$21.000
|
$18.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
57.000
|
$22.000
|
$65.000
|
$23.100
|
$19.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
98.000
|
$50.000
|
$95.000
|
$42.000
|
$75.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
1.000
|
$2,000.000
|
$2,000.000
|
$2,257.500
|
$2,000.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,925.000
|
$20.000
|
$26.590
|
$18.900
|
$28.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,500.000
|
$1,938.840
|
$1,894.200
|
$300.000
|
|
|
SHORT RADIUS
|
LF
|
50.000
|
$30.000
|
$35.310
|
$31.500
|
$60.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,250.000
|
$1,501.210
|
$1,207.500
|
$800.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
550.000
|
$60.000
|
$94.160
|
$57.750
|
$600.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$3.000
|
$1.766
|
$2.680
|
$4.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$200.000
|
$171.200
|
$131.250
|
$400.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$350.000
|
$267.500
|
$164.850
|
$300.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
35.000
|
$2,250.000
|
$3,121.190
|
$2,525.250
|
$1,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$250.000
|
$251.450
|
$194.250
|
$400.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$10,000.000
|
$10,500.000
|
$11,812.500
|
$4,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
17.000
|
$1,500.000
|
$1,750.000
|
$1,968.750
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,000.000
|
$500.000
|
$997.500
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$20,000.000
|
$34,500.000
|
$44,100.000
|
$25,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
32.000
|
$20.000
|
$3.210
|
$21.000
|
$40.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
160.000
|
$25.000
|
$3.750
|
$23.100
|
$40.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1 (BR)
|
EA
|
11.000
|
$20.000
|
$3.750
|
$63.000
|
$60.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(FLX)SRF
|
EA
|
160.000
|
$25.000
|
$41.730
|
$78.750
|
$60.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
64.000
|
$60.000
|
$19.790
|
$26.250
|
$60.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
32.000
|
$25.000
|
$6.420
|
$29.400
|
$60.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
|
EA
|
11.000
|
$20.000
|
$6.950
|
$29.400
|
$60.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,260.000
|
$3.300
|
$4.280
|
$4.200
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
5,319.000
|
$0.660
|
$1.280
|
$1.260
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
216.000
|
$6.500
|
$7.490
|
$7.350
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
50,400.000
|
$0.700
|
$0.790
|
$0.780
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
7,632.000
|
$1.250
|
$0.650
|
$0.370
|
$2.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
4,865.000
|
$0.300
|
$0.690
|
$0.680
|
$3.000
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
27,265.000
|
$0.300
|
$0.690
|
$0.680
|
$3.000
|
|
|
REMOVAL OF GROUND BOXES
|
EA
|
1.000
|
$400.000
|
$2,500.000
|
$1,575.000
|
$40.000
|
|
|
INSTALL OF GROUND BOXES
|
EA
|
1.000
|
$1,000.000
|
$3,500.000
|
$2,625.000
|
$1,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$15,000.000
|
$9,975.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
4.000
|
$500.000
|
$15,000.000
|
$11,550.000
|
$18,000.000
|
|
Totals: |
$2,121,686.400
|
$2,482,189.990
|
$2,515,060.535
|
$2,878,482.600
|