Show Job Controls
Bid Cobra

WEBB VA (0922-00-062)

Items: 78

County: WEBB
Length: N/A
Highway: VA
District: LAREDO
Control Number: 0922-00-062
DBE Goal: N/A
Project: STP 1502(256)
Guaranty: N/A
Time: 184 WORKING DAYS
Engineer's Estimate: $1,693,999.15
Date: 01/04/2017 (9 years ago)
Contract Number: N/A
Type: CONSTRUCTING CURB RAMPS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$1,693,999.15
$1,680,038.50
Over/Under Est: -0.82% -$13,960.65
$2,046,450.80
Over/Under Est: 20.81% $352,451.65
Amt Left: 21.81% $366,412.30
$2,298,873.34
Over/Under Est: 35.71% $604,874.19
Amt Left: 36.83% $618,834.84
Delta: -12.33% -$252,422.54
Over/Under Est: 124.9% $2,115,806.55
Amt Left: 126.77% $2,129,767.20
Delta: -65.72% -$1,510,932.36

Bid Items & Bid Tabulations

78 Total 0 of 78
WEBB  |  VA  |  LAREDO  |  0922-00-062  |  01/04/2017  |  $1,693,999.15  |  STP 1502(256)  |  CONSTRUCTING CURB RAMPS  |  184 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ENCINO LANDSCAPE, INC.
TI-ZACK CONCRETE, INC.
ALTUS CONSTRUCTION LLC
ANDERSON COLUMBIA CO., INC.
REMOVING CONC (RIPRAP)
SY 524.000 $15.000 $20.000 $22.000 $14.330 $35.000
REMOVING CONC (FOUNDATIONS)
CY 10.000 $200.000 $200.000 $550.000 $267.730 $380.000
REMOVING CONC (DRIVEWAYS)
SY 407.000 $20.000 $20.000 $25.000 $14.650 $28.000
REMOVING CONC (RETAINING WALLS)
SY 21.000 $15.000 $20.000 $25.000 $60.380 $180.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 3,715.000 $10.000 $5.000 $10.000 $12.920 $12.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 246.000 $20.000 $20.000 $25.000 $27.480 $45.000
REMOVE CONC (RAIL)
LF 6.000 $35.000 $100.000 $100.000 $25.420 $100.000
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 456.000 $15.000 $20.000 $25.000 $8.970 $16.000
COMPOST MANUF TOPSOIL (4")
SY 2,712.000 $2.500 $3.000 $5.000 $4.420 $10.000
BLOCK SODDING
SY 2,712.000 $6.000 $5.000 $8.000 $2.970 $8.000
VEGETATIVE WATERING
MG 42.310 $30.000 $100.000 $250.000 $35.840 $200.000
D-GR HMA(SQ) TY-C PG76-22
TON 4.000 $120.000 $1,000.000 $400.000 $301.950 $800.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 35.000 $100.000 $100.000 $79.000 $23.970 $100.000
CL A CONC (MISC)
CY 1.100 $600.000 $2,000.000 $2,000.000 $2,068.860 $2,500.000
CL C CONC (MISC)
CY 3.800 $800.000 $2,000.000 $1,500.000 $999.210 $2,800.000
RETAINING WALL (CAST - IN - PLACE)
SF 1,739.000 $80.000 $50.000 $60.000 $21.470 $120.000
RIPRAP (CONC)(6 IN)
CY 95.700 $450.000 $1,000.000 $750.000 $477.560 $500.000
RAIL (HANDRAIL)(TY B)
LF 41.000 $80.000 $100.000 $150.000 $58.240 $180.000
GRATE & FRAME
EA 15.000 $1,500.000 $2,000.000 $1,200.000 $1,127.280 $2,000.000
ADJUSTING MANHOLES
EA 6.000 $900.000 $500.000 $500.000 $2,936.600 $3,000.000
MOBILIZATION
LS 1.000 $125,637.000 $350,000.000 $200,000.000 $210,000.000 $480,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $2,200.000 $4,000.000 $1,500.000 $8,650.480 $24,000.000
SANDBAGS FOR EROSION CONTROL
EA 4,000.000 $5.000 $1.000 $0.100 $9.390 $6.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,000.000 $3.000 $3.000 $0.100 $3.650 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,000.000 $1.000 $1.000 $0.100 $1.200 $0.500
REMOVE AND RELAY PAVERS
SY 86.000 $50.000 $100.000 $115.000 $48.760 $220.000
CONC CURB (TY II)
LF 113.000 $22.000 $20.000 $35.000 $33.550 $55.000
CONC CURB & GUTTER (TY I)
LF 7.000 $20.000 $50.000 $45.000 $53.680 $67.000
CONC CURB & GUTTER (TY II)
LF 3,878.000 $24.000 $35.000 $40.000 $22.240 $43.000
DRIVEWAYS (CONC)
SY 561.000 $70.000 $70.000 $85.000 $75.930 $216.000
DRIVEWAYS (ACP)
SY 354.000 $60.000 $50.000 $65.000 $54.950 $160.000
CONC SIDEWALKS (4")
SY 3,656.000 $53.000 $65.000 $125.000 $86.800 $114.000
CURB RAMPS (TY 1)
SY 172.000 $120.000 $65.000 $125.000 $140.670 $360.000
CURB RAMPS (TY 2)
SY 1,090.000 $120.000 $65.000 $125.000 $86.900 $210.000
CURB RAMPS (TY 3)
SY 1,387.000 $120.000 $65.000 $125.000 $250.000 $190.000
CURB RAMPS (TY 5)
SY 24.000 $120.000 $65.000 $125.000 $109.270 $460.000
CURB RAMPS (TY 6)
SY 906.000 $120.000 $65.000 $125.000 $146.740 $250.000
CURB RAMPS (TY 7)
SY 416.000 $120.000 $65.000 $125.000 $157.880 $280.000
CURB RAMPS (TY 10)
SY 714.000 $120.000 $65.000 $125.000 $131.570 $230.000
CURB RAMPS (TY 22)
SY 195.000 $120.000 $65.000 $125.000 $327.530 $450.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 4.000 $200.000 $500.000 $125.000 $253.790 $100.000
REMOVE RD IL ASM (SHOE-BASE)
EA 1.000 $200.000 $100.000 $150.000 $298.780 $300.000
CONDT (PVC) (SCH 80) (3")
LF 500.000 $18.000 $20.000 $15.000 $13.710 $50.000
ELEC CONDR (NO.6) BARE
LF 50.000 $3.000 $10.000 $2.000 $4.750 $3.000
GROUND BOX TY D (162922)
EA 93.000 $600.000 $500.000 $550.000 $759.200 $1,000.000
REMOVE GROUND BOX
EA 58.000 $100.000 $100.000 $50.000 $375.170 $175.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $1,200.000 $1,000.000 $250.000 $904.360 $650.000
RELOCATE SM RD SN SUP&AM TY S80
EA 115.000 $350.000 $200.000 $150.000 $419.380 $425.000
REMOVE SM RD SN SUP&AM
EA 1.000 $150.000 $100.000 $750.000 $128.160 $100.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 45.000 $2.000 $4.000 $5.000 $2.080 $5.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 3,446.000 $4.000 $5.500 $5.000 $3.530 $3.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,285.000 $6.000 $9.000 $9.000 $5.860 $7.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 16.000 $35.000 $50.000 $50.000 $100.650 $60.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 25.000 $6.000 $14.000 $15.000 $7.310 $15.000
PAVEMENT SEALER 4"
LF 96.000 $0.400 $1.000 $1.000 $0.400 $2.500
PAVEMENT SEALER 8"
LF 45.000 $0.800 $2.000 $1.250 $0.600 $2.500
PAVEMENT SEALER 12"
LF 3,446.000 $0.900 $1.500 $1.250 $2.310 $1.700
PAVEMENT SEALER 24"
LF 1,310.000 $1.800 $4.000 $3.800 $3.890 $3.300
PAVEMENT SEALER (YLD TRI)
EA 16.000 $5.000 $6.000 $15.000 $22.180 $22.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 20.000 $1.000 $3.000 $5.000 $0.670 $5.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 76.000 $1.000 $3.000 $2.500 $0.810 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 215.000 $1.000 $2.000 $2.500 $0.880 $2.000
ELIM EXT PAV MRK & MRKS (8")
LF 125.000 $1.250 $2.000 $2.000 $1.000 $4.000
ELIM EXT PAV MRK & MRKS (12")
LF 2,815.000 $2.000 $2.500 $2.250 $1.510 $4.000
ELIM EXT PAV MRK & MRKS (24")
LF 2,114.000 $2.500 $2.500 $2.500 $4.020 $5.000
PAV SURF PREP FOR MRK (4")
LF 96.000 $0.200 $0.300 $0.250 $0.540 $1.000
PAV SURF PREP FOR MRK (8")
LF 45.000 $0.400 $0.400 $0.300 $0.810 $2.000
PAV SURF PREP FOR MRK (12")
LF 3,446.000 $0.600 $0.500 $0.300 $1.060 $3.000
PAV SURF PREP FOR MRK (24")
LF 1,310.000 $1.000 $0.600 $0.400 $1.610 $4.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 16.000 $20.000 $0.700 $25.000 $21.690 $30.000
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
LF 160.000 $3.000 $10.000 $2.000 $1.960 $3.000
PED POLE ASSEMBLY
EA 1.000 $1,100.000 $2,000.000 $3,500.000 $2,561.920 $2,500.000
INSTALL OF VEHICLE DETECTORS
LF 20,000.000 $2.000 $0.500 $0.100 $9.390 $15.000
REMOVAL OF TIMBER POLES
EA 2.000 $350.000 $500.000 $250.000 $442.860 $1,000.000
REMOVAL OF SIGNAL HEAD ASSM
EA 1.000 $200.000 $500.000 $150.000 $268.400 $150.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 106.000 $100.000 $50.000 $50.000 $74.080 $50.000
INSTALL OF PEDESTRIAN PUSH BUTTONS
EA 106.000 $400.000 $200.000 $250.000 $106.270 $400.000
RETROFIT DET WARN SURF(SURF APP OR CIP)
EA 5.000 $350.000 $500.000 $450.000 $872.300 $2,200.000
Totals: $1,693,999.150 $1,680,038.500 $2,046,450.800 $2,298,873.356 $3,809,805.700